BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Cedarwood Estates-South: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/cedarwo
 od-estates-south/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-453-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Cedarwood Estates-South: Construction start\, promised for December
  2026
DESCRIPTION:Date published by the developer: December 2026.\nSource: https:
 //dubairealestateiq.com/project/cedarwood-estates-south (read on 18 Nov 20
 26).\nRecord with all sources: https://kolaboro.com/projects/cedarwood-est
 ates-south/#delivery\nThis is the developer's date\, not a confirmation by
  Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/cedarwood-estates-south/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-453-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20290131
DTEND;VALUE=DATE:20290201
SUMMARY:Cedarwood Estates-South: Handover or completion\, promised for Janu
 ary 2029
DESCRIPTION:Date published by the developer: January 2029.\nSource: https:/
 /dubairealestateiq.com/project/cedarwood-estates-south (read on 18 Nov 202
 6).\nRecord with all sources: https://kolaboro.com/projects/cedarwood-esta
 tes-south/#delivery\nThis is the developer's date\, not a confirmation by 
 Kolaboro. A period is placed on its last day.
URL:https://kolaboro.com/projects/cedarwood-estates-south/#delivery
TRANSP:TRANSPARENT
END:VEVENT