BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Athlon by Al Dar: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/athlon-
 by-al-dar/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-490-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20240731
DTEND;VALUE=DATE:20240801
SUMMARY:Athlon by Al Dar: Construction start\, promised for July 2024
DESCRIPTION:Date published by the developer: July 2024.\nSource: https://du
 bairealestateiq.com/project/athlon-by-al-dar-1 (read on 21 Nov 2026).\nRec
 ord with all sources: https://kolaboro.com/projects/athlon-by-al-dar/#deli
 very\nThis is the developer's date\, not a confirmation by Kolaboro. A per
 iod is placed on its last day.
URL:https://kolaboro.com/projects/athlon-by-al-dar/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-490-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20280930
DTEND;VALUE=DATE:20281001
SUMMARY:Athlon by Al Dar: Handover or completion\, promised for September 2
 028
DESCRIPTION:Date published by the developer: September 2028.\nSource: https
 ://dubairealestateiq.com/project/athlon-by-al-dar-1 (read on 21 Nov 2026).
 \nRecord with all sources: https://kolaboro.com/projects/athlon-by-al-dar/
 #delivery\nThis is the developer's date\, not a confirmation by Kolaboro. 
 A period is placed on its last day.
URL:https://kolaboro.com/projects/athlon-by-al-dar/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR