BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Canal Crown de GRISOGONO: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/canal-c
 rown-de-grisogono/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-165-handover-1@kolaboro.com
DTSTAMP:20261113T000000Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:Canal Crown de GRISOGONO: Handover or completion\, promised for Q4 
 2027
DESCRIPTION:Date published by the developer: Q4 2027.\nSource: https://www.
 damacproperties.com/en/projects/canal-crown/ (read on 13 Nov 2026).\nRecor
 d with all sources: https://kolaboro.com/projects/canal-crown-de-grisogono
 /#delivery\nThis is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day.
URL:https://kolaboro.com/projects/canal-crown-de-grisogono/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
