BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:MBL Signature: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/mbl-sig
 nature/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-615-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250531
DTEND;VALUE=DATE:20250601
SUMMARY:MBL Signature: Construction start\, promised for May 2025
DESCRIPTION:Date published by the developer: May 2025.\nSource: https://dub
 airealestateiq.com/project/mbl-signature (read on 22 Nov 2026).\nRecord wi
 th all sources: https://kolaboro.com/projects/mbl-signature/#delivery\nThi
 s is the developer's date\, not a confirmation by Kolaboro. A period is pl
 aced on its last day.
URL:https://kolaboro.com/projects/mbl-signature/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-615-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:MBL Signature: Handover or completion\, promised for March 2027
DESCRIPTION:Date published by the developer: March 2027.\nSource: https://d
 ubairealestateiq.com/project/mbl-signature (read on 22 Nov 2026).\nRecord 
 with all sources: https://kolaboro.com/projects/mbl-signature/#delivery\nT
 his is the developer's date\, not a confirmation by Kolaboro. A period is 
 placed on its last day.
URL:https://kolaboro.com/projects/mbl-signature/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
