BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Kolaboro//Promised dates 1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:31 Above by Beyond: promised dates (Kolaboro)
X-WR-CALDESC:This is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day. https://kolaboro.com/projects/31-abov
 e-by-beyond/#delivery
REFRESH-INTERVAL;VALUE=DURATION:P1D
X-PUBLISHED-TTL:P1D
BEGIN:VEVENT
UID:DXB-438-construction_start-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20260430
DTEND;VALUE=DATE:20260501
SUMMARY:31 Above by Beyond: Construction start\, promised for April 2026
DESCRIPTION:Date published by the developer: April 2026.\nSource: https://d
 ubairealestateiq.com/project/31-above-by-beyond (read on 18 Nov 2026).\nRe
 cord with all sources: https://kolaboro.com/projects/31-above-by-beyond/#d
 elivery\nThis is the developer's date\, not a confirmation by Kolaboro. A 
 period is placed on its last day.
URL:https://kolaboro.com/projects/31-above-by-beyond/#delivery
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:DXB-438-handover-1@kolaboro.com
DTSTAMP:20261118T000000Z
DTSTART;VALUE=DATE:20281231
DTEND;VALUE=DATE:20290101
SUMMARY:31 Above by Beyond: Handover or completion\, promised for December 
 2028
DESCRIPTION:Date published by the developer: December 2028.\nSource: https:
 //dubairealestateiq.com/project/31-above-by-beyond (read on 18 Nov 2026).\
 nRecord with all sources: https://kolaboro.com/projects/31-above-by-beyond
 /#delivery\nThis is the developer's date\, not a confirmation by Kolaboro.
  A period is placed on its last day.
URL:https://kolaboro.com/projects/31-above-by-beyond/#delivery
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
