BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Essenlife Residence: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/essenli
 fe-residence/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-461-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20250531
DTEND;VALUE=DATE:20250601
SUMMARY:Essenlife Residence: Construction start\, promised for May 2025
DESCRIPTION:Date published by the developer: May 2025.\nSource: https://dub
 airealestateiq.com/project/essenlife-residence (read on 18 Nov 2026).\nRec
 ord with all sources: https://kolaboro.com/projects/essenlife-residence/#d
 elivery\nThis is the developer's date\, not a confirmation by Kolaboro. A 
 period is placed on its last day.
URL:https://kolaboro.com/projects/essenlife-residence/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-461-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20280331
DTEND;VALUE=DATE:20280401
SUMMARY:Essenlife Residence: Handover or completion\, promised for March 20
 28
DESCRIPTION:Date published by the developer: March 2028.\nSource: https://d
 ubairealestateiq.com/project/essenlife-residence (read on 18 Nov 2026).\nR
 ecord with all sources: https://kolaboro.com/projects/essenlife-residence/
 #delivery\nThis is the developer's date\, not a confirmation by Kolaboro. 
 A period is placed on its last day.
URL:https://kolaboro.com/projects/essenlife-residence/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
