BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Butterfly: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/butterf
 ly-dubai/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-654-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250131
DTEND;VALUE=DATE:20250201
SUMMARY:Butterfly: Construction start\, promised for January 2025
DESCRIPTION:Date published by the developer: January 2025.\nSource: https:/
 /dubairealestateiq.com/project/butterfly (read on 23 Nov 2026).\nRecord wi
 th all sources: https://kolaboro.com/projects/butterfly-dubai/#delivery\nT
 his is the developer's date\, not a confirmation by Kolaboro. A period is 
 placed on its last day.
URL:https://kolaboro.com/projects/butterfly-dubai/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-654-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20290131
DTEND;VALUE=DATE:20290201
SUMMARY:Butterfly: Handover or completion\, promised for January 2029
DESCRIPTION:Date published by the developer: January 2029.\nSource: https:/
 /dubairealestateiq.com/project/butterfly (read on 23 Nov 2026).\nRecord wi
 th all sources: https://kolaboro.com/projects/butterfly-dubai/#delivery\nT
 his is the developer's date\, not a confirmation by Kolaboro. A period is 
 placed on its last day.
URL:https://kolaboro.com/projects/butterfly-dubai/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
