BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Island Living by Condor: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/island-
 living-by-condor/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-702-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250731
DTEND;VALUE=DATE:20250801
SUMMARY:Island Living by Condor: Construction start\, promised for July 202
 5
DESCRIPTION:Date published by the developer: July 2025.\nSource: https://du
 bairealestateiq.com/project/island-living-by-condor (read on 23 Nov 2026).
 \nRecord with all sources: https://kolaboro.com/projects/island-living-by-
 condor/#delivery\nThis is the developer's date\, not a confirmation by Kol
 aboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/island-living-by-condor/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-702-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20270131
DTEND;VALUE=DATE:20270201
SUMMARY:Island Living by Condor: Handover or completion\, promised for Janu
 ary 2027
DESCRIPTION:Date published by the developer: January 2027.\nSource: https:/
 /dubairealestateiq.com/project/island-living-by-condor (read on 23 Nov 202
 6).\nRecord with all sources: https://kolaboro.com/projects/island-living-
 by-condor/#delivery\nThis is the developer's date\, not a confirmation by 
 Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/island-living-by-condor/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
