BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Er İnşaat Sultan Evleri IV: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/er-insa
 at-sultan-evleri-iv/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:IST-206-handover-1@kolaboro.com
DTSTAMP:20261125T000000Z
DTSTART;VALUE=DATE:20291231
DTEND;VALUE=DATE:20300101
SUMMARY:Er İnşaat Sultan Evleri IV: Handover or completion\, promised for
  31 Dec 2029
DESCRIPTION:Date published by the developer: 31 Dec 2029.\nSource: https://
 konutprojeleri.com/er-insaat-sultan-evleri-iv (read on 25 Nov 2026).\nReco
 rd with all sources: https://kolaboro.com/projects/er-insaat-sultan-evleri
 -iv/#delivery\nThis is the developer's date\, not a confirmation by Kolabo
 ro. A period is placed on its last day.
URL:https://kolaboro.com/projects/er-insaat-sultan-evleri-iv/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
