BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Claydon House by Ellington: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/claydon
 -house-by-ellington/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-430-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20240531
DTEND;VALUE=DATE:20240601
SUMMARY:Claydon House by Ellington: Construction start\, promised for May 2
 024
DESCRIPTION:Date published by the developer: May 2024.\nSource: https://dub
 airealestateiq.com/project/claydon-house-by-ellington (read on 18 Nov 2026
 ).\nRecord with all sources: https://kolaboro.com/projects/claydon-house-b
 y-ellington/#delivery\nThis is the developer's date\, not a confirmation b
 y Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/claydon-house-by-ellington/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-430-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:Claydon House by Ellington: Handover or completion\, promised for D
 ecember 2027
DESCRIPTION:Date published by the developer: December 2027.\nSource: https:
 //dubairealestateiq.com/project/claydon-house-by-ellington (read on 18 Nov
  2026).\nRecord with all sources: https://kolaboro.com/projects/claydon-ho
 use-by-ellington/#delivery\nThis is the developer's date\, not a confirmat
 ion by Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/claydon-house-by-ellington/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
