BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Lincoln Star Residence II: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/lincoln
 -star-residence-ii/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-988-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250930
DTEND;VALUE=DATE:20251001
SUMMARY:Lincoln Star Residence II: Construction start\, promised for Septem
 ber 2025
DESCRIPTION:Date published by the developer: September 2025.\nSource: https
 ://dubairealestateiq.com/project/lincoln-star-residence-ii (read on 23 Nov
  2026).\nRecord with all sources: https://kolaboro.com/projects/lincoln-st
 ar-residence-ii/#delivery\nThis is the developer's date\, not a confirmati
 on by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/lincoln-star-residence-ii/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-988-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20270831
DTEND;VALUE=DATE:20270901
SUMMARY:Lincoln Star Residence II: Handover or completion\, promised for Au
 gust 2027
DESCRIPTION:Date published by the developer: August 2027.\nSource: https://
 dubairealestateiq.com/project/lincoln-star-residence-ii (read on 23 Nov 20
 26).\nRecord with all sources: https://kolaboro.com/projects/lincoln-star-
 residence-ii/#delivery\nThis is the developer's date\, not a confirmation 
 by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/lincoln-star-residence-ii/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
