BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Edgewater Residences 3: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/edgewat
 er-residences-3/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-815-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20241130
DTEND;VALUE=DATE:20241201
SUMMARY:Edgewater Residences 3: Construction start\, promised for November 
 2024
DESCRIPTION:Date published by the developer: November 2024.\nSource: https:
 //dubairealestateiq.com/project/edgewater-residences-3 (read on 23 Nov 202
 6).\nRecord with all sources: https://kolaboro.com/projects/edgewater-resi
 dences-3/#delivery\nThis is the developer's date\, not a confirmation by K
 olaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/edgewater-residences-3/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-815-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20270131
DTEND;VALUE=DATE:20270201
SUMMARY:Edgewater Residences 3: Handover or completion\, promised for Janua
 ry 2027
DESCRIPTION:Date published by the developer: January 2027.\nSource: https:/
 /dubairealestateiq.com/project/edgewater-residences-3 (read on 23 Nov 2026
 ).\nRecord with all sources: https://kolaboro.com/projects/edgewater-resid
 ences-3/#delivery\nThis is the developer's date\, not a confirmation by Ko
 laboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/edgewater-residences-3/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
