BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Al Habtoor Tower: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/al-habt
 oor-tower/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-642-construction_start-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20221031
DTEND;VALUE=DATE:20221101
SUMMARY:Al Habtoor Tower: Construction start\, promised for October 2022
DESCRIPTION:Date published by the developer: October 2022.\nSource: https:/
 /dubairealestateiq.com/project/al-habtoor-tower (read on 22 Nov 2026).\nRe
 cord with all sources: https://kolaboro.com/projects/al-habtoor-tower/#del
 ivery\nThis is the developer's date\, not a confirmation by Kolaboro. A pe
 riod is placed on its last day.
URL:https://kolaboro.com/projects/al-habtoor-tower/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-642-handover-1@kolaboro.com
DTSTAMP:20261123T000000Z
DTSTART;VALUE=DATE:20261231
DTEND;VALUE=DATE:20270101
SUMMARY:Al Habtoor Tower: Handover or completion\, promised for December 20
 26
DESCRIPTION:Date published by the developer: December 2026.\nSource: https:
 //dubairealestateiq.com/project/al-habtoor-tower (read on 22 Nov 2026).\nR
 ecord with all sources: https://kolaboro.com/projects/al-habtoor-tower/#de
 livery\nThis is the developer's date\, not a confirmation by Kolaboro. A p
 eriod is placed on its last day.
URL:https://kolaboro.com/projects/al-habtoor-tower/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
