BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Lexington: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/lexingt
 on-dubai/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-510-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250531
DTEND;VALUE=DATE:20250601
SUMMARY:Lexington: Construction start\, promised for May 2025
DESCRIPTION:Date published by the developer: May 2025.\nSource: https://dub
 airealestateiq.com/project/lexington (read on 21 Nov 2026).\nRecord with a
 ll sources: https://kolaboro.com/projects/lexington-dubai/#delivery\nThis 
 is the developer's date\, not a confirmation by Kolaboro. A period is plac
 ed on its last day.
URL:https://kolaboro.com/projects/lexington-dubai/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-510-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:Lexington: Handover or completion\, promised for September 2027
DESCRIPTION:Date published by the developer: September 2027.\nSource: https
 ://dubairealestateiq.com/project/lexington (read on 21 Nov 2026).\nRecord 
 with all sources: https://kolaboro.com/projects/lexington-dubai/#delivery\
 nThis is the developer's date\, not a confirmation by Kolaboro. A period i
 s placed on its last day.
URL:https://kolaboro.com/projects/lexington-dubai/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
