BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Nuvana by Wadan: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/nuvana-
 by-wadan/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-569-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250930
DTEND;VALUE=DATE:20251001
SUMMARY:Nuvana by Wadan: Construction start\, promised for September 2025
DESCRIPTION:Date published by the developer: September 2025.\nSource: https
 ://dubairealestateiq.com/project/nuvana-by-wadan (read on 21 Nov 2026).\nR
 ecord with all sources: https://kolaboro.com/projects/nuvana-by-wadan/#del
 ivery\nThis is the developer's date\, not a confirmation by Kolaboro. A pe
 riod is placed on its last day.
URL:https://kolaboro.com/projects/nuvana-by-wadan/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-569-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:Nuvana by Wadan: Handover or completion\, promised for September 20
 27
DESCRIPTION:Date published by the developer: September 2027.\nSource: https
 ://dubairealestateiq.com/project/nuvana-by-wadan (read on 21 Nov 2026).\nR
 ecord with all sources: https://kolaboro.com/projects/nuvana-by-wadan/#del
 ivery\nThis is the developer's date\, not a confirmation by Kolaboro. A pe
 riod is placed on its last day.
URL:https://kolaboro.com/projects/nuvana-by-wadan/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR