BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Passo by Beyond: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/passo-b
 y-beyond/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-442-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20251231
DTEND;VALUE=DATE:20260101
SUMMARY:Passo by Beyond: Construction start\, promised for December 2025
DESCRIPTION:Date published by the developer: December 2025.\nSource: https:
 //dubairealestateiq.com/project/passo-by-beyond (read on 18 Nov 2026).\nRe
 cord with all sources: https://kolaboro.com/projects/passo-by-beyond/#deli
 very\nThis is the developer's date\, not a confirmation by Kolaboro. A per
 iod is placed on its last day.
URL:https://kolaboro.com/projects/passo-by-beyond/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-442-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20291231
DTEND;VALUE=DATE:20300101
SUMMARY:Passo by Beyond: Handover or completion\, promised for December 202
 9
DESCRIPTION:Date published by the developer: December 2029.\nSource: https:
 //dubairealestateiq.com/project/passo-by-beyond (read on 18 Nov 2026).\nRe
 cord with all sources: https://kolaboro.com/projects/passo-by-beyond/#deli
 very\nThis is the developer's date\, not a confirmation by Kolaboro. A per
 iod is placed on its last day.
URL:https://kolaboro.com/projects/passo-by-beyond/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
