BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Grand Polo - Equiterra 2: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/grand-p
 olo-equiterra-2/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-288-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20260228
DTEND;VALUE=DATE:20260301
SUMMARY:Grand Polo - Equiterra 2: Construction start\, promised for Februar
 y 2026
DESCRIPTION:Date published by the developer: February 2026.\nSource: https:
 //dubairealestateiq.com/project/grand-polo-equiterra-2 (read on 18 Nov 202
 6).\nRecord with all sources: https://kolaboro.com/projects/grand-polo-equ
 iterra-2/#delivery\nThis is the developer's date\, not a confirmation by K
 olaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/grand-polo-equiterra-2/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-288-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20290731
DTEND;VALUE=DATE:20290801
SUMMARY:Grand Polo - Equiterra 2: Handover or completion\, promised for Jul
 y 2029
DESCRIPTION:Date published by the developer: July 2029.\nSource: https://du
 bairealestateiq.com/project/grand-polo-equiterra-2 (read on 18 Nov 2026).\
 nRecord with all sources: https://kolaboro.com/projects/grand-polo-equiter
 ra-2/#delivery\nThis is the developer's date\, not a confirmation by Kolab
 oro. A period is placed on its last day.
URL:https://kolaboro.com/projects/grand-polo-equiterra-2/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
