BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Ryze by Aum: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/ryze-by
 -aum/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-779-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20251231
DTEND;VALUE=DATE:20260101
SUMMARY:Ryze by Aum: Construction start\, promised for December 2025
DESCRIPTION:Date published by the developer: December 2025.\nSource: https:
 //dubairealestateiq.com/project/ryze-by-aum (read on 23 Nov 2026).\nRecord
  with all sources: https://kolaboro.com/projects/ryze-by-aum/#delivery\nTh
 is is the developer's date\, not a confirmation by Kolaboro. A period is p
 laced on its last day.
URL:https://kolaboro.com/projects/ryze-by-aum/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-779-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20280630
DTEND;VALUE=DATE:20280701
SUMMARY:Ryze by Aum: Handover or completion\, promised for June 2028
DESCRIPTION:Date published by the developer: June 2028.\nSource: https://du
 bairealestateiq.com/project/ryze-by-aum (read on 23 Nov 2026).\nRecord wit
 h all sources: https://kolaboro.com/projects/ryze-by-aum/#delivery\nThis i
 s the developer's date\, not a confirmation by Kolaboro. A period is place
 d on its last day.
URL:https://kolaboro.com/projects/ryze-by-aum/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
