BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Bellavion by Sunrise: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/bellavi
 on-by-sunrise/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-721-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20250531
DTEND;VALUE=DATE:20250601
SUMMARY:Bellavion by Sunrise: Construction start\, promised for May 2025
DESCRIPTION:Date published by the developer: May 2025.\nSource: https://dub
 airealestateiq.com/project/bellavion-by-sunrise (read on 23 Nov 2026).\nRe
 cord with all sources: https://kolaboro.com/projects/bellavion-by-sunrise/
 #delivery\nThis is the developer's date\, not a confirmation by Kolaboro. 
 A period is placed on its last day.
URL:https://kolaboro.com/projects/bellavion-by-sunrise/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-721-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:Bellavion by Sunrise: Handover or completion\, promised for Decembe
 r 2027
DESCRIPTION:Date published by the developer: December 2027.\nSource: https:
 //dubairealestateiq.com/project/bellavion-by-sunrise (read on 23 Nov 2026)
 .\nRecord with all sources: https://kolaboro.com/projects/bellavion-by-sun
 rise/#delivery\nThis is the developer's date\, not a confirmation by Kolab
 oro. A period is placed on its last day.
URL:https://kolaboro.com/projects/bellavion-by-sunrise/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
