BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Christian A. Rockefeller Tower: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/christi
 an-a-rockefeller-tower/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-1089-handover-1@kolaboro.com
DTSTAMP:20261125T000000Z
DTSTART;VALUE=DATE:20300630
DTEND;VALUE=DATE:20300701
SUMMARY:Christian A. Rockefeller Tower: Handover or completion\, promised f
 or June 2030
DESCRIPTION:Date published by the developer: June 2030.\nSource: https://du
 bairealestateiq.com/developer/lmd-ventures-buying-and-selling-of-real-esta
 te-l-l-c (read on 25 Nov 2026).\nRecord with all sources: https://kolaboro
 .com/projects/christian-a-rockefeller-tower/#delivery\nThis is the develop
 er's date\, not a confirmation by Kolaboro. A period is placed on its last
  day.
URL:https://kolaboro.com/projects/christian-a-rockefeller-tower/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
