BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:DAMAC Riverside - Sage: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/damac-r
 iverside-sage/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-337-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20240930
DTEND;VALUE=DATE:20241001
SUMMARY:DAMAC Riverside - Sage: Construction start\, promised for September
  2024
DESCRIPTION:Date published by the developer: September 2024.\nSource: https
 ://dubairealestateiq.com/project/damac-riverside-sage (read on 18 Nov 2026
 ).\nRecord with all sources: https://kolaboro.com/projects/damac-riverside
 -sage/#delivery\nThis is the developer's date\, not a confirmation by Kola
 boro. A period is placed on its last day.
URL:https://kolaboro.com/projects/damac-riverside-sage/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-337-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:DAMAC Riverside - Sage: Handover or completion\, promised for Decem
 ber 2027
DESCRIPTION:Date published by the developer: December 2027.\nSource: https:
 //dubairealestateiq.com/project/damac-riverside-sage (read on 18 Nov 2026)
 .\nRecord with all sources: https://kolaboro.com/projects/damac-riverside-
 sage/#delivery\nThis is the developer's date\, not a confirmation by Kolab
 oro. A period is placed on its last day.
URL:https://kolaboro.com/projects/damac-riverside-sage/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
