BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Franck Muller Yachting: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/franck-
 muller-yachting/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-557-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250731
DTEND;VALUE=DATE:20250801
SUMMARY:Franck Muller Yachting: Construction start\, promised for July 2025
DESCRIPTION:Date published by the developer: July 2025.\nSource: https://du
 bairealestateiq.com/project/franck-muller-yachting (read on 21 Nov 2026).\
 nRecord with all sources: https://kolaboro.com/projects/franck-muller-yach
 ting/#delivery\nThis is the developer's date\, not a confirmation by Kolab
 oro. A period is placed on its last day.
URL:https://kolaboro.com/projects/franck-muller-yachting/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-557-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20280731
DTEND;VALUE=DATE:20280801
SUMMARY:Franck Muller Yachting: Handover or completion\, promised for July 
 2028
DESCRIPTION:Date published by the developer: July 2028.\nSource: https://du
 bairealestateiq.com/project/franck-muller-yachting (read on 21 Nov 2026).\
 nRecord with all sources: https://kolaboro.com/projects/franck-muller-yach
 ting/#delivery\nThis is the developer's date\, not a confirmation by Kolab
 oro. A period is placed on its last day.
URL:https://kolaboro.com/projects/franck-muller-yachting/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
