BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Avarra by Palace: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/avarra-
 by-palace/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-321-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20260531
DTEND;VALUE=DATE:20260601
SUMMARY:Avarra by Palace: Construction start\, promised for May 2026
DESCRIPTION:Date published by the developer: May 2026.\nSource: https://dub
 airealestateiq.com/project/avarra-by-palace (read on 18 Nov 2026).\nRecord
  with all sources: https://kolaboro.com/projects/avarra-by-palace/#deliver
 y\nThis is the developer's date\, not a confirmation by Kolaboro. A period
  is placed on its last day.
URL:https://kolaboro.com/projects/avarra-by-palace/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-321-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20310630
DTEND;VALUE=DATE:20310701
SUMMARY:Avarra by Palace: Handover or completion\, promised for June 2031
DESCRIPTION:Date published by the developer: June 2031.\nSource: https://du
 bairealestateiq.com/project/avarra-by-palace (read on 18 Nov 2026).\nRecor
 d with all sources: https://kolaboro.com/projects/avarra-by-palace/#delive
 ry\nThis is the developer's date\, not a confirmation by Kolaboro. A perio
 d is placed on its last day.
URL:https://kolaboro.com/projects/avarra-by-palace/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
