BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Grand Polo - Equiterra: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/grand-p
 olo-equiterra/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-291-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:Grand Polo - Equiterra: Construction start\, promised for March 202
 6
DESCRIPTION:Date published by the developer: March 2026.\nSource: https://d
 ubairealestateiq.com/project/grand-polo-equiterra (read on 18 Nov 2026).\n
 Record with all sources: https://kolaboro.com/projects/grand-polo-equiterr
 a/#delivery\nThis is the developer's date\, not a confirmation by Kolaboro
 . A period is placed on its last day.
URL:https://kolaboro.com/projects/grand-polo-equiterra/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-291-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20290831
DTEND;VALUE=DATE:20290901
SUMMARY:Grand Polo - Equiterra: Handover or completion\, promised for Augus
 t 2029
DESCRIPTION:Date published by the developer: August 2029.\nSource: https://
 dubairealestateiq.com/project/grand-polo-equiterra (read on 18 Nov 2026).\
 nRecord with all sources: https://kolaboro.com/projects/grand-polo-equiter
 ra/#delivery\nThis is the developer's date\, not a confirmation by Kolabor
 o. A period is placed on its last day.
URL:https://kolaboro.com/projects/grand-polo-equiterra/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
