BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:DAMAC Islands 2 - Barbados 1: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/damac-i
 slands-2-barbados-1/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-343-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20260531
DTEND;VALUE=DATE:20260601
SUMMARY:DAMAC Islands 2 - Barbados 1: Construction start\, promised for May
  2026
DESCRIPTION:Date published by the developer: May 2026.\nSource: https://dub
 airealestateiq.com/project/damac-islands-2-barbados-1 (read on 18 Nov 2026
 ).\nRecord with all sources: https://kolaboro.com/projects/damac-islands-2
 -barbados-1/#delivery\nThis is the developer's date\, not a confirmation b
 y Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/damac-islands-2-barbados-1/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-343-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20300630
DTEND;VALUE=DATE:20300701
SUMMARY:DAMAC Islands 2 - Barbados 1: Handover or completion\, promised for
  June 2030
DESCRIPTION:Date published by the developer: June 2030.\nSource: https://du
 bairealestateiq.com/project/damac-islands-2-barbados-1 (read on 18 Nov 202
 6).\nRecord with all sources: https://kolaboro.com/projects/damac-islands-
 2-barbados-1/#delivery\nThis is the developer's date\, not a confirmation 
 by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/damac-islands-2-barbados-1/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
