BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Park Boulevard by Meteora: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/park-bo
 ulevard-by-meteora/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-861-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20231231
DTEND;VALUE=DATE:20240101
SUMMARY:Park Boulevard by Meteora: Construction start\, promised for Decemb
 er 2023
DESCRIPTION:Date published by the developer: December 2023.\nSource: https:
 //dubairealestateiq.com/project/park-boulevard-by-meteora (read on 23 Nov 
 2026).\nRecord with all sources: https://kolaboro.com/projects/park-boulev
 ard-by-meteora/#delivery\nThis is the developer's date\, not a confirmatio
 n by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/park-boulevard-by-meteora/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-861-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20270731
DTEND;VALUE=DATE:20270801
SUMMARY:Park Boulevard by Meteora: Handover or completion\, promised for Ju
 ly 2027
DESCRIPTION:Date published by the developer: July 2027.\nSource: https://du
 bairealestateiq.com/project/park-boulevard-by-meteora (read on 23 Nov 2026
 ).\nRecord with all sources: https://kolaboro.com/projects/park-boulevard-
 by-meteora/#delivery\nThis is the developer's date\, not a confirmation by
  Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/park-boulevard-by-meteora/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
