BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Mas Barsha Residency: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/mas-bar
 sha-residency/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-1125-construction_start-1@kolaboro.com
DTSTAMP:20261125T000000Z
DTSTART;VALUE=DATE:20241130
DTEND;VALUE=DATE:20241201
SUMMARY:Mas Barsha Residency: Construction start\, promised for November 20
 24
DESCRIPTION:Date published by the developer: November 2024.\nSource: https:
 //dubairealestateiq.com/project/mas-barsha-residency (read on 25 Nov 2026)
 .\nRecord with all sources: https://kolaboro.com/projects/mas-barsha-resid
 ency/#delivery\nThis is the developer's date\, not a confirmation by Kolab
 oro. A period is placed on its last day.
URL:https://kolaboro.com/projects/mas-barsha-residency/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-1125-handover-1@kolaboro.com
DTSTAMP:20261125T000000Z
DTSTART;VALUE=DATE:20261130
DTEND;VALUE=DATE:20261201
SUMMARY:Mas Barsha Residency: Handover or completion\, promised for Novembe
 r 2026
DESCRIPTION:Date published by the developer: November 2026.\nSource: https:
 //dubairealestateiq.com/project/mas-barsha-residency (read on 25 Nov 2026)
 .\nRecord with all sources: https://kolaboro.com/projects/mas-barsha-resid
 ency/#delivery\nThis is the developer's date\, not a confirmation by Kolab
 oro. A period is placed on its last day.
URL:https://kolaboro.com/projects/mas-barsha-residency/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
