{"type":"kolaboro-delta-v1","from":{"day":"2026-11-12","sha256":"48669c97d332e7da2d24fb169daabc896624bb4f3cd66b77b2ee346bf1ef6a2d","head":"014459c8e0ca49324699f4e5641c0f0804fcbdab2457f50bf717713d0d69c737","projects_sha256":"76e0e3d291a3f1a748e4d25d7158fd8a8cb99c4f24a1be8fea8adea033648d2d"},"to":{"day":"2026-11-13","sha256":"7acc1dfebfffe61e43eab6c4db5e2c497700e7ac8629755a1bf0a02908dea9d9","head":"9345c845c93c2d798fd80766e2bd15ea736ab38064b6dc29ca1fba38bb8d550f","projects_sha256":"b1cc34228f59eb402a3488ec663a0ea73f43445440511f3e43c07a4901c6a9c9"},"counts":{"added":0,"removed":0,"changed":1595,"projects_after":1595},"apply":"Start from the \"projects\" of the from-day file, keyed by \"s\" (slug). Delete every slug in \"removed\"; add every record in \"added\"; for each slug in \"changed\" set the fields in \"set\" and delete the fields in \"unset\". Sort by slug: the canonical JSON (keys sorted, no spaces, JavaScript number format) of the list has SHA-256 to.projects_sha256.","added":[],"removed":[],"changed":{"1-market-square-inlet-district":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","official register for Vancouver not looked up on the review date","https://kolaboro.com/registers/"],"ho":["not checked","date on record Mid 2029 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: official register for Vancouver not looked up on the review date","handover status not resolved"]}}},"100-avenue-road-swiss-cottage-arada-london":{"set":{"rvw":null}},"111-menerung-brdb":{"set":{"rvw":null}},"156-elara-mi-vida":{"set":{"rvw":null}},"16-alexander-tower-lagos":{"set":{"rvw":null}},"175-east-82nd-street-douglaston":{"set":{"rvw":null}},"23-square-oba-23-projects":{"set":{"rvw":null}},"237-lulu-nairobi":{"set":{"rvw":null}},"255-east-77th-street":{"set":{"rvw":null}},"265-elmer-one-centum-real-estate":{"set":{"rvw":null}},"29-aleja-poland":{"set":{"rvw":null}},"3300-gulf-shore-kolter-urban":{"set":{"rvw":null}},"6-palma-balearics":{"set":{"rvw":null}},"6080-yonge":{"set":{"rvw":null}},"618-flower-estate":{"set":{"rvw":null}},"619-brickell-by-nobu":{"set":{"rvw":null}},"77-clarendon-toronto":{"set":{"rvw":null}},"888-brickell-dolce-gabbana-jds":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77226 \"888 BRICKELL CONDO\", developer entity named in the filing","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Condominium filed with Florida DBPR (PR77226)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Site bought for $61.2M in 2024 with a $35.7M G4 loan","verified","independent","https://therealdeal.com/miami/2026/10/09/michael-sterns-brickell-supertall-site-seeking-investors/"],["Construction financing in place","contradicted","independent","https://therealdeal.com/miami/2026/10/09/michael-sterns-brickell-supertall-site-seeking-investors/"],["Completion 2029","unverified","none","https://www.groundbreak.city/miami/888-brickell-dolce-gabbana-approved-brickell"],["About $350M of presales","unverified","none","https://therealdeal.com/miami/2026/04/08/heres-where-michael-sterns-miami-condo-projects-stand/"],["1,049 ft height cleared","verified","independent","https://www.condogrid.io/news/jds-shops-a-minority-stake-in-its-1049-foot-dolce-gabbana-tower-at-888-brickell"],["259 residences","unverified","none","https://www.condogrid.io/news/jds-shops-a-minority-stake-in-its-1049-foot-dolce-gabbana-tower-at-888-brickell"],["Developer has delivered major towers (Brooklyn Tower, 111 W 57th)","unverified","none","https://jdsdevelopment.com/"],["Deposits held in escrow","unverified","none","https://jdsdevelopment.com/"],["Project free of disputes","contradicted","independent","https://therealdeal.com/miami/2026/04/08/heres-where-michael-sterns-miami-condo-projects-stand/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2029) comes from the sources listed on the page.","https://jdsdevelopment.com/"],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"developer","permit":"registry","developer":"registry"},"miss":null},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77226","code":"PR77226","checked":"2026-11-13"}}},"a-a-towers-lagos":{"set":{"rvw":null}},"abay-joly-almaty":{"set":{"rvw":null}},"abora-adeje-tenerife":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["none","no date published","https://metrovacesa.com/en/developments/tenerife/adeje/abora"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"acquarello-residences-playa-flamingo":{"set":{"rvw":null}},"adagio-cancelada-metrovacesa":{"set":{"rvw":null}},"address-residences-al-marjan-island":{"set":{"cl":[["Project registered with RAK RERA (Emaar Development P.S.C)","verified","registry","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list"],["Emaar is a registered RAK developer","verified","registry","https://mun.rak.ae/wp-content/uploads/2024/09/3-%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B7%D9%88%D8%B1%D9%8A%D9%86-2024Sep.pdf"],["Completion February 2028 (Emaar factsheet)","unverified","none","https://www.mitchellscommercialrealty.com/projects/address-residences-al-marjan-island"],["Handover Q4 2028 (broker) vs Q1 2028 / March 2028","contradicted","none","https://www.propertyfinder.ae/en/new-projects/emaar-properties/address-residences"],["Payment plan 10/70/20 (broker) vs 10/80/10 (Property Finder)","contradicted","none","https://www.propertyfinder.ae/en/new-projects/emaar-properties/address-residences"],["1,100+ units","unverified","none","https://www.emaar.com/en/our-communities/address-al-marjan-island-ras-al-khaimah"],["Phase 1 sold out","unverified","none","https://rakcompare.ae/project/address-residences"],["Phase 2 launch from 1 Nov 2026","unverified","none","https://emaarsales.my.site.com/customers/AnnouncementDetailsPrint?id=a0xSl00000034a9IAA"],["1BR from AED 1.74M","unverified","none","https://insiderealty.ae/en/projects/emaar-address-residences-al-marjan-island-ras-al-khaimah-for-sale"],["Freehold for any nationality on Al Marjan Island","unverified","none","https://www.savills.ae/new-developments/address-residences-al-marjan-island.aspx"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Address Residences Al Marjan Island\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["listed","RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"ho":["none","The developer community page prints no date; the date on record comes from an Emaar factsheet quoted by an agency.","https://www.emaar.com/en/our-communities/address-al-marjan-island-ras-al-khaimah"],"co":null,"sq":{"handover":"portal","permit":"registry","price":"portal","developer":"registry"},"miss":null},"src":["https://bestofmarjanisland.com/construction-updates/address-residences-al-marjan-island","https://emaarsales.my.site.com/customers/AnnouncementDetailsPrint?id=a0xSl00000034a9IAA","https://insiderealty.ae/en/projects/emaar-address-residences-al-marjan-island-ras-al-khaimah-for-sale","https://mun.rak.ae/wp-content/uploads/2024/09/3-%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B7%D9%88%D8%B1%D9%8A%D9%86-2024Sep.pdf","https://rakcompare.ae/project/address-residences","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list","https://www.emaar.com/en/our-communities/address-al-marjan-island-ras-al-khaimah","https://www.mitchellscommercialrealty.com/projects/address-residences-al-marjan-island","https://www.propertyfinder.ae/en/new-projects/emaar-properties/address-residences","https://www.savills.ae/new-developments/address-residences-al-marjan-island.aspx","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"url":"https://www.emaar.com/en/our-communities/address-al-marjan-island-ras-al-khaimah"}},"addressbali-pererenan":{"set":{"rvw":null}},"adeena-malta":{"set":{"rvw":null}},"aedas-zeta-avenue-malaga":{"set":{"cl":[["Developer AEDAS Homes S.A. is a registered company (Registro Mercantil de Madrid hoja M-627.110)","verified","independent","https://www.neinorhomes.com/news/neinor-homes-successfully-completes-950mn-acquisition-of-aedas-homes-and-consolidates-spanish-national-champion/"],["AEDAS delivered 5,211 homes in FY 2024-25","verified","independent","https://brainsre.news/aedas-entrega-5211-viviendas-ultimo-ejercicio-fiscal/"],["AEDAS is now about 97% owned by Neinor Homes","verified","independent","https://forbes.es/economia/884989/neinor-se-hace-con-un-968-del-capital-de-aedas-por-923-millones-de-euros-tras-concluir-su-segunda-opa/"],["124 homes of 1 to 3 bedrooms","verified","independent","https://www.elespanol.com/malaga/malaga-ciudad/20241213/ladrillo-gruas-llegan-distrito-zeta-barrio-futuro-malaga-aedas-arranca-obra-primeras-viviendas/908409382_0.html"],["Construction started December 2024","verified","independent","https://www.alimarket.es/construccion/noticia_amp/r554312/aedas-homes-supera-las-250-viviendas-en-distrito-zeta-con-el-lanzamiento-de-su-tercer-proyecto--zeta-place"],["Delivery Q1 2027 (early 2027)","verified","independent","https://www.que.es/2026/06/15/aedas-homes-137-viviendas-malaga-distrito-zeta/"],["Building licence granted","unverified","none","https://www.elespanol.com/malaga/malaga-ciudad/20240810/gran-barrio-futuro-malaga-calienta-tramitan-licencias-viviendas-distrito-zeta/876912554_0.html"],["Payments on account","unverified","none","https://www.aedashomes.com/promo-zeta-avenue-pisos-obra-nueva-malaga"],["Prices from 340,000 EUR ex-VAT","contradicted","none","https://www.aedashomes.com/promo-zeta-avenue-pisos-obra-nueva-malaga"],["45% of homes sold (early 2025)","unverified","none","https://www.alimarket.es/construccion/noticia_amp/r554312/aedas-homes-supera-las-250-viviendas-en-distrito-zeta-con-el-lanzamiento-de-su-tercer-proyecto--zeta-place"],["Located on parcel R-1.8 of sector SUNP-G.2 Sanchez Blanca","unverified","none","https://www.aedashomes.com/dam/jcr:b43887cc-ab6f-436b-847e-8e6ae4ba6333/AEDAS_MEMORIA_ECO_ZETA%20AVENUE%20V.0.pdf"],["Freehold title open to foreign buyers","unverified","none","https://www.aedashomes.com/promo-zeta-avenue-pisos-obra-nueva-malaga"],["The developer page read on 13 Nov 2026 prints: \"Fecha prevista de entrega: 1 TR 2027\"","unverified","none","https://www.aedashomes.com/promo-zeta-avenue-pisos-obra-nueva-malaga"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Fecha prevista de entrega: 1 TR 2027\"","https://www.aedashomes.com/promo-zeta-avenue-pisos-obra-nueva-malaga"],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"developer"},"miss":null}}},"aedas-zeta-valley-malaga":{"set":{"rvw":null}},"aenaon-park-residences-crystal-waters":{"set":{"rvw":null}},"aerogate-homes-budapest":{"set":{"rvw":null}},"aethera-residences-uoa-johor-bahru":{"set":{"rvw":null}},"affinity-broadbeach":{"set":{"rvw":null}},"aguilar-point-argentina":{"set":{"rvw":null}},"ahrensfelder-obstwiesen":{"set":{"rvw":null}},"aila-sunset-residences-rodney-bay":{"set":{"rvw":null}},"aire-de-llevant-metrovacesa":{"set":{"rvw":null}},"aire-gardens-leeds-hilton-developments":{"set":{"rvw":null}},"aivazovsky-residential-complex-yerevan":{"set":{"rvw":null}},"ajman-one-phase-2-aqaar":{"set":{"rvw":null}},"ajwan-khorfakkan-residences-shurooq":{"set":{"rvw":null}},"akamas-bay-villas":{"set":{"rvw":null}},"aktea-residences-4":{"set":{"rvw":null}},"al-ghaf-tower-tiger":{"set":{"cl":[["50 floors, 378 fully furnished apartments","unverified","none","https://www.tigergroup.ae/EventsAndNewsDetails/21265"],["Launch on 31 Jan 2026","contradicted","none","https://alnair.ae/en/news/tiger-properties-launches-al-ghaf-in-al-khan-sharjah"],["Construction started 10 Mar 2026","unverified","none","https://www.propertyfinder.ae/en/new-projects/tiger-properties/al-ghaf-tower"],["Handover Q1 2029","unverified","none","https://foundgroup.ae/new-launches/al-ghaf-tower-ref-op-1911"],["Starting price AED 699,000 (another agent: AED 812,590)","contradicted","none","https://foundgroup.ae/new-launches/al-ghaf-tower-ref-op-1911"],["Payment plan 10/50/10/30 vs 10/40/50","contradicted","none","https://alghaftower.com/"],["Freehold for all nationalities","unverified","none","https://alroyarealestate.com/en/projects/al-ghaf-tower-sharjah/"],["Tiger Group handed over more than 3,000 units 2014-2017","unverified","none","https://www.zawya.com/en/press-release/tiger-group-announced-the-completion-and-delivery-of-its-al-manara-tower-pmvowz7k"],["Tiger Group founded in 1976","verified","independent","https://en.wikipedia.org/wiki/Tiger_Group"],["Escrow account","unverified","none","https://www.tigergroup.ae/EventsAndNewsDetails/21265"],["The developer page read on 13 Nov 2026 prints: \"Tiger Properties Announces the Launch of Al GhAF Tower in Sharjah 7-May-2026\"","unverified","none","https://www.tigergroup.ae/EventsAndNewsDetails/21265"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["none","Developer launch announcement of 7 May 2026; no handover date in it.","https://www.tigergroup.ae/EventsAndNewsDetails/21265"],"co":null,"sq":{"handover":"developer","price":"portal","developer":"developer"},"miss":null},"url":"https://www.tigergroup.ae/EventsAndNewsDetails/21265"}},"al-mare-green-midtown-group":{"set":{"rvw":null}},"al-mare-torn-tallinn":{"set":{"rvw":null}},"al-sidr-saadiyat-lagoons":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2027-Q3) was not re-checked.",null],"co":null,"sq":{"handover":"press","permit":"registry","price":"press","developer":"registry"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"al-yazan-muttrah-waterfront":{"set":{"rvw":null}},"al-yazan-phase-1a-va-group":{"set":{"rvw":null}},"alaia-embraed":{"set":{"rvw":null}},"alam-al-roum-qatari-diar":{"set":{"rvw":null}},"alba-real-peru":{"set":{"rvw":null}},"aldea-kalan-aldea-kalan":{"set":{"rvw":null}},"aldea-tulum-plus":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"registry"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)"]}}},"alero-vallarta-sten":{"set":{"rvw":null}},"alex-villas-laguna-complex-7":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","developer":"developer"},"miss":null}}},"alhambra-parc":{"set":{"rvw":null}},"allegra-garden-place":{"set":{"rvw":null}},"alliance-centropolis-alliance-group":{"set":{"rvw":null}},"allure-alenda-golf":{"set":{"rvw":null}},"almanar-makkah":{"set":{"rvw":null}},"almazara-views-3":{"set":{"cl":[["\"Fase 3: Noviembre 2026.\" Phases 1 (October 2023) and 2 (November 2024) are marked as sold","unverified","none","https://taylorwimpeyspain.com/es/casa/almazara-views-townhouses-istan-malaga/"],["Phase 3 has 12 townhouses; prices from EUR 590,000","unverified","none","https://taylorwimpeyspain.com/es/casa/almazara-views-townhouses-istan-malaga/"],["Pin: GPS coordinates printed on the developer page; the address is the one published by the developer","unverified","none","https://taylorwimpeyspain.com/es/casa/almazara-views-townhouses-istan-malaga/"],["The developer page read on 13 Nov 2026 prints: \"Fase 1: Octubre 2023. Vendida. Fase 2: Noviembre 2024. Vendida. Fase 3: Noviembre 2026\"","unverified","none","https://taylorwimpeyspain.com/es/casa/almazara-views-townhouses-istan-malaga/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["phased","Phases 1 and 2 are marked sold; phase 3 is dated November 2026 (unit table: 04-11-2026), a date that passed on 4 November 2026 with no handover notice on the page.","https://taylorwimpeyspain.com/es/casa/almazara-views-townhouses-istan-malaga/"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"alona-french-alps":{"set":{"rvw":null}},"alpha-place-libertador-argentina":{"set":{"rvw":null}},"altan-emaar":{"set":{"cl":[["Project registered with DLD (project 3608)","verified","registry","https://dubairealestateiq.com/project/altan"],["Escrow account at Emirates NBD","verified","registry","https://datadubai.ae/projects/altan/"],["Construction under way, 11.06% at last inspection","verified","registry","https://dubairealestateiq.com/project/altan"],["Handover Q3 2029","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/altan"],["479 residential units","verified","registry","https://datadubai.ae/projects/altan/"],["Emaar has delivered over 80,500 UAE units","verified","independent","https://feeds.dfm.ae/documents/2026/Feb/12/54f34a1e-707c-4a43-aad6-e5c29cb52900/Emaar%20Development%20Q4.pdf"],["Price from AED 1,813,888","unverified","none","https://www.emaar.com/en/properties/altan-at-dubai-creek-harbour"],["Trakheesi permit 1567347778","unverified","none","https://choueri-uae.com/project/altan/"],["Freehold for all nationalities","unverified","none","https://www.schmidtandpartner.com/off-plan/altan-by-emaar"],["DLD project register: project 3608, status Active, completion date on the register 31 Jul 2029, 11.06% built at the DLD inspection of 2 Jul 2026, escrow account bank Emirates Nbd Bank, registered developer Dubai Creek Harbour L.L.C (DLD developer 1224) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/altan"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/altan"],"ho":["future","DLD register completion 31 Jul 2029; 11.06% built at the inspection of 2 Jul 2026","https://dubairealestateiq.com/project/altan"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/altan"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"st":"under construction"}},"altera-residences":{"set":{"rvw":null}},"altezza-luxury-tower":{"set":{"rvw":null}},"altintas-700-unit-project-aksu":{"set":{"rvw":null}},"altintas-swim-up-complex-ayt-3204":{"set":{"rvw":null}},"altitude-de-grisogono":{"set":{"rvw":null}},"altura-160-costa-del-sol":{"set":{"rvw":null}},"amaiya-blocks-e-f-garden-city":{"set":{"rvw":null}},"amalfi-tower-cartagena":{"set":{"rvw":null}},"amali-luxury-residence":{"set":{"rvw":null}},"aman-residences-amanjena-aman-o-capital":{"set":{"rvw":null}},"aman-residences-niseko":{"set":{"rvw":null}},"amancaya-aman-residences-exuma":{"set":{"rvw":null}},"amani-melasti":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q2) comes from the sources listed on the page.","https://www.teus-group.com/amani-melasti"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"portal","developer":"developer"},"miss":null}}},"amani-villas-central-kuta-lombok":{"set":{"rvw":null}},"amanvari-residences-aman-private-villas-at-costa-palmas-los":{"set":{"rvw":null}},"amanzira-aquasol":{"set":{"rvw":null}},"amare-seafront-villas-misr-italia":{"set":{"rvw":null}},"amari-villas-iii":{"set":{"rvw":null}},"amarina-villas-necker-property":{"set":{"rvw":null}},"amazi-hawana-salalah-muriya":{"set":{"rvw":null}},"ambar-residences-orlando-big-key-group":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found","Florida DBPR condominium filings (developer summary, searched by name and address)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028) comes from the sources listed on the page.","https://thebigkeygroup.com/projects"],"co":null,"sq":{"handover":"press","permit":"developer","price":"press","developer":"press"},"miss":["not found on the official register: Florida DBPR condominium filings (developer summary, searched by name and address)"]}}},"amberwood-at-holland-singapore":{"set":{"rvw":null}},"amethyst-springs-kilimani-gy-group":{"set":{"rvw":null}},"amiba-bukit-bintang-amiba":{"set":{"rvw":null}},"amoenus-casangular-exclusive":{"set":{"rvw":null}},"amra-residences-citi-developers":{"set":{"rvw":null}},"anantara-dragon-seseh-bali":{"set":{"rvw":null}},"anantara-miami-resort-residences":{"set":{"rvw":null}},"anantara-mina-residences-ras-al-khaimah":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/rak-properties/anantara-mina"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Anantara Mina Ras Al Khaimah Residences\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"Anantara Mina Ras Al Khaimah Residences\", In progress), read 13 Nov 2026"},"rvw":null,"src":["https://gulfnews.com/business/property/sales-of-anantara-homes-on-hayat-island-begins-1.500116827","https://www.propertyfinder.ae/en/new-projects/rak-properties/anantara-mina","https://www.rakproperties.ae/our-properties/anantara-residences/","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"anantara-residences-ubud-bali-minor-wika-realty":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2026-Q4) comes from the sources listed on the page.","https://www.anantaraubud-residences.com/"],"co":null,"sq":{"permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"anava-samui-zhongfa":{"set":{"rvw":null}},"andare-residences-pininfarina-related":{"set":{"rvw":null}},"anei-lombok-pt-anei-living-experience":{"set":{"rvw":null}},"anga-zanzibar-lzdm":{"set":{"rvw":null}},"angel-village-islington-bentry-capital":{"set":{"rvw":null}},"angelina-antibes-marignan":{"set":{"rvw":null}},"anissa-heights":{"set":{"rvw":null}},"anjuna-bay":{"set":{"rvw":null}},"anjuna-palms-uluwatu":{"set":{"rvw":null}},"anta-residence-canggu":{"set":{"rvw":null}},"antalya-suites-sur-yapi":{"set":{"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Turkey","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://www.suryapi.com.tr/projelerimiz/sur-yapi-antalya-suites"],"co":null,"sq":{"handover":"portal","price":"portal"},"miss":null},"url":"https://www.suryapi.com.tr/projelerimiz/sur-yapi-antalya-suites"}},"anwa-aria-dubai":{"set":{"rvw":null}},"apartamenty-beethovena":{"set":{"rvw":null}},"apartamenty-grzybowska-11":{"set":{"rvw":null}},"apartamenty-kamienskiego":{"set":{"rvw":null}},"apartamenty-literacka":{"set":{"rvw":null}},"apartamenty-metro-wilanowska":{"set":{"rvw":null}},"apartamenty-mysliborska-park":{"set":{"rvw":null}},"apartamenty-park-matecznego":{"set":{"rvw":null}},"apartamenty-rudnickiego":{"set":{"rvw":null}},"apice-towers":{"set":{"rvw":null}},"apres-coco-del-mar-efc-group":{"set":{"rvw":null}},"aqua-moraira":{"set":{"rvw":null}},"aquarous-jomtien-pattaya-assetwise":{"set":{"cl":[["ONEP EIA register lists report 256707-6 for \"โครงการ อควารัส จอมเทียน พัทยา (Aquarous Jomtien Pattaya)\" with approval ทส 1009.5/19659 (no date shown)","verified","registry","https://eia.onep.go.th/services/web/open-api/eia-list?page=139"],["EIA approved","verified","independent","https://www.forbesthailand.com/news/property/assetwise-expands-eec-market-creating-aquarus-jomtien-pattaya-project-value-5000-million-baht"],["Piling ceremony 10 Dec 2024","verified","independent","https://th.neothai.com/news/construction/2164.html"],["Structure 94.33% complete (Oct 2026)","unverified","none","https://assetwise.co.th/en/condominium/aquarous-jomtien-pattaya/"],["Completion November 2027 / Q4 2027","unverified","none","https://assetwise.co.th/en/news/aquarous-jomtien-pattaya/"],["606 residential units in two towers (portal says 1 tower)","contradicted","none","https://www.9asset.com/en/condo-project/aquarous-jomtien-pattaya-464124"],["Project value THB 5,000M","verified","independent","https://www.forbesthailand.com/news/property/assetwise-expands-eec-market-creating-aquarus-jomtien-pattaya-project-value-5000-million-baht"],["Developer delivered four Eastern Seaboard projects","verified","independent","https://www.forbesthailand.com/news/property/assetwise-expands-eec-market-creating-aquarus-jomtien-pattaya-project-value-5000-million-baht"],["Price from THB 4.21M","verified","independent","https://www.forbesthailand.com/news/property/assetwise-expands-eec-market-creating-aquarus-jomtien-pattaya-project-value-5000-million-baht"],["46% sold (Aug 2026)","unverified","none","https://de.linkedin.com/posts/alexander-reifenschneider-derpattayamakler_aquarous-jomtien-in-pattaya-hat-ende-august-activity-7492820343925964800-UIW3"],["Penthouses from THB 95M (2025) vs top price THB 80M (2024)","contradicted","none","https://assetwise.co.th/en/news/aquarous-jomtien-pattaya/"]],"ev":{"permit":"Thailand ONEP EIA open register: report 256707-6, approval ทส 1009.5/19659 (read 13 Nov 2026)","progress":"Developer posts monthly progress by trade (Oct 2026: structure 94.33%, architecture 49.95%, MEP 51.48%); agent reports overall 57.5% end Aug 2026","plans":"Unit size ranges only on pages opened","record":"Forbes Thailand names four earlier AssetWise Eastern Seaboard projects; AssetWise is a public company","returns_ok":"No rental or guarantee language seen"},"pn":"EIA report 256707-6, ONEP approval ทส 1009.5/19659","rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Thailand ONEP EIA register (report 256707-6, approval ทส 1009.5/19659)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["not checked","date on record 2027-Q4 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"press"},"miss":["handover status not resolved"]},"rw":{"register":"Thailand ONEP EIA register","item":"environmental approval","status":"approved","detail":"approval ทส 1009.5/19659","code":"256707-6","checked":"2026-11-13"},"src":["https://assetwise.co.th/condominium/aquarous-jomtien-pattaya/","https://assetwise.co.th/en/condominium/aquarous-jomtien-pattaya/","https://assetwise.co.th/en/news/aquarous-jomtien-pattaya/","https://de.linkedin.com/posts/alexander-reifenschneider-derpattayamakler_aquarous-jomtien-in-pattaya-hat-ende-august-activity-7492820343925964800-UIW3","https://th.neothai.com/news/construction/2164.html","https://www.9asset.com/en/condo-project/aquarous-jomtien-pattaya-464124","https://www.forbesthailand.com/news/property/assetwise-expands-eec-market-creating-aquarus-jomtien-pattaya-project-value-5000-million-baht","https://eia.onep.go.th/services/web/open-api/eia-list?page=139"]}},"arada-akala-residences":{"set":{"cl":[["Trakheesi permit 1480538491 (not visible on agency page text on 1 Nov 2026)","unverified","none","https://a1properties.ae/project-details/akala-hotels-and-residences-zaabeel-dubai"],["Registered with DLD as project 3745 by Arada Developments L.L.C S.O.C","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/akala-hotels-and-residences"],["Escrow account at Commercial Bank of Dubai","verified","registry","https://www.prop971.com/project/PRJ-ARA-JTDHW"],["Handover Q4 2029","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/akala-hotels-and-residences"],["Construction started (1.88% built)","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/akala-hotels-and-residences"],["Prices from AED 3.79 million","verified","registry","https://doment.ai/projects/akala-hotels-and-residences-by-arada"],["Payment plan 10/50/40 (Arada); agencies show 40/60, 10/45/45 and 5/35/60","contradicted","none","https://www.prop971.com/project/PRJ-ARA-JTDHW"],["Residential plus hotel keys in two towers (284 residential units in Tower 1, 354 hotel keys/units in Tower 2)","verified","registry","https://floxcy.com/offplan/3745"],["Arada has completed over 8,800 homes at Aljada","verified","independent","https://www.wam.ae/en/article/bzmom55-arada-hands-over-first-homes-vida-residences"],["Arada founded 2017, Dubai-based","unverified","none","https://en.wikipedia.org/wiki/Arada_(company)"],["Arada holds Fitch and Moody's ratings and issued sukuk","unverified","none","https://en.wikipedia.org/wiki/Arada_(company)"],["Freehold title for foreign buyers","unverified","none","https://a1properties.ae/project-details/akala-hotels-and-residences-zaabeel-dubai"],["DLD project register: project 3745, status Active, completion date on the register 31 Oct 2029, 0.1% built at the DLD inspection of 9 Jul 2026, escrow account bank Commercial Bank Of Dubai(Psc), registered developer Arada Developments L.L.C S.O.C (DLD developer 1409) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/akala-hotels-and-residences"]],"rvw":null,"src":["https://a1properties.ae/project-details/akala-hotels-and-residences-zaabeel-dubai","https://doment.ai/projects/akala-hotels-and-residences-by-arada","https://en.wikipedia.org/wiki/Arada_(company)","https://floxcy.com/offplan/3745","https://propqa.ai/off-plan-projects/arada-developments-llc-soc/akala-residences","https://www.arada.com/en/akala/","https://www.arada.com/en/latest-news/arada-completes-construction-at-aljadas-naseej-district-as-handover-of-138-homes-at-il-teatro-residences-buildings-begins/","https://www.arada.com/en/latest-news/arada-unveils-masaar-3-the-newest-chapter-of-the-uaes-bestselling-forest-community/","https://www.mitchellscommercialrealty.com/off-plan/akala-hotels-and-residences","https://www.prop971.com/project/PRJ-ARA-JTDHW","https://www.wam.ae/en/article/bzmom55-arada-hands-over-first-homes-vida-residences","https://dubairealestateiq.com/project/akala-hotels-and-residences"]}},"arancia-yards-beyond":{"set":{"cl":[["Registered with DLD (project 4480)","verified","registry","https://dubairealestateiq.com/developer/omniyat"],["Escrow account at ADCB","verified","registry","https://dxbpropy.ai/offplan/arancia-yards-by-beyond-city-of-arabia-b3778"],["Handover Q1 2029 (register: 30 Oct 2028)","verified","registry","https://dxbpropy.ai/offplan/arancia-yards-by-beyond-city-of-arabia-b3778"],["Construction starts 30 Oct 2026 (0% at last inspection)","verified","registry","https://booknewproperty.com/projects/beyond-arancia-yards/"],["284 registry units: 272 apartments plus 12 retail","verified","registry","https://booknewproperty.com/projects/beyond-arancia-yards/"],["1BR from AED 1.3m (another agent says from AED 999k)","unverified","none","https://withlevel8.com/en/projets/arancia-yards"],["Net yield up to 15% per year; 8% long term net rent","unverified","none","https://withlevel8.com/en/projets/arancia-yards"],["About 245 of 272 apartments sold by Sep 2026 (third party snapshot)","unverified","none","https://dxbpropy.ai/offplan/arancia-yards-by-beyond-city-of-arabia-b3778"],["Omniyat group has finished projects on the register (10), with 4 cancelled","verified","registry","https://dubairealestateiq.com/developer/omniyat"],["Freehold tenure","unverified","none","https://beyondyards.ae/arancia"],["DLD project register: project 4480, status Active, completion date on the register 30 Oct 2028, 0% built at the DLD inspection of 18 May 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Peninsula Elit Real Estate Development L.L.C S.O.C (DLD developer 2551) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/arancia-yards-by-beyond"]],"rvw":null,"src":["https://beyondyards.ae/arancia","https://beyondyards.ae/arancia/brochure","https://beyondyards.ae/arancia/payment-plan","https://booknewproperty.com/projects/beyond-arancia-yards/","https://dubairealestateiq.com/developer/omniyat","https://dxbpropy.ai/offplan/arancia-yards-by-beyond-city-of-arabia-b3778","https://withlevel8.com/en/projets/arancia-yards","https://dubairealestateiq.com/project/arancia-yards-by-beyond"]}},"aravita-residence":{"set":{"rvw":null}},"archi-central-park":{"set":{"rvw":null}},"archi-universe-tbilisi":{"set":{"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Georgia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q2) comes from the sources listed on the page.","https://archi.ge/en/complex/archi-universe"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"portal","developer":"press"},"miss":null},"url":"https://archi.ge/en/complex/archi-universe"}},"are-guling-valley-lombok":{"set":{"rvw":null}},"arica-andaman-seri-tanjung-pinang":{"set":{"rvw":null}},"arise-hill-sansai-ornsirin":{"set":{"rvw":null}},"armada-praxis-yal-kavak-marinn-bodrum":{"set":{"rvw":null}},"armani-beach-residences-palm-jumeirah-arada":{"set":{"cl":[["Registered with DLD (project 2889)","verified","registry","https://dubairealestateiq.com/project/armani-beach-residences-at-palm-jumeirah"],["Escrow account (Emirates Islamic Bank)","verified","registry","https://dubairealestateiq.com/project/armani-beach-residences-at-palm-jumeirah"],["Delivery by end of 2027","verified","registry","https://dubairealestateiq.com/project/armani-beach-residences-at-palm-jumeirah"],["Handover Q4 2026 (still shown on some listings)","contradicted","registry","https://www.prop971.com/project/PRJ-ARA-N6A8L"],["Construction under way after piling and shoring (10.17% Jul 2026)","verified","registry","https://dubairealestateiq.com/project/armani-beach-residences-at-palm-jumeirah"],["57 homes","verified","registry","https://dubairealestateiq.com/project/armani-beach-residences-at-palm-jumeirah"],["AED 678m contract awarded to China Railway Group subsidiary","unverified","none","https://www.arada.com/en/latest-news/arada-awards-aed678-million-construction-contract-for-armani-beach-residences-at-palm-jumeirah-to-china-railway-group-subsidiary/"],["Arada delivered 1,117 homes at Nasma Residences and over 9,000 at Aljada","unverified","none","https://www.arada.com/en/latest-news/arada-completes-construction-at-aljadas-naseej-district-as-handover-of-138-homes-at-il-teatro-residences-buildings-begins/"],["Project value AED 700m per Land Department","unverified","none","https://propsearch.ae/dubai/armani-beach-residences-palm-jumeirah"],["Price from AED 23m (launch from AED 20m to 21m)","unverified","none","https://foundgroup.ae/new-launches/armani-beach-residence-ref-op-0927"],["DLD project register: project 2889, status Active, completion date on the register 31 Dec 2027, 10.17% built at the DLD inspection of 20 Jul 2026, escrow account bank Emirates Islamic Bank, registered developer Arada Developments L.L.C S.O.C (DLD developer 1409) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/armani-beach-residences-at-palm-jumeirah"]],"rvw":null}},"armani-hallson-klcc-armani-group":{"set":{"rvw":null}},"armani-residences-masaryk-mira":{"set":{"rvw":null}},"aro-residences-platja-daro-metrovacesa":{"set":{"rvw":null}},"artistry-one-residences-select-group":{"set":{"cl":[["Registered with DLD (project 4259)","verified","registry","https://dubairealestateiq.com/project/artistry-one-residences"],["Escrow account (Emirates NBD)","verified","registry","https://dubairealestateiq.com/project/artistry-one-residences"],["Handover Q1 2029 (register 9 Feb 2029; one agent shows 31 Mar 2029)","verified","registry","https://dubairealestateiq.com/project/artistry-one-residences"],["Construction stage: not started at last inspection (0%, 14 Jan 2026)","verified","registry","https://dubairealestateiq.com/project/artistry-one-residences"],["1BR from about AED 2.35m (registered 1BR median AED 2.4m)","verified","registry","https://dubairealestateiq.com/project/artistry-one-residences"],["232 units in one tower (one agent lists 49 units)","verified","registry","https://dubairealestateiq.com/project/artistry-one-residences"],["Developer has 20 finished projects in Dubai","verified","registry","https://dubairealestateiq.com/developer/select-group"],["Freehold ownership","unverified","none","https://uae-prop.com/properties/artistry-residences/"],["Service charge AED 19 per sq ft","unverified","none","https://takweenaldar.ae/en/off-plan/project/artistry-one-residences"],["DLD project register: project 4259, status Active, completion date on the register 9 Feb 2029, 0% built at the DLD inspection of 14 Jan 2026, escrow account bank Emirates Nbd Bank, registered developer Select Global Development L.L.C (DLD developer 972) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/artistry-one-residences"]],"rvw":null}},"aruga-resort-residences-mactan-rockwell":{"set":{"rvw":null}},"aruna-belize-phase-4":{"set":{"rvw":null}},"arya-lombok-residence-mawi-lombok":{"set":{"rvw":null}},"arya-sumba-kodi-arya-properties":{"set":{"rvw":null}},"aryam-villas-ajmal-makan":{"set":{"rvw":null}},"ashiyana-heights-phuket":{"set":{"rvw":null}},"aspira-hills-phases-3b-and-4":{"set":{"rvw":null}},"aspirz-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/danube-properties/aspirz"],["DLD project register: project 3838, status Active, completion date on the register 31 Dec 2028, 5.08% built at the DLD inspection of 30 Jul 2026, escrow account bank First Abu Dhabi Bank, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/aspirz-by-danube"]],"ev":{"permit":"Registered as DLD project 3838, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 30 Jul 2026: 5.08% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Danube Properties Development L.L.C (DLD developer 1009)","handover_promised":"2028-Q4"},"pn":"DLD project registration 3838","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/aspirz-by-danube"],"ho":["future","DLD register completion 31 Dec 2028; 5.08% built at the inspection of 30 Jul 2026","https://dubairealestateiq.com/project/aspirz-by-danube"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/aspirz-by-danube"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://danubeproperties.com/portfolio/aspirz/","https://therealtytoday.com/news/danube-launches-aspirz-in-dubai-sports-city-with-first-ever-1-office-ownership-plan","https://www.constructionworld.in/amp/latest-construction-news/real-estate-news/danube-launches-aspirz-with-1-per-cent-plan-for-office-ownership-/77957","https://www.propertyfinder.ae/en/new-projects/danube-properties/aspirz","https://dubairealestateiq.com/project/aspirz-by-danube"],"st":"under construction"}},"astra-infinite-chiang-mai":{"set":{"rvw":null}},"ata-ehir-173-istanbul":{"set":{"rvw":null}},"atalaya-ocean-view-kuta-lombok":{"set":{"rvw":null}},"atrium-gardens-the-ellinikon-little-athens":{"set":{"rvw":null}},"aura-condominium-rawai-the-one-group":{"set":{"rvw":null}},"aura-melbourne-square-osk-property":{"set":{"rvw":null}},"aura-wellness-resort":{"set":{"rvw":null}},"aurios-emerge-mota-engil":{"set":{"rvw":null}},"australy-thera-neinor-aedas":{"set":{"rvw":null}},"autograph-collection-damac-hills":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q2, 2027\"","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-community/projects/autograph-collection/"],["A collection of villas in DAMAC Hills limited to 50 homes, as the page says","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-community/projects/autograph-collection/"],["DLD project register: project 3035, status Active, completion date on the register 30 May 2027, 9.41% built at the DLD inspection of 6 Jun 2026, escrow account bank First Abu Dhabi Bank, registered developer Damac Crescent Properties (DLD developer 954) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-hills-autograph-collection"]],"ev":{"permit":"Registered as DLD project 3035, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 6 Jun 2026: 9.41% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Damac Crescent Properties (DLD developer 954)","handover_promised":"2027-Q2","unit_types":["villa"]},"pn":"DLD project registration 3035","rvw":null,"src":["https://www.damacproperties.com/en/communities/damac-hills-community/projects/autograph-collection/","https://dubairealestateiq.com/project/damac-hills-autograph-collection"]}},"avalon-buddha-club-house":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2028; developer page read on 13 Nov 2026: \"ᐉ Off-Plan Apartments in Bali Prime Location | BUDDHA Completion 2028 from $84 900 from 1\"","https://avalonbali.com/projects/buddha"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"avalon-om-club-house":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2026; developer page read on 13 Nov 2026: \"ᐉ Off-Plan Apartments in Bali from $199,000 | OM Club House Completion 2026 from $199 000 from 3\"","https://avalonbali.com/projects/om"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"avalon-tao-club-house":{"set":{"cl":[["Developer page states completion 2028 and prices from US$89,900 (IDR 1.6 billion)","verified","developer","https://avalonbali.com/projects/tao"],["Developer page says real estate investments in Bali \"provide up to 20% returns per year\" (general statement, not a guarantee for this project)","unverified","none","https://avalonbali.com/projects/tao"],["Completion in 2028","unverified","none","https://avalonbali.com/projects/tao"],["Construction has started","unverified","none","https://avalonbali.com/news"],["Ribas Hotels Group will manage TAO (Avalon news only)","unverified","none","https://www.avalonbali.com/news/avalon-ribas-strategic-partnership"],["129 apartments","unverified","none","https://avalonbali.com/projects/tao"],["Price from $89,000 (1.4B IDR)","unverified","none","https://avalonbali.com/projects/tao"],["Value rises from $110,000 to $180,000 after completion","unverified","none","https://avalonbali.com/projects/tao"],["32+32 year leasehold","unverified","none","https://avalonbali.com/projects/tao"],["Building permit (PBG) issued","unverified","none","https://avalonbali.com/projects/tao"],["Projected ROI 12-14%","unverified","none","https://avalonbali.com/projects/tao"],["Developer has completed earlier residential projects","unverified","none","https://avalonbali.com/news/other-avalon-projects-more-than-just-development"]],"ev":{"progress":"Only a presentation news item (21 Mar 2025); no construction updates in news feed as of 31 Oct 2026","plans":"Unit sizes only","record":"OM Club House is Avalon's first residential project and is not yet handed over; the only operating Avalon businesses named are a gaming club (Cyberpunk) and a restaurant (Lula Kebab)","returns_ok":"No guaranteed-return wording on the developer page; it makes a general claim of up to 20% returns per year in Bali (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2028; checked against: Developer page states completion 2028 and prices from US$89,900 (IDR 1.6 billion)","https://avalonbali.com/projects/tao"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"avea-andaman-island-eastern-oriental":{"set":{"rvw":null}},"avenia-aventura-fendi-casa-vertical-developments":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77773 \"AVENIA AVENTURA BY FENDI CASA, A CONDO\", developer entity AVENTURA HARBOR HOLDING LLC","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Condominium filed with Florida DBPR (PR77773)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Site plan approved by City of Aventura (17 Mar 2025)","verified","registry","https://cityofaventura.com/DocumentCenter/View/133"],["Construction under way","contradicted","registry","https://cityofaventura.com/DocumentCenter/View/133"],["Completion in the first half of 2027","unverified","none","https://vertical-developments.com/fendi-casa-luxury-condo-coming-to-south-florida/"],["16-storey building","contradicted","registry","https://cityofaventura.com/DocumentCenter/View/133"],["22 residences","verified","independent","https://therealdeal.com/miami/2025/01/17/vertical-developments-launches-fendi-casa-branded-condos/"],["Prices from $5 million","verified","independent","https://therealdeal.com/miami/2025/01/17/vertical-developments-launches-fendi-casa-branded-condos/"],["Developer bought the site for $7.5M in 2023","verified","independent","https://therealdeal.com/miami/2025/01/17/vertical-developments-launches-fendi-casa-branded-condos/"],["Project financed (bridge loan $6.75M, Dec 2025)","unverified","none","https://broracapital.com/news-deal-closings/"],["Developer has delivered 30+ buildings","unverified","none","https://joshsteinrealtor.com/new-construction/avenia-aventura/"],["Escrow of deposits","unverified","none","https://aveniaaventura.com/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q2) comes from the sources listed on the page.","https://aveniaaventura.com/"],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"press","permit":"registry","price":"press","developer":"registry"},"miss":null},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77773","code":"PR77773","checked":"2026-11-13"}}},"avida-kigali-delta-developers":{"set":{"rvw":null}},"avrupa-konutlari-gunesli-artas":{"set":{"rvw":null}},"avva-broadbeach":{"set":{"rvw":null}},"aya-beachfront-residences-deyaar":{"set":{"rvw":null}},"azizi-grand-azizi":{"set":{"cl":[["Registered with DLD (project 2036)","verified","registry","https://dubairealestateiq.com/project/azizi-grand"],["Escrow account (Abu Dhabi Commercial Bank)","verified","registry","https://dubairealestateiq.com/project/azizi-grand"],["Handover Q4 2024 (original), then Q1 2026","contradicted","registry","https://propsearch.ae/dubai/azizi-grand"],["Handover September 2026 (current listings)","unverified","none","https://imatch.ae/projects/484"],["Registered completion 2 Feb 2025 passed with 82.06% built in June 2026","verified","registry","https://dubairealestateiq.com/project/azizi-grand"],["Construction started February 2018","contradicted","registry","https://dubairealestateiq.com/project/azizi-grand"],["431 apartments (register lists 411 units)","contradicted","registry","https://dubairealestateiq.com/project/azizi-grand"],["Studios from about AED 517k (registered studio median AED 550k)","verified","registry","https://dubairealestateiq.com/project/azizi-grand"],["Azizi has 91 finished projects on the register","verified","registry","https://dubairealestateiq.com/developer/azizi"],["Many Azizi projects are past their registered dates (Venice 1 to 5, Riviera Reve)","verified","registry","https://dubairealestateiq.com/developer/azizi"],["Freehold ownership","unverified","none","https://imatch.ae/projects/484"],["DLD project register: project 2036, status Active, completion date on the register 2 Feb 2025, 82.06% built at the DLD inspection of 24 Jun 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Azizi Developments L.L.C (DLD developer 1002) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/azizi-grand"]],"rvw":null}},"azizi-venice-14-dubai-south":{"set":{"cl":[["Registered with DLD (project 3073)","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/azizi-venice-14"],["Escrow account at Commercial Bank of Dubai","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/azizi-venice-14"],["Construction started May 2024","verified","registry","https://datadubai.ae/projects/azizi-venice-14/"],["Project is 'Ready' (Property Finder label)","contradicted","registry","https://uaepropertychecker.com/projects/azizi-venice-14"],["Delivery May/June 2026","contradicted","registry","https://uaepropertychecker.com/projects/azizi-venice-14"],["On track for targeted 2026 delivery (Azizi, Oct 2025)","contradicted","registry","https://uaepropertychecker.com/projects/azizi-venice-14"],["Venice 14 at 12% in Oct 2025 (Azizi)","verified","registry","https://datadubai.ae/projects/azizi-venice-14/"],["3,438 units in the project","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/azizi-venice-14"],["Developer licence valid","verified","registry","https://www.keyva.ae/dubai/projects/azizi-venice-14"],["Starting price AED 785,000","verified","registry","https://datadubai.ae/projects/azizi-venice-14/"],["Azizi has delivered more than 45,000 homes","verified","independent","https://www.khaleejtimes.com/business/property/dubai-azizi-set-to-deliver-nearly-7000-units-this-year"],["Freehold title","unverified","none","https://www.propertyfinder.ae/en/new-projects/azizi-developments/azizi-venice-14"],["DLD project register: project 3073, status Active, completion date on the register 30 May 2026, 30.29% built at the DLD inspection of 22 Jun 2026, escrow account bank Commercial Bank Of Dubai(Psc), registered developer Azizi Developments L.L.C (DLD developer 1002) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/azizi-venice-14"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/azizi-venice-14"],"ho":["passed-late","DLD register completion 30 May 2026; 30.29% built at the inspection of 22 Jun 2026","https://dubairealestateiq.com/project/azizi-venice-14"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/azizi-venice-14"],"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":null},"src":["https://datadubai.ae/projects/azizi-venice-14/","https://famproperties.com/completion-date/azizi-venice-14","https://uaepropertychecker.com/projects/azizi-venice-14","https://www.azizidevelopments.com/press/azizi-developments-accelerates-delivery-momentum-with-10-further-projects-set-for-handover-before-end-of-2026","https://www.azizidevelopments.com/press/azizi-developments-azizi-venice-reaches-29-construction-milestone","https://www.azizidevelopments.com/press/azizi-developments-marks-39-construction-milestone-at-azizi-venice-in-dubai-south","https://www.dubaisouthcapital.ae/blog/dubai-south-handover-tracker","https://www.dxbrealtor.ai/answers/azizi-venice-handover-date/","https://www.keyva.ae/dubai/projects/azizi-venice-14","https://www.khaleejtimes.com/business/property/dubai-azizi-set-to-deliver-nearly-7000-units-this-year","https://www.mitchellscommercialrealty.com/off-plan/azizi-venice-14","https://www.propertyfinder.ae/en/new-projects/azizi-developments/azizi-venice-14","https://dubairealestateiq.com/project/azizi-venice-14"]}},"azoria-living-suluban-beach-resort":{"set":{"rvw":null}},"azul-paraiso-vistas-garnier-garnier":{"set":{"rvw":null}},"azul-tower-boavista-real-estate":{"set":{"rvw":null}},"azura-beach-residences-3-4-al-mouj":{"set":{"rvw":null}},"azura-complex-nusa-dua":{"set":{"rvw":null}},"azure-by-lapis-lapis-properties":{"set":{"rvw":null}},"azure-heights-lj-projects":{"set":{"cl":[["Planning Authority permit PA/2539/25","unverified","none","https://www.ljprojectsltd.com/wp-content/uploads/2026/09/Roof_top_Swieqi_.pdf"],["Minor variation PA/04536/26 approved 24 Sep 2026","unverified","none","https://www.ljprojectsltd.com/wp-content/uploads/2026/09/Roof_top_Swieqi_.pdf"],["Completion December 2027","unverified","none","https://www.ljprojectsltd.com/developments/azure-heights/"],["12 units, 2 still for sale","unverified","none","https://www.ljprojectsltd.com/developments/azure-heights/"],["Prices from EUR 330,000","unverified","none","https://www.ljprojectsltd.com/developments/azure-heights/"],["Altura Swieqi completed Sep 2026","unverified","none","https://www.ljprojectsltd.com/"],["Developer company registered in Malta","unverified","none","https://www.ljprojectsltd.com/"],["Deposit protection","unverified","none","https://www.ljprojectsltd.com/developments/azure-heights/"],["The developer page read on 13 Nov 2026 prints: \"Completion is scheduled for December 2027 (Planning Authority permit PA/2539/25)\"","unverified","none","https://www.ljprojectsltd.com/developments/azure-heights/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Malta","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Completion is scheduled for December 2027 (Planning Authority permit PA/2539/25)\"","https://www.ljprojectsltd.com/developments/azure-heights/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"azure-icons-by-tm-costa-blanca":{"set":{"rvw":null}},"azure-michamvi-azure-united-properties":{"set":{"rvw":null}},"azurelia-france":{"set":{"rvw":null}},"azuya-seed-ancao-from-norfin":{"set":{"rvw":null}},"azzure-resort-life":{"set":{"rvw":null}},"bab-al-qasr-garden-residence-66-burtville":{"set":{"rvw":null}},"babacan-lagoon-istanbul":{"set":{"rvw":null}},"baccarat-residences-miami-related-group":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77172 \"444 BRICKELL ONE CONDO\", developer entity 444 BRICKELL ONE LLC (matched by the street address in the project name)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Florida DBPR Division of Condominiums developer summary lists approved project PR77636 \"444 BRICKELL TWO CONDO\", developer entity 444 BRICKELL TWO LLC (matched by the street address in the project name)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Condominium filed with Florida DBPR by 444 Brickell One LLC (project PR77172)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Master building permit issued by City of Miami Building Department","verified","independent","https://floridayimby.com/category/99-southeast-5th-street"],["Vertical permit application filed March 2022 by 444 Brickell Partners LLC, construction cost USD 241.6M","verified","independent","https://floridayimby.com/2022/06/foundation-permit-issued-for-47-story-residential-tower-at-77-se-5th-street-in-brickell.html"],["USD 328M construction loan secured","verified","independent","https://floridayimby.com/category/99-southeast-5th-street"],["Over 95% of residences sold since late-2021 launch","verified","independent","https://floridayimby.com/category/99-southeast-5th-street"],["Foundation poured August 2024 (10,000+ cubic yards)","verified","independent","https://floridayimby.com/category/john-moriarty-associates"],["Structure at 40 of 75 floors (Mar 2026)","verified","independent","https://www.linkedin.com/posts/oscarnunez34_construction-has-reached-the-40-story-mark-activity-7438238235165827072-mTyD"],["Completion early 2028","unverified","none","https://floridayimby.com/category/99-southeast-5th-street"],["360 residences (324 tower, 8 penthouses, 28 flats/duplexes)","unverified","none","https://baccaratresidences.miami/residences"],["Prices from USD 1M","unverified","none","https://luxurydade.com/blog/brickell-pre-construction-condos-complete-guide-2026"],["Deposits held in escrow","unverified","none","https://www.baccaratresidencesmiami.com/"]],"ev":{"permit":"Florida DBPR developer summary (official CSV, read 13 Nov 2026): PR77172 444 BRICKELL ONE CONDO by 444 BRICKELL ONE LLC; PR77636 444 BRICKELL TWO CONDO by 444 BRICKELL TWO LLC","escrow":"Nothing on the developer site; Florida condo law requires deposit escrow but the project does not publish its escrow agent","progress":"Florida YIMBY (via news coverage and LinkedIn repost of the 13 Mar 2026 article): 40 of 75 floors; foundation poured Aug 2024","plans":"Developer residences page describes flow-through layouts but no floor plan files were found","record":"Related Group is a long-established Miami condo developer; LuxuryDade agency guide states its record, project site lists none","returns_ok":"No rental guarantee or yield on the developer site"},"pn":"Florida DBPR condominium filing PR77172 and PR77636","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q1) comes from the sources listed on the page.","https://baccaratresidences.miami/residences"],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"developer","permit":"registry","price":"press","developer":"registry"},"miss":null},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77172, PR77636","code":"PR77172","checked":"2026-11-13"}}},"bahia-papagayo-enjoy-grupo-laguna":{"set":{"rvw":null}},"baia-azur-france":{"set":{"rvw":null}},"baia-vista-rebirth-development":{"set":{"rvw":null}},"balcon-de-finestrat":{"set":{"rvw":null}},"balducciododici":{"set":{"rvw":null}},"bali-benefit-reimagined-villas-ubud-2":{"set":{"rvw":null}},"bangsar-hill-park":{"set":{"rvw":null}},"banovo-brdo-residences-belgrade":{"set":{"rvw":null}},"bansko-complex-near-ski-lift-suprimmo":{"set":{"rvw":null}},"banyan-tree-beach-residences-nerea-banyan-group":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer"},"miss":null}}},"banyan-tree-beach-residences-oceanus":{"set":{"rvw":null}},"banyan-tree-bimini-resort-residences-rockwell-island-bahamas":{"set":{"rvw":null}},"bao-puerto-morelos-riviera-maya":{"set":{"rvw":null}},"basaksehir-avrasya-konutlari-cadde-fuzul-gyo":{"set":{"rvw":null}},"basaksehir-low-rise-mixed-use-148606":{"set":{"rvw":null}},"bashayer-modon-hudayriyat":{"set":{"rvw":null}},"batiyakasi-2-etap-kartal-emlak-konut-yildizlar":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Turkey","https://kolaboro.com/registers/"],"ho":["none","no date published","https://satis.emlakkonut.com.tr/proje/batiyakasi"],"co":null,"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null}}},"bay-grove-residences-nakheel-dubai-islands":{"set":{"cl":[["Registered on the DLD project register as project no. 3293 on 4 Oct 2024","verified","registry","https://dubairealestateiq.com/project/bay-grove-residences-dubai-islands"],["Escrow account held at First Abu Dhabi Bank","verified","registry","https://dubairealestateiq.com/project/bay-grove-residences-dubai-islands"],["Construction stage: 6.6% built at DLD inspection on 21 Jul 2026","verified","registry","https://dubairealestateiq.com/project/bay-grove-residences-dubai-islands"],["Developer entity Dubai Islands L.L.C registered with DLD (developer no. 105)","verified","registry","https://dubairealestateiq.com/project/bay-grove-residences-dubai-islands"],["Project has 296 units on the register","verified","registry","https://dubairealestateiq.com/project/bay-grove-residences-dubai-islands"],["Developer group track record on DLD: 3 finished projects (36 total, 31 active)","verified","registry","https://dubairealestateiq.com/developer/nakheel"],["Completion March 2028","verified","registry","https://dubairealestateiq.com/project/bay-grove-residences-dubai-islands"],["Launch price from AED 1.9M","unverified","none","https://www.propertyfinder.ae/en/new-projects/nakheel/bay-grove-residences"],["Four residential buildings","verified","registry","https://dubairealestateiq.com/project/bay-grove-residences-dubai-islands"],["Direct access to Crystal Beach","unverified","none","https://www.nakheel.com/en/new-launches/baygrove-residences"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/nakheel/bay-grove-residences"],["DLD project register: project 3293, status Active, completion date on the register 15 Mar 2028, 6.6% built at the DLD inspection of 21 Jul 2026, escrow account bank First Abu Dhabi Bank, registered developer Dubai Islands L.L.C (DLD developer 105) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/bay-grove-residences-dubai-islands"]],"rvw":null,"st":"under construction"}},"bay-one-residences-port-city-colombo":{"set":{"rvw":null}},"bay-residences-dubai-islands-nakheel":{"set":{"cl":[["Registered with DLD (project 2719)","verified","registry","https://dubairealestateiq.com/project/bay-residences-dubai-islands"],["Escrow account at Mashreq Bank","verified","registry","https://dubairealestateiq.com/project/bay-residences-dubai-islands"],["Handover Q4 2026 / October 2026","contradicted","registry","https://dubairealestateiq.com/project/bay-residences-dubai-islands"],["'Construction is progressing on schedule' (agent)","contradicted","registry","https://aigentsrealty.com/areas/dubai-islands/bay-residences-dubai-islands"],["Developer internal progress 42.61% vs RERA 28.80% for the Rixos development (Beach Residences component)","verified","registry","https://www.nakheel.com/en/construction-progress/rixos-dubai-islands-hotel-residences"],["Contractor Sembol Construction appointed Feb 2024","unverified","none","https://www.nakheel.com/en/media-centre/press-releases/news-detail/2024/02/02/nakheel-awards-rixos-bay-residences-and-villas-contract-to-sembol-construction"],["292 units (agents) vs 302 units (register)","verified","registry","https://dubairealestateiq.com/project/bay-residences-dubai-islands"],["1BR from about AED 2.5m (registered 1BR sale AED 2.52m, May 2026)","verified","registry","https://propsearch.ae/dubai/bay-residences-dubai-islands"],["Project value AED 622.9m per Land Department","unverified","none","https://propsearch.ae/dubai/bay-residences-dubai-islands"],["Nakheel developed Palm Jumeirah","unverified","none","https://alnair.ae/en/dubai/project/como-residences"],["DLD project register: project 2719, status Active, completion date on the register 15 Oct 2026, 47.88% built at the DLD inspection of 22 Jun 2026, escrow account bank Mashreq Bank Psc, registered developer Nakheel And Excelsior Real Estate L.L.C (DLD developer 1632) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/bay-residences-dubai-islands"]],"rvw":null}},"bayn-views-3-ora-developers":{"set":{"rvw":null}},"bayview-bahrain-bay-binaa":{"set":{"rvw":null}},"bayz-102-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/danube-properties/bayz-102"],["DLD project register: project 3125, status Active, completion date on the register 31 Dec 2029, 6.52% built at the DLD inspection of 6 Oct 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/bayz-102-by-danube"]],"ev":{"permit":"Registered as DLD project 3125, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Abu Dhabi Commercial Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 6 Oct 2026: 6.52% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Danube Properties Development L.L.C (DLD developer 1009)","handover_promised":"2029-Q4"},"pn":"DLD project registration 3125","rvw":null,"src":["https://danubeproperties.com/portfolio/bayz-102/","https://www.propertyfinder.ae/en/new-projects/danube-properties/bayz-102","https://dubairealestateiq.com/project/bayz-102-by-danube"],"st":"under construction"}},"bcons-binh-an-dong-tay-bcons-center-city":{"set":{"rvw":null}},"beach-walk-grand-2-by-imtiaz":{"set":{"cl":[["Estimated completion date published as \"Q4-2027\"","unverified","none","https://imtiaz.ae/property/beach-walk-grand-2-by-imtiaz"],["62 one-bedroom, 39 two-bedroom and 2 three-bedroom apartments, 3 three-bedroom duplexes and 2 four-bedroom duplexes (108 units)","unverified","none","https://imtiaz.ae/property/beach-walk-grand-2-by-imtiaz"],["Construction progress shown as 34% overall: sub-structure 100%, super-structure 84%, MEP works 2%, finishing works 5%","unverified","none","https://imtiaz.ae/property/beach-walk-grand-2-by-imtiaz"],["Payment plan published: 20% on booking, 40% during construction, 40% on completion","unverified","none","https://imtiaz.ae/property/beach-walk-grand-2-by-imtiaz"],["Map embedded on the developer page points to 25.299925, 55.295175","unverified","none","https://imtiaz.ae/property/beach-walk-grand-2-by-imtiaz"],["DLD project register: project 3724, status Active, completion date on the register 15 Dec 2027, 23.53% built at the DLD inspection of 14 Sep 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Ghd Real Estate Development L.L.C (DLD developer 1641) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/beach-walk-grand-2-by-imtiaz"],["The developer page read on 13 Nov 2026 prints: \"construction progress 34 overall ESTIMATED COMPLETION DATE Q4-2027\"","unverified","none","https://imtiaz.ae/property/beach-walk-grand-2-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3724, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 14 Sep 2026: 23.53% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3724","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/beach-walk-grand-2-by-imtiaz"],"ho":["future","DLD register completion 15 Dec 2027; 23.53% built at the inspection of 14 Sep 2026; developer page: \"construction progress 34 overall ESTIMATED COMPLETION DATE Q4-2027\"","https://dubairealestateiq.com/project/beach-walk-grand-2-by-imtiaz"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/beach-walk-grand-2-by-imtiaz"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://imtiaz.ae/property/beach-walk-grand-2-by-imtiaz","https://dubairealestateiq.com/project/beach-walk-grand-2-by-imtiaz"]}},"beach-walk-grand-by-imtiaz":{"set":{"cl":[["Estimated completion date published as \"Q4 - 2026\"; the payment plan puts the completion payment in November 2026","unverified","none","https://imtiaz.ae/property/beach-walk-grand-by-imtiaz"],["Ground, 2 podium parking levels, 12 residential floors and rooftop: 54 one-bedroom and 54 two-bedroom apartments and 4 three-bedroom penthouses (112 units)","unverified","none","https://imtiaz.ae/property/beach-walk-grand-by-imtiaz"],["Construction progress shown as 77% overall: substructure 100%, superstructure 100%, MEP works 61%, finishing works 78%","unverified","none","https://imtiaz.ae/property/beach-walk-grand-by-imtiaz"],["Payment plan published: 20% on booking (November 2024), 40% in instalments during construction, 40% on completion (November 2026)","unverified","none","https://imtiaz.ae/property/beach-walk-grand-by-imtiaz"],["Map embedded on the developer page points to 25.301391, 55.30171","unverified","none","https://imtiaz.ae/property/beach-walk-grand-by-imtiaz"],["DLD project register: project 3367, status Active, completion date on the register 25 Dec 2026, 53.22% built at the DLD inspection of 10 Aug 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Bwg Real Estate Development L.L.C (DLD developer 2067) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/beach-walk-grand-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3367, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 10 Aug 2026: 53.22% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3367","rvw":null,"src":["https://imtiaz.ae/property/beach-walk-grand-by-imtiaz","https://dubairealestateiq.com/project/beach-walk-grand-by-imtiaz"]}},"beach-walk-iii-by-imtiaz":{"set":{"cl":[["Estimated completion date published as \"Q2 2026\"; the FAQ says \"The anticipated completion and handover are scheduled for June 2026.\"","unverified","none","https://imtiaz.ae/property/beach-walk-iii-by-imtiaz"],["Construction progress shown as 95 overall: finishing works 93, MEP works 94, super-structure 100","unverified","none","https://imtiaz.ae/property/beach-walk-iii-by-imtiaz"],["Studios, 1 and 2-bedroom apartments on Dubai Islands, a 3-minute walk from the beach, next to the island's largest shopping mall (as the FAQ says)","unverified","none","https://imtiaz.ae/property/beach-walk-iii-by-imtiaz"],["Payment plan published: 20% on booking, 40% in instalments during construction, 40% on completion in June 2026","unverified","none","https://imtiaz.ae/property/beach-walk-iii-by-imtiaz"],["The map embedded on the page points to 25.2043, 55.1968, which is not on Dubai Islands, so no pin is set","unverified","none","https://imtiaz.ae/property/beach-walk-iii-by-imtiaz"],["DLD project register: project 3285, status Active, completion date on the register 14 Jun 2026, 82.01% built at the DLD inspection of 20 Jul 2026, escrow account bank United Bank Limited (Management Office), registered developer Imtiaz Real Estate Investment & Development L.L.C (DLD developer 1129) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/beach-walk-residences-3-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3285, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank United Bank Limited (Management Office) (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 20 Jul 2026: 82.01% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3285","rvw":null,"src":["https://imtiaz.ae/property/beach-walk-iii-by-imtiaz","https://dubairealestateiq.com/project/beach-walk-residences-3-by-imtiaz"]}},"beach-walk-residences-4-imtiaz":{"set":{"cl":[["Project registered with DLD (project 3707, Active)","verified","registry","https://dubairealestateiq.com/project/beach-walk-residences-4-by-imtiaz"],["Escrow account (First Abu Dhabi Bank)","verified","registry","https://dubairealestateiq.com/project/beach-walk-residences-4-by-imtiaz"],["Construction at 42.87% (DLD inspection 13 Aug 2026)","verified","registry","https://dubairealestateiq.com/project/beach-walk-residences-4-by-imtiaz"],["Developer entity registered: Imtiaz Real Estate Investment & Development L.L.C (DLD developer 1129)","verified","registry","https://dubairealestateiq.com/project/beach-walk-residences-4-by-imtiaz"],["Developer track record: 10 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/imtiaz"],["Construction progress 58% overall (Imtiaz page, undated) [DLD inspection on 13 Aug 2026 recorded 42.87%; the developer figure may be later but the page carries no date]","contradicted","registry","https://dubairealestateiq.com/project/beach-walk-residences-4-by-imtiaz"],["Completion June 2027 / Q2 2027","verified","registry","https://dubairealestateiq.com/project/beach-walk-residences-4-by-imtiaz"],["Construction started 21 Apr 2025 (Property Finder timeline)","verified","registry","https://dubairealestateiq.com/project/beach-walk-residences-4-by-imtiaz"],["Imtiaz delivered the first residential project on Dubai Islands (Beach Walk by Imtiaz, Mar 2026) [sponsored \"Reach by Gulf News\" item, not independent reporting]","unverified","none","https://gulfnews.com/business/property/imtiaz-hands-over-first-ever-residential-project-on-dubai-islands-with-beach-walk-by-imtiaz-1.500469389"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/beach-walk-residences-4-by-imtiaz-dubai-islands"],["No guaranteed returns advertised","unverified","none","https://imtiaz.ae/property/beach-walk-4-by-imtiaz"],["DLD project register: project 3707, status Active, completion date on the register 20 Apr 2027, 42.87% built at the DLD inspection of 13 Aug 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Real Estate Investment & Development L.L.C (DLD developer 1129) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/beach-walk-residences-4-by-imtiaz"]],"rvw":null}},"becici-sea-view-building-value-one":{"set":{"rvw":null}},"beekman-401-east-51st-cbsk":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not checked","official register for New York not looked up on the review date","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q3) comes from the sources listed on the page.","https://www.beekman401.com/"],"co":null,"sq":{"handover":"developer","permit":"press"},"miss":["official register not looked up: official register for New York not looked up on the review date"]}}},"bel-air-gardens-yeroskipou":{"set":{"rvw":null}},"bela-beach-front-homes-gran-pacifica-eci":{"set":{"rvw":null}},"belalba-peru":{"set":{"rvw":null}},"belize-marriott-residences-eci-development":{"set":{"rvw":null}},"belle-plaisance":{"set":{"rvw":null}},"bellevue-al-mouj-ideal-buildings-ideal-building":{"set":{"rvw":null}},"belvedere-at-the-hill":{"set":{"rvw":null}},"bentley-residences-sunny-isles-dezer":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77375 \"18401 COLLINS AVENUE CODOMINIUM\", developer entity 18401 DEVELOPERS LLC","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Condo filed with Florida DBPR (PR77375) by 18401 Developers LLC","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Dezer delivered Porsche Design Tower (18555 Collins Ave, 132 units, recorded 2012)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/Condo_MD.csv"],["216 residences over 62 storeys","verified","independent","https://floridayimby.com/2026/08/vertical-construction-progresses-on-62-story-bentley-residences-in-sunny-isles-beach.html"],["Vertical construction at about 13 storeys (Aug 2026)","verified","independent","https://floridayimby.com/2026/08/vertical-construction-progresses-on-62-story-bentley-residences-in-sunny-isles-beach.html"],["Completion 2027 (Bentley Motors page)","contradicted","independent","https://floridayimby.com/2026/08/vertical-construction-progresses-on-62-story-bentley-residences-in-sunny-isles-beach.html"],["Completion 2028","unverified","none","https://floridayimby.com/2026/08/vertical-construction-progresses-on-62-story-bentley-residences-in-sunny-isles-beach.html"],["Remaining inventory from USD 5.8M","unverified","none","https://joshsteinrealtor.com/new-construction/bentley-residences/"],["Construction financing of USD 630M","unverified","none","https://joshsteinrealtor.com/new-construction/bentley-residences/"],["Deposits held in escrow","unverified","none","https://m.flsenate.gov/Statutes/718.202"]],"rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["not checked","date on record 2028 not re-checked on the review date",null],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":["handover status not resolved"]},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77375","code":"PR77375","checked":"2026-11-13"}}},"bermondsey-place":{"set":{"rvw":null}},"beyond-kanyon":{"set":{"cl":[["Trakheesi permit 1579183201","unverified","none","https://a1properties.ae/project-details/kanyon-by-beyond-dubai-maritime-city"],["Project registered with DLD (project 4050)","verified","registry","https://dubairealestateiq.com/project/kanyon-by-beyond"],["Payments go to an escrow account at Emirates NBD","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/kanyon-by-beyond"],["Delivery Q2 2029","contradicted","registry","https://www.mitchellscommercialrealty.com/off-plan/kanyon-by-beyond"],["411 residences","verified","registry","https://dubairealestateiq.com/project/kanyon-by-beyond"],["Construction under way","contradicted","registry","https://dubairealestateiq.com/project/kanyon-by-beyond"],["Construction complete (madena.ae listing text)","contradicted","registry","https://www.madena.ae/projects/kanyon-by-beyond"],["Starting price AED 2.4 million","verified","registry","https://www.mitchellscommercialrealty.com/dubai-area-guides/dubai-maritime-city-investment-guide"],["Beyond is part of OMNIYAT Group (developer release; The National item is paid partner content)","unverified","none","https://www.thenationalnews.com/business/partner-content/2024/09/17/omniyat-group-launches-beyond-a-company-focusing-on-wider-luxury-real-estate-market/"],["Group parent publishes audited accounts and listed sukuk","unverified","none","https://www.omniyat.com/news/omniyat-group-delivers-exceptional-financial-performance-in-2025"],["Registered developer entity is Cobia Real Estate Development L.L.C","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/kanyon-by-beyond"],["Freehold title","unverified","none","https://www.directdxb.com/projects/beyond-kanyon"],["DLD project register: project 4050, status Active, completion date on the register 30 Sep 2028, 0% built at the DLD inspection of 22 Apr 2026, escrow account bank Emirates Nbd Bank, registered developer Cobia Real Estate Development L.L.C (DLD developer 2316) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/kanyon-by-beyond"]],"rvw":null}},"binghatti-aquarise-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-aquarise"],["DLD project register: project 3585, status Active, completion date on the register 31 Oct 2026, 21.04% built at the DLD inspection of 14 May 2026, escrow account bank First Abu Dhabi Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-aquarise"],["The developer page read on 13 Nov 2026 prints: \"When is the completion date for Binghatti Aquarise? The expected completion date is in Quarter 1, 2027\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-aquarise"]],"ev":{"permit":"Registered as DLD project 3585, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 14 May 2026: 21.04% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2026-Q4"},"pn":"DLD project registration 3585","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-aquarise"],"ho":["passed-late","DLD register completion 31 Oct 2026; 21.04% built at the inspection of 14 May 2026; developer page: \"When is the completion date for Binghatti Aquarise? The expected completion date is in Quarter 1, 2027\"","https://dubairealestateiq.com/project/binghatti-aquarise"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-aquarise"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.binghatti.com/en/projects/binghatti-aquarise","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-aquarise","https://dubairealestateiq.com/project/binghatti-aquarise"],"st":"under construction"}},"binghatti-circle-jvc":{"set":{"cl":[["Registered on the DLD project register as project no. 3819 on 22 Jul 2025","verified","registry","https://dubairealestateiq.com/project/binghatti-circle"],["Escrow account held at Dubai Islamic Bank","verified","registry","https://dubairealestateiq.com/project/binghatti-circle"],["Construction stage: 10.33% built at DLD inspection on 30 Apr 2026","verified","registry","https://dubairealestateiq.com/project/binghatti-circle"],["Developer entity Binghatti Developers Fze registered with DLD (developer no. 1051)","verified","registry","https://dubairealestateiq.com/project/binghatti-circle"],["Project has 822 units on the register","verified","registry","https://dubairealestateiq.com/project/binghatti-circle"],["Developer group track record on DLD: 43 finished projects (79 total, 36 active)","verified","registry","https://dubairealestateiq.com/developer/binghatti"],["Completion Q2 2027","verified","registry","https://dubairealestateiq.com/project/binghatti-circle"],["About 776 residences (developer) vs 822 units on register","contradicted","registry","https://dubairealestateiq.com/project/binghatti-circle"],["Price from AED 674,999","unverified","none","https://www.binghatti.com/en/projects/binghatti-circle"],["Tallest residential tower in JVC","unverified","none","https://www.binghatti.com/en/projects/binghatti-circle"],["DLD project register: project 3819, status Active, completion date on the register 31 May 2027, 10.33% built at the DLD inspection of 30 Apr 2026, escrow account bank Dubai Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-circle"],["The developer page read on 13 Nov 2026 prints: \"When is the completion date for Binghatti Circle? The completion date for Binghatti Circle is Q2, 2027\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-circle"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-circle"],"ho":["future","DLD register completion 31 May 2027; 10.33% built at the inspection of 30 Apr 2026; developer page: \"When is the completion date for Binghatti Circle? The completion date for Binghatti Circle is Q2, 2027\"","https://dubairealestateiq.com/project/binghatti-circle"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-circle"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"binghatti-cullinan-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-cullinan"],["DLD project register: project 4247, status Active, completion date on the register 30 Jun 2027, 0% built at the DLD inspection of 25 Nov 2025, escrow account bank United Arab Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-cullinan"]],"ev":{"permit":"Registered as DLD project 4247, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank United Arab Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 25 Nov 2025: 0% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2027-Q2"},"pn":"DLD project registration 4247","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-cullinan"],"ho":["future","DLD register completion 30 Jun 2027; 0% built at the inspection of 25 Nov 2025","https://dubairealestateiq.com/project/binghatti-cullinan"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-cullinan"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://famproperties.com/al-jaddaf-dubai/binghatti-cullinan","https://www.binghatti.com/en/projects/binghatti-cullinan","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-cullinan","https://dubairealestateiq.com/project/binghatti-cullinan"]}},"binghatti-etherea-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-etherea"],["DLD project register: project 4303, status Active, completion date on the register 31 Dec 2027, 7.24% built at the DLD inspection of 15 Sep 2026, escrow account bank Mashreq Bank Psc, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-etherea"]],"ev":{"permit":"Registered as DLD project 4303, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Mashreq Bank Psc (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 15 Sep 2026: 7.24% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2027-Q4"},"pn":"DLD project registration 4303","rvw":null,"src":["https://www.binghatti.com/en/projects/binghatti-etherea","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-etherea","https://dubairealestateiq.com/project/binghatti-etherea"],"st":"under construction"}},"binghatti-flare-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-flare"],["DLD project register: project 4006, status Active, completion date on the register 14 Jul 2027, 20% built at the DLD inspection of 19 Jun 2026, escrow account bank Dubai Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-flare-01"],["The developer page read on 13 Nov 2026 prints: \"When is the completion date for Binghatti Flare? Binghatti Flare is expected to be completed by Q2 2027\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-flare"]],"ev":{"permit":"Registered as DLD project 4006, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 19 Jun 2026: 20% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2027-Q3"},"pn":"DLD project registration 4006","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-flare-01"],"ho":["future","DLD register completion 14 Jul 2027; 20% built at the inspection of 19 Jun 2026; developer page: \"When is the completion date for Binghatti Flare? Binghatti Flare is expected to be completed by Q2 2027\"","https://dubairealestateiq.com/project/binghatti-flare-01"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-flare-01"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.binghatti.com/en/projects/binghatti-flare","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-flare","https://dubairealestateiq.com/project/binghatti-flare-01"]}},"binghatti-hillcrest-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-hillcrest"],["DLD project register: project 4105, status Active, completion date on the register 31 Dec 2026, 60% built at the DLD inspection of 17 Sep 2026, escrow account bank Sharjah Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-hillcrest"]],"ev":{"permit":"Registered as DLD project 4105, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Sharjah Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 17 Sep 2026: 60% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2026-Q4"},"pn":"DLD project registration 4105","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-hillcrest"],"ho":["future","DLD register completion 31 Dec 2026; 60% built at the inspection of 17 Sep 2026","https://dubairealestateiq.com/project/binghatti-hillcrest"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-hillcrest"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://famproperties.com/arjan-dubai/binghatti-hillcrest","https://www.binghatti.com/en/projects/binghatti-hillcrest","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-hillcrest","https://dubairealestateiq.com/project/binghatti-hillcrest"]}},"binghatti-hillviews":{"set":{"cl":[["FAQ answer on the page: \"The project is scheduled for completion in Q4 2026.\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-hillviews"],["37-floor residential tower with 1,552 units: studios, 1 and 2-bedroom apartments","unverified","none","https://www.binghatti.com/en/projects/binghatti-hillviews"],["37 residential floors, 2 basement levels, 4 parking levels and a roof","unverified","none","https://www.binghatti.com/en/projects/binghatti-hillviews"],["DLD project register: project 3321, status Active, completion date on the register 1 Apr 2026, 32.6% built at the DLD inspection of 25 Jun 2026, escrow account bank Abu Dhabi Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-hillviews"],["The developer page read on 13 Nov 2026 prints: \"When is the completion date for Binghatti Hillviews? The project is scheduled for completion in Q4 2026\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-hillviews"]],"ev":{"permit":"Registered as DLD project 3321, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Abu Dhabi Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 25 Jun 2026: 32.6% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2026-Q4","unit_types":["studio","1-bedroom apartment","2-bedroom apartment"]},"pn":"DLD project registration 3321","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-hillviews"],"ho":["passed-late","DLD register completion 1 Apr 2026; 32.6% built at the inspection of 25 Jun 2026; developer page: \"When is the completion date for Binghatti Hillviews? The project is scheduled for completion in Q4 2026\"","https://dubairealestateiq.com/project/binghatti-hillviews"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-hillviews"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.binghatti.com/en/projects/binghatti-hillviews","https://dubairealestateiq.com/project/binghatti-hillviews"]}},"binghatti-luxuria-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-luxuria"],["DLD project register: project 4299, status Active, completion date on the register 30 Jul 2027, 7.04% built at the DLD inspection of 17 Sep 2026, escrow account bank Mashreq Bank Psc, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-luxuria"],["The developer page read on 13 Nov 2026 prints: \"What's the expected completion date for Binghatti Luxuria? Binghatti Luxuria is expected to be completed by the 3rd Quarter of 2027\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-luxuria"]],"ev":{"permit":"Registered as DLD project 4299, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Mashreq Bank Psc (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 17 Sep 2026: 7.04% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2027-Q3"},"pn":"DLD project registration 4299","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-luxuria"],"ho":["future","DLD register completion 30 Jul 2027; 7.04% built at the inspection of 17 Sep 2026; developer page: \"What's the expected completion date for Binghatti Luxuria? Binghatti Luxuria is expected to be completed by the 3rd Quarter of 2027\"","https://dubairealestateiq.com/project/binghatti-luxuria"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-luxuria"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://famproperties.com/jumeirah-village-triangle-dubai/binghatti-luxuria","https://www.binghatti.com/en/projects/binghatti-luxuria","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-luxuria","https://dubairealestateiq.com/project/binghatti-luxuria"],"st":"under construction"}},"binghatti-skyblade":{"set":{"cl":[["FAQ answer on the page: \"Binghatti Skyblade's completion date is Q4 2027.\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyblade"],["Studios, 1, 2 and 3-bedroom apartments; 619 residential units and 2 retail units","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyblade"],["4 basement levels, ground floor, 3 podium levels, 55 residential floors, 5 mechanical floors and a roof","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyblade"],["The page says the project lies in Downtown Dubai with views of Burj Khalifa","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyblade"],["DLD project register: project 3725, status Active, completion date on the register 30 Nov 2027, 17.06% built at the DLD inspection of 21 Apr 2026, escrow account bank Dubai Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-skyblade"],["The developer page read on 13 Nov 2026 prints: \"When is the completion date for Binghatti Skyblade? Binghatti Skyblade's completion date is Q4 2027\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyblade"]],"ev":{"permit":"Registered as DLD project 3725, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 21 Apr 2026: 17.06% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2027-Q4","unit_types":["studio","1-bedroom apartment","2-bedroom apartment","3-bedroom apartment"]},"pn":"DLD project registration 3725","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-skyblade"],"ho":["future","DLD register completion 30 Nov 2027; 17.06% built at the inspection of 21 Apr 2026; developer page: \"When is the completion date for Binghatti Skyblade? Binghatti Skyblade's completion date is Q4 2027\"","https://dubairealestateiq.com/project/binghatti-skyblade"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-skyblade"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.binghatti.com/en/projects/binghatti-skyblade","https://dubairealestateiq.com/project/binghatti-skyblade"],"st":"under construction"}},"binghatti-skyflame-1":{"set":{"cl":[["Project registered with DLD (project 4393, Active)","verified","registry","https://dubairealestateiq.com/project/binghatti-skyflame-1"],["Escrow account (Emirates NBD)","verified","registry","https://dubairealestateiq.com/project/binghatti-skyflame-1"],["Construction at 0% (DLD inspection 17 Feb 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-skyflame-1"],["Developer entity registered: Binghatti Developers Fze (DLD developer 1051)","verified","registry","https://dubairealestateiq.com/project/binghatti-skyflame-1"],["Developer track record: 43 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/binghatti"],["Completion by 31 Dec 2027 [registered date matches, but the building had not started at the last inspection]","verified","registry","https://dubairealestateiq.com/project/binghatti-skyflame-1"],["Binghatti Holding liquidity weakened; Ba3 ratings on review for downgrade","verified","independent","https://www.tradingview.com/news/reuters.com,2026-08-11:newsml_Zawb7bptR:0-moody-s-puts-dubai-developer-binghatti-ratings-on-review-for-downgrade/"],["Registered sales median AED 570k, AED 1,378 per sq ft (760 sales)","verified","registry","https://dubairealestateiq.com/project/binghatti-skyflame-1"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/binghatti-skyflame-1-majan-dubai"],["No guaranteed returns advertised","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyflame"],["DLD project register: project 4393, status Active, completion date on the register 31 Dec 2027, 0% built at the DLD inspection of 17 Feb 2026, escrow account bank Emirates Nbd Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-skyflame-1"],["The developer page read on 13 Nov 2026 prints: \"When is Binghatti Skyflame expected to be completed? The project is scheduled to be completed by 31st December 2027\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyflame"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-skyflame-1"],"ho":["future","DLD register completion 31 Dec 2027; 0% built at the inspection of 17 Feb 2026; developer page: \"When is Binghatti Skyflame expected to be completed? The project is scheduled to be completed by 31st December 2027\"","https://dubairealestateiq.com/project/binghatti-skyflame-1"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-skyflame-1"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"url":"https://www.binghatti.com/en/projects/binghatti-skyflame"}},"binghatti-skyrise":{"set":{"cl":[["FAQ answer on the page: \"The delivery date for Binghatti Skyrise is set for Q4 2026.\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyrise"],["3 towers, each with 4 basement levels, a ground floor, 5 podium levels, 48 residential floors, 2 mechanical rooms and a roof","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyrise"],["Payment plan on the page starts with a 20% deposit on booking and ends with 30% upon completion","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyrise"],["Location published: \"in the heart of Business Bay\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyrise"],["DLD project register: project 3349, status Active, completion date on the register 31 Dec 2026, 22.4% built at the DLD inspection of 23 Apr 2026, escrow account bank Dubai Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-skyrise"],["The developer page read on 13 Nov 2026 prints: \"The delivery date for Binghatti Skyrise is set for Q4 2026\"","unverified","none","https://www.binghatti.com/en/projects/binghatti-skyrise"]],"ev":{"permit":"Registered as DLD project 3349, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 23 Apr 2026: 22.4% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2026-Q4","unit_types":["apartment"],"deposit_pct":20},"pn":"DLD project registration 3349","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-skyrise"],"ho":["future","DLD register completion 31 Dec 2026; 22.4% built at the inspection of 23 Apr 2026; developer page: \"The delivery date for Binghatti Skyrise is set for Q4 2026\"","https://dubairealestateiq.com/project/binghatti-skyrise"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-skyrise"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.binghatti.com/en/projects/binghatti-skyrise","https://dubairealestateiq.com/project/binghatti-skyrise"]}},"binghatti-skyterraces-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/sky-terraces"],["DLD project register: project 4327, status Active, completion date on the register 31 Oct 2027, 0% built at the DLD inspection of 7 Jan 2026, escrow account bank Dubai Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-skyterraces"]],"ev":{"permit":"Registered as DLD project 4327, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 7 Jan 2026: 0% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2027-Q4"},"pn":"DLD project registration 4327","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-skyterraces"],"ho":["future","DLD register completion 31 Oct 2027; 0% built at the inspection of 7 Jan 2026","https://dubairealestateiq.com/project/binghatti-skyterraces"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-skyterraces"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.binghatti.com/en/projects/binghatti-skyterraces","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/sky-terraces","https://dubairealestateiq.com/project/binghatti-skyterraces"]}},"binghatti-spectre":{"set":{"rvw":null}},"binghatti-starfall-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-starfall"],["DLD project register: project 4483, status Active, completion date on the register 30 Oct 2027, 0% built at the DLD inspection of 20 May 2026, escrow account bank United Arab Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-starfall"]],"ev":{"permit":"Registered as DLD project 4483, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank United Arab Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 20 May 2026: 0% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2027-Q4"},"pn":"DLD project registration 4483","rvw":null,"src":["https://famproperties.com/al-jaddaf-dubai/binghatti-starfall","https://www.binghatti.com/en/projects/binghatti-starfall","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-starfall","https://dubairealestateiq.com/project/binghatti-starfall"]}},"binghatti-titania":{"set":{"cl":[["38-floor building: 3 basement levels, ground level, 4 podium levels, 32 residential floors, 1 mechanical floor and a roof","unverified","none","https://www.binghatti.com/en/projects/binghatti-titania"],["Location published: Majan, with access to Al Barari and the E311 highway","unverified","none","https://www.binghatti.com/en/projects/binghatti-titania"],["No completion date is printed on the page","unverified","none","https://www.binghatti.com/en/projects/binghatti-titania"],["DLD project register: project 4104, status Active, completion date on the register 28 Feb 2027, 0% built at the DLD inspection of 23 Sep 2025, escrow account bank Dubai Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-titania"]],"ev":{"permit":"Registered as DLD project 4104, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 23 Sep 2025: 0% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2027-Q1","unit_types":["apartment"]},"pn":"DLD project registration 4104","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-titania"],"ho":["future","DLD register completion 28 Feb 2027; 0% built at the inspection of 23 Sep 2025","https://dubairealestateiq.com/project/binghatti-titania"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-titania"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.binghatti.com/en/projects/binghatti-titania","https://dubairealestateiq.com/project/binghatti-titania"]}},"binghatti-vintage":{"set":{"cl":[["Project registered with DLD (project 4102, Active)","verified","registry","https://dubairealestateiq.com/project/binghatti-vintage"],["Escrow account (Dubai Islamic Bank)","verified","registry","https://dubairealestateiq.com/project/binghatti-vintage"],["Construction at 0% (DLD inspection 23 Sep 2025)","verified","registry","https://dubairealestateiq.com/project/binghatti-vintage"],["Developer entity registered: Binghatti Developers Fze (DLD developer 1051)","verified","registry","https://dubairealestateiq.com/project/binghatti-vintage"],["Developer track record: 43 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/binghatti"],["Handover Q1 2027 [registered date matches, but no inspection after 0% in Sep 2025 is on the register, so delivery in 5 months cannot be checked]","verified","registry","https://dubairealestateiq.com/project/binghatti-vintage"],["Group holds AED 10.6bn in escrow accounts","unverified","none","https://www.khaleejtimes.com/business/binghatti-dismisses-debt-fears-points-to-dh106-billion-in-escrow-accounts"],["Binghatti Holding liquidity weakened; Ba3 ratings on review for downgrade","verified","independent","https://www.tradingview.com/news/reuters.com,2026-08-11:newsml_Zawb7bptR:0-moody-s-puts-dubai-developer-binghatti-ratings-on-review-for-downgrade/"],["Registered sales median AED 710k, AED 1,861 per sq ft (1,509 sales)","verified","registry","https://dubairealestateiq.com/project/binghatti-vintage"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/binghatti-vintage-majan-dubai"],["No guaranteed returns advertised","unverified","none","https://www.binghatti.com/en/projects/binghatti-vintage"],["DLD project register: project 4102, status Active, completion date on the register 31 Mar 2027, 0% built at the DLD inspection of 23 Sep 2025, escrow account bank Dubai Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-vintage"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/binghatti-vintage"],"ho":["future","DLD register completion 31 Mar 2027; 0% built at the inspection of 23 Sep 2025","https://dubairealestateiq.com/project/binghatti-vintage"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/binghatti-vintage"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"url":"https://www.binghatti.com/en/projects/binghatti-vintage"}},"binghatti-wraith-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-wraith"],["DLD project register: project 4482, status Active, completion date on the register 30 Dec 2027, 0% built at the DLD inspection of 20 May 2026, escrow account bank United Arab Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/binghatti-wraith"]],"ev":{"permit":"Registered as DLD project 4482, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank United Arab Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 20 May 2026: 0% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2027-Q4"},"pn":"DLD project registration 4482","rvw":null,"src":["https://famproperties.com/al-jaddaf-dubai/binghatti-wraith","https://www.binghatti.com/en/projects/binghatti-wraith","https://www.propertyfinder.ae/en/new-projects/binghatti-developers/binghatti-wraith","https://dubairealestateiq.com/project/binghatti-wraith"]}},"bingin-elements-urban-escape":{"set":{"rvw":null}},"bingin-ocean-villas":{"set":{"rvw":null}},"biom":{"set":{"rvw":null}},"birchpark-garden-homes-eco-forest":{"set":{"rvw":null}},"black-sands-oasis-bali":{"set":{"rvw":null}},"blacksand-villas-padang-linjong-canggu":{"set":{"rvw":null}},"bliss-homes-casares-neinor":{"set":{"rvw":null}},"bliss-uptown":{"set":{"rvw":null}},"blue-vista-flow-properties":{"set":{"rvw":null}},"bluewaters-bay-meraas":{"set":{"cl":[["Project registered with DLD (project 2530)","verified","registry","https://dubairealestateiq.com/project/bluewaters-bay"],["Escrow account (Abu Dhabi Commercial Bank)","verified","registry","https://dubairealestateiq.com/project/bluewaters-bay"],["Delivery March 2027 / Q1 2027","contradicted","registry","https://dubairealestateiq.com/project/bluewaters-bay"],["Completion 30 Sep 2027 (agent listing)","unverified","none","https://www.profoundproperties.com/project/bluewaters-bay"],["Construction under way (36.97% Aug 2026)","verified","registry","https://dubairealestateiq.com/project/bluewaters-bay"],["1BR from AED 2.85m (registered 1BR median AED 3.0m, AED 3,734 per sq ft)","verified","registry","https://dubairealestateiq.com/project/bluewaters-bay"],["Developer has delivered many projects, including Bluewaters Residences","verified","registry","https://dubairealestateiq.com/project/bluewaters-residences"],["DHRE has 36 finished and 6 cancelled projects on the register","verified","registry","https://dubairealestateiq.com/developer/dhre"],["Unit count 679 (agent says 672)","verified","registry","https://dubairealestateiq.com/project/bluewaters-bay"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/meraas-holding/bluewaters-bay"],["DLD project register: project 2530, status Active, completion date on the register 1 Mar 2027, 36.97% built at the DLD inspection of 25 Aug 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Dhre 2 Bts L.L.C (DLD developer 1510) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/bluewaters-bay"]],"rvw":null}},"boavista-tower-porto-mesmo-valor":{"set":{"rvw":null}},"bocage-65-lisbon":{"set":{"rvw":null}},"bocoa-jimbaran":{"set":{"rvw":null}},"bodhi-tulum":{"set":{"rvw":null}},"boka-place-porto-montenegro":{"set":{"rvw":null}},"boka-verde-dpm-global":{"set":{"rvw":null}},"bosco-di-santa-maria":{"set":{"rvw":null}},"botanica-luxury-hua-hin":{"set":{"rvw":null}},"botanica-luxury-krabi":{"set":{"rvw":null}},"botanik-garden-marrakech-aedge-partners":{"set":{"rvw":null}},"boulevard-bristol-street-birmingham-investin":{"set":{"rvw":null}},"boulevard-villas":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Dominican Republic","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)"]}}},"brabus-island-baku-baku":{"set":{"rvw":null}},"branniganz-suites-bukit-bintang-exsim":{"set":{"rvw":null}},"branz-city-funabashi-biare":{"set":{"rvw":null}},"branz-gokokuji-fujimizaka":{"set":{"cl":[["Developer property outline prints building confirmation number JCIA確認24第00787号 (28 Jan 2025, amended 30 May 2025 and 26 Nov 2025), seller Tokyu Land Corporation (MLIT licence (17) No. 45)","verified","developer","https://sumai.tokyu-land.co.jp/branz/gokokuji/outline/"],["Developer property outline: building completion mid-January 2027 (planned), handover possible mid-March 2027 (planned); 10 floors, 3LDK units of 70.02 to 74.31 m2","verified","developer","https://sumai.tokyu-land.co.jp/branz/gokokuji/outline/"],["Completion as printed in the property outline: mid January 2027 (2027年1月中旬予定); the project page gives handover in mid March 2027","unverified","none","https://sumai.tokyu-land.co.jp/branz/gokokuji/outline/"],["Location (lot number) as printed: 東京都文京区大塚二丁目110番3 (lot number)","unverified","none","https://sumai.tokyu-land.co.jp/branz/gokokuji/outline/"],["Total units as printed: 36 (including 5 for the project partner); seller: Tokyu Land Corporation","unverified","none","https://sumai.tokyu-land.co.jp/branz/gokokuji/outline/"]],"ev":{"permit":"Developer property outline prints building confirmation JCIA確認24第00787号 dated 28 Jan 2025 (opened 13 Nov 2026)"},"pn":"Building confirmation JCIA確認24第00787号 (28 Jan 2025)","rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Japan","https://kolaboro.com/registers/"],"ho":["future","date on record January 2027; checked against: Developer property outline: building completion mid-January 2027 (planned), handover possible mid-March 2027 (planned); 10 floors, 3LDK units of 70.02 to 74.31 m2","https://sumai.tokyu-land.co.jp/branz/gokokuji/outline/"],"co":null,"sq":{"handover":"developer","permit":"developer","developer":"developer"},"miss":null}}},"branz-hoshigaoka-terrace":{"set":{"rvw":null}},"branz-omiya-nisshin-biare":{"set":{"rvw":null}},"branz-tower-nishinomiya":{"set":{"rvw":null}},"branz-tower-osaki":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Japan","https://kolaboro.com/registers/"],"ho":["not checked","date on record August 2027 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","developer":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"branz-tower-yokohama-kitanaka":{"set":{"rvw":null}},"breez-by-danube-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/danube-properties/breez-by-danube"],["DLD project register: project 4081, status Active, completion date on the register 30 Jun 2029, 0.14% built at the DLD inspection of 14 Jul 2026, escrow account bank First Abu Dhabi Bank, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/breez-by-danube"],["The developer page read on 13 Nov 2026 prints: \"Completion 2029\"","unverified","none","https://danubeproperties.com/portfolio/breez/"]],"ev":{"permit":"Registered as DLD project 4081, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 14 Jul 2026: 0.14% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Danube Properties Development L.L.C (DLD developer 1009)","handover_promised":"2029-Q2"},"pn":"DLD project registration 4081","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/breez-by-danube"],"ho":["future","DLD register completion 30 Jun 2029; 0.14% built at the inspection of 14 Jul 2026; developer page: \"Completion 2029\"","https://dubairealestateiq.com/project/breez-by-danube"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/breez-by-danube"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://danubeproperties.com/portfolio/breez/","https://gulfnews.com/business/corporate-news/breez-by-danube-dubai-maritime-citys-tallest-tower-offers-panoramic-sea-views-and-luxury-living-1.500275632","https://meconstructionnews.com/64630/danube-launches-breez-by-danube-in-dubai-maritime-city","https://www.propertyfinder.ae/en/new-projects/danube-properties/breez-by-danube","https://dubairealestateiq.com/project/breez-by-danube"]}},"breig-edem-i-villas":{"set":{"rvw":null}},"breig-edem-ii-santorini":{"set":{"rvw":null}},"brentwood-block-phase-1-strata-tower":{"set":{"rvw":null}},"brillia-kyoto-kitayama-the-residence-tokyo-tatemono":{"set":{"rvw":null}},"brisa-patong-by-sansiri-phuket":{"set":{"rvw":null}},"brooklyn-life-fikirtepe":{"set":{"rvw":null}},"burj-binghatti-jacob-co-residences-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://en.wikipedia.org/wiki/Burj_Binghatti_Jacob_%26_Co_Residences"],["DLD project register: project 2480, status Active, completion date on the register 30 Jun 2026, 52.05% built at the DLD inspection of 31 Aug 2026, escrow account bank Sharjah Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/burj-binghatti-jacob-and-co-residences"]],"ev":{"permit":"Registered as DLD project 2480, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Sharjah Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 31 Aug 2026: 52.05% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2026-Q2"},"pn":"DLD project registration 2480","rvw":null,"src":["https://constructiondigital.com/construction-projects/worlds-tallest-residential-hypertower-to-be-built-in-dubai","https://en.wikipedia.org/wiki/Burj_Binghatti_Jacob_%26_Co_Residences","https://www.binghatti.com/en/branded-projects/burj-binghatti-jacob-co-residences","https://www.meed.com/dubai-developer-plans-worlds-tallest-residential-building","https://dubairealestateiq.com/project/burj-binghatti-jacob-and-co-residences"]}},"burj-zanzibar":{"set":{"rvw":null}},"bustani-view":{"set":{"cl":[["Completion printed on the page: \"from 2029\"","unverified","none","https://fumbatown.agency/en/projects/bustani-view"],["Studio to 3-bedroom apartments, furnished; price from USD 59,900","unverified","none","https://fumbatown.agency/en/projects/bustani-view"],["1-bedroom prices per floor published: 1st floor from USD 89,000, 2nd floor USD 107,900, 3rd floor USD 117,900","unverified","none","https://fumbatown.agency/en/projects/bustani-view"],["The page is on the Fumba Town Agency site, which presents itself as the CPS certified agency","unverified","none","https://fumbatown.agency/en/projects/bustani-view"],["The developer page read on 13 Nov 2026 prints: \"from 2029 Completion\"","unverified","none","https://fumbatown.agency/en/projects/bustani-view"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Tanzania","https://kolaboro.com/registers/"],"ho":["future","developer page: \"from 2029 Completion\"","https://fumbatown.agency/en/projects/bustani-view"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"bustani-villas":{"set":{"rvw":null}},"bvlgari-mansions-bodrum-ahen":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Turkey","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027) comes from the sources listed on the page.","https://www.bulgarimansionsbodrum.com/mansions"],"co":null,"sq":{"permit":"press","price":"press"},"miss":null}}},"bw-topaz-belgrade-waterfront-eagle-hills":{"set":{"rvw":null}},"c-beba-cape-verde":{"set":{"rvw":null}},"cabo-real-surf-club-surf-casitas-boardwalk-homes-villas-meriwether-com":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2026) comes from the sources listed on the page.","https://caborealsurfclub.com/"],"co":null,"sq":{"permit":"registry","price":"press","developer":"registry"},"miss":null}}},"cadence-french-alps":{"set":{"rvw":null}},"caesar-blue-quatro-villas-iskele":{"set":{"rvw":null}},"caesar-cliff-afik-group":{"set":{"rvw":null}},"caesar-egypt":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Egypt","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.sodic.com/our-developments/caesar"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"campiglia-pilay-ix-ana-monterroso":{"set":{"rvw":null}},"campus-country-mayab":{"set":{"rvw":null}},"canal-bay-qetaifan-taameer":{"set":{"rvw":null}},"canal-crown-de-grisogono":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q4, 2027\"","unverified","none","https://www.damacproperties.com/en/projects/canal-crown/"],["Studio to 4-bedroom apartments with Dubai Canal views; the page title says Business Bay","unverified","none","https://www.damacproperties.com/en/projects/canal-crown/"],["DLD project register: project 2625, status Active, completion date on the register 28 Feb 2027, 42.15% built at the DLD inspection of 15 Jul 2026, escrow account bank Abu Dhabi Islamic Bank, registered developer Galaxy Sky Real Estate Development L.L.C (DLD developer 1556) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/canal-crown"]],"ev":{"permit":"Registered as DLD project 2625, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Abu Dhabi Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 15 Jul 2026: 42.15% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Galaxy Sky Real Estate Development L.L.C (DLD developer 1556)","handover_promised":"2027-Q4","unit_types":["studio","apartment"]},"pn":"DLD project registration 2625","rvw":null,"src":["https://www.damacproperties.com/en/projects/canal-crown/","https://dubairealestateiq.com/project/canal-crown"]}},"canal-heights-2-de-grisogono":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q3, 2027\"","unverified","none","https://www.damacproperties.com/en/projects/canal-heights-2-de-grisogono/"],["Studios, 1 and 2-bedroom apartments and 3 and 4-bedroom duplexes in Business Bay, branded by de GRISOGONO","unverified","none","https://www.damacproperties.com/en/projects/canal-heights-2-de-grisogono/"],["DLD project register: project 2615, status Active, completion date on the register 31 Mar 2027, 36.41% built at the DLD inspection of 14 Aug 2026, escrow account bank Emirates Nbd Bank, registered developer Resta Real Estate Development L.L.C (DLD developer 1555) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/canal-heights-2"]],"ev":{"permit":"Registered as DLD project 2615, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 14 Aug 2026: 36.41% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Resta Real Estate Development L.L.C (DLD developer 1555)","handover_promised":"2027-Q3","unit_types":["studio","1-bedroom apartment","2-bedroom apartment","3-bedroom duplex","4-bedroom duplex"]},"pn":"DLD project registration 2615","rvw":null,"src":["https://www.damacproperties.com/en/projects/canal-heights-2-de-grisogono/","https://dubairealestateiq.com/project/canal-heights-2"]}},"canal-heights-de-grisogono":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q2, 2027\"","unverified","none","https://www.damacproperties.com/en/projects/canal-heights/"],["Waterfront tower on the Dubai Canal branded by de GRISOGONO; studios, 1 and 2-bedroom apartments","unverified","none","https://www.damacproperties.com/en/projects/canal-heights/"],["DLD project register: project 2602, status Active, completion date on the register 31 Dec 2026, 36.3% built at the DLD inspection of 17 Aug 2026, escrow account bank Emirates Nbd Bank, registered developer Vesta Real Estate Development L.L.C (DLD developer 1552) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/canal-heights"]],"ev":{"permit":"Registered as DLD project 2602, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 17 Aug 2026: 36.3% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Vesta Real Estate Development L.L.C (DLD developer 1552)","handover_promised":"2027-Q2","unit_types":["studio","1-bedroom apartment","2-bedroom apartment"]},"pn":"DLD project registration 2602","rvw":null,"src":["https://www.damacproperties.com/en/projects/canal-heights/","https://dubairealestateiq.com/project/canal-heights"]}},"canterbury-crest-resort-apartments-home-lands":{"set":{"rvw":null}},"canvaz-palette-cherngtalay-phuket":{"set":{"rvw":null}},"cap-cana-four-tower-boutique-community":{"set":{"rvw":null}},"cape-hayat-ras-al-khaimah":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/rak-properties/cape-hayat"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Cape Hayat\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"Cape Hayat\", In progress), read 13 Nov 2026"},"rvw":null,"src":["https://m.marketscreener.com/quote/stock/RAK-PROPERTIES-9059647/news/RAK-Properties-PJSC-Launches-Cape-Hayat-in-Mina-Al-Arab-44884753/","https://www.propertyfinder.ae/en/new-projects/rak-properties/cape-hayat","https://www.rakproperties.ae/our-properties/cape-hayat/","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"capital-square-da-nang-mega-assets-sih":{"set":{"rvw":null}},"carena-el-medano-tenerife":{"set":{"rvw":null}},"caribbean-town-palmaruba-group":{"set":{"rvw":null}},"casa-bella-residences-by-b-b-italia-miami":{"set":{"rvw":null}},"casa-blake-costa-palmas-irongate":{"set":{"rvw":null}},"casa-del-mare-esentepe-northernland":{"set":{"rvw":null}},"casa-mitos-via-montejo-inmobilia":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q2) comes from the sources listed on the page.","https://torremitos.com/"],"co":null,"sq":{"handover":"press","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"casa-una-residence-koh-samui":{"set":{"rvw":null}},"cascade-bangtao-beach":{"set":{"rvw":null}},"cascades-three-white-city-living-st-james":{"set":{"rvw":null}},"caspian-heights-lagos":{"set":{"rvw":null}},"castile-newstead":{"set":{"rvw":null}},"cavarosa-signature-residences-thevelopers":{"set":{"rvw":null}},"celere-blossom-hills-via-celere":{"set":{"rvw":null}},"celere-san-vicente-iii":{"set":{"rvw":null}},"celere-sunrise":{"set":{"rvw":null}},"celesta-gold":{"set":{"rvw":null}},"cello-residences-taraf":{"set":{"cl":[["Registered on the DLD project register as project no. 2843 on 24 Jan 2024","verified","registry","https://dubairealestateiq.com/project/cello-residences"],["Escrow account held at Emirates NBD","verified","registry","https://dubairealestateiq.com/project/cello-residences"],["Construction stage: 38.98% built at DLD inspection on 4 Sep 2026","verified","registry","https://dubairealestateiq.com/project/cello-residences"],["Developer entity Taraf Development L.L.C registered with DLD (developer no. 1549)","verified","registry","https://dubairealestateiq.com/project/cello-residences"],["Project has 392 units on the register","verified","registry","https://dubairealestateiq.com/project/cello-residences"],["Developer group track record on DLD: 0 finished projects (5 total, 5 active)","unverified","none","https://dubairealestateiq.com/developer/taraf"],["Delivery March 2027 (Property Finder)","unverified","none","https://www.propertyfinder.ae/en/new-projects/taraf-holding/cello"],["Registered sales median AED 1.1M for 1BR (15 sales, Oct 2025 to Sep 2026)","verified","registry","https://dubairealestateiq.com/project/cello-residences"],["Launch price from AED 1.1M","verified","registry","https://dubairealestateiq.com/project/cello-residences"],["Freehold ownership for foreign buyers in JVC","unverified","none","https://www.propertyfinder.ae/en/new-projects/taraf-holding/cello"],["Listing verified by Dubai Land Department (permit card on developer page)","unverified","none","https://www.tarafholding.com/en/project/cello"],["DLD project register: project 2843, status Active, no completion date on the register, 38.98% built at the DLD inspection of 4 Sep 2026, escrow account bank Emirates Nbd Bank, registered developer Taraf Development L.L.C (DLD developer 1549) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/cello-residences"]],"rvw":null}},"cello-tower-symphony-park-red-ridge":{"set":{"rvw":null}},"central-park-boulevard-port-city-home-lands":{"set":{"rvw":null}},"central-tower-fg-balneario-camboriu":{"set":{"rvw":null}},"centro-limassol-cybarco":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Cyprus","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date in its text; the March 2028 date on record is from an earlier read of the same site.","https://www.cybarco.com/project/centro-limassol/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"press"},"miss":null}}},"centropolitan-by-cordia-bucharest":{"set":{"rvw":null}},"chalet-caribou-les-saisies-mgm":{"set":{"rvw":null}},"chapter-charoenkrung-riverside-pruksa":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Thailand ONEP EIA register (report 256802-40, approval กท1102/60)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["not checked","date on record 2027-Q1 not re-checked on the review date",null],"co":null,"sq":{"handover":"registry","permit":"registry","price":"press","developer":"registry"},"miss":["handover status not resolved"]}}},"cheichei-living":{"set":{"rvw":null}},"chelsea-residences-by-damac-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/damac-properties/chelsea-residences-2-by-damac"],["DLD project register: project 3719, status Active, completion date on the register 31 Dec 2029, 5.19% built at the DLD inspection of 7 Aug 2026, escrow account bank Dubai Islamic Bank, registered developer Damac Crest Development L.L.C (DLD developer 2117) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/chelsea-residences-by-damac"],["The developer page read on 13 Nov 2026 prints: \"Completion December 2029 (anticipated)\"","unverified","none","https://www.damacproperties.com/en/blog/chelsea-residences-dubai-maritime-city-2378/"]],"ev":{"permit":"Registered as DLD project 3719, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 7 Aug 2026: 5.19% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Damac Crest Development L.L.C (DLD developer 2117)","handover_promised":"2029-Q4"},"pn":"DLD project registration 3719","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/chelsea-residences-by-damac"],"ho":["future","DLD register completion 31 Dec 2029; 5.19% built at the inspection of 7 Aug 2026; developer page: \"Completion December 2029 (anticipated)\"","https://dubairealestateiq.com/project/chelsea-residences-by-damac"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/chelsea-residences-by-damac"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.damacproperties.com/en/blog/chelsea-residences-dubai-maritime-city-2378/","https://www.propertyfinder.ae/en/new-projects/damac-properties/chelsea-residences-2-by-damac","https://dubairealestateiq.com/project/chelsea-residences-by-damac"],"st":"under construction"}},"chukwani-shores-paddco":{"set":{"rvw":null}},"cielo-condos-toronto":{"set":{"rvw":null}},"cipriani-residences-miami":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77300 \"1420 S MIAMI AVE CONDO\", developer entity 1420 S MIAMI ACQUISITIONS CP LLC (matched by the street address in the project name)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Topped out 15 Jul 2026 at about 950 ft","verified","independent","https://www.thorntontomasetti.com/project/cipriani-residences-miami"],["USD 600m construction financing (Banco Inbursa 350m, Ascendant 250m), Feb 2024","verified","independent","https://groupgazette.org/post/cipriani-tops-out-brickell-397-homes-no-meeting-space"],["More than 80% sold (Jul 2026) / 85% (Sep 2026)","unverified","none","https://www.hauteresidence.com/news/inside-cipriani-residences-miami-brickell/"],["Occupancy summer 2027 vs 2028 (Oct 2025, Wikipedia) vs 2026 (2023 announcement)","contradicted","independent","https://en.wikipedia.org/wiki/Cipriani_Residences_Miami"],["Storey count 80 vs 85","contradicted","independent","https://www.thorntontomasetti.com/project/cipriani-residences-miami"],["Construction began October 2024","verified","independent","https://en.wikipedia.org/wiki/Cipriani_Residences_Miami"],["Prices from about USD 1.6m (~USD 1,400/sq ft)","unverified","none","https://www.hauteresidence.com/news/inside-cipriani-residences-miami-brickell/"],["Mast Capital delivered Remi on the River (2024)","verified","independent","https://yieldpro.com/2024/07/remi-on-the-river/"],["Mast Capital delivered AVARA Miami Beach, 178 units (2025)","verified","independent","https://yieldpro.com/2025/12/avara-miami-beach/"],["Building permit number published","unverified","none","https://www.hauteresidence.com/news/inside-cipriani-residences-miami-brickell/"]],"ev":{"permit":"Florida DBPR developer summary (official CSV, read 13 Nov 2026): PR77300 1420 S MIAMI AVE CONDO by 1420 S MIAMI ACQUISITIONS CP LLC","escrow":"Florida law requires condo deposit escrow, but no escrow agent or deposit terms are published","progress":"Independent press and engineer (Thornton Tomasetti) report topping out in July 2026; earlier milestones 44th floor Oct 2025, 872 ft Apr 2026","plans":"Unit types and sizes for penthouses only in sources opened; no floor plans seen","record":"Trade press reports Mast Capital deliveries: Remi on the River (2024), Avalon Merrick Park (2024), AVARA Miami Beach (2025); these are rental projects, not condos"},"pn":"Florida DBPR condominium filing PR77300","rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["not checked","date on record 2027-Q3 not re-checked on the review date",null],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"press","permit":"registry","price":"developer","developer":"registry"},"miss":["handover status not resolved"]},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77300","code":"PR77300","checked":"2026-11-13"},"src":["https://en.wikipedia.org/wiki/Cipriani_Residences_Miami","https://floridayimby.com/?p=25597","https://groupgazette.org/post/cipriani-tops-out-brickell-397-homes-no-meeting-space","https://own.miami/brickell/news/cipriani-residences-miami-tops-off-summer-2027","https://resident.com/press-releases/2026/04/30/cipriani-residences-miami-rises-to-become-the-tallest-residential-tower-south-of-manhattan","https://therealdeal.com/people/camilo-miguel-jr/","https://traded.co/blog/inside-miami-s-tallest-tower-cipriani-residences-hits-80-sold-from-buyers-in-30-countries/","https://www.hauteresidence.com/news/inside-cipriani-residences-miami-brickell/","https://www.indexbox.io/blog/cipriani-residences-miami-tops-off-as-tallest-residential-tower-in-city/","https://www.mastcapital.com/blog/mast-capital-delivers-avalon-merrick-park-in-coral-gables","https://www.mastcapital.com/portfolio","https://www.oftmw.com/projects/cipriani-residences-miami/","https://www.thorntontomasetti.com/project/cipriani-residences-miami","https://yieldpro.com/2024/07/remi-on-the-river/","https://yieldpro.com/2025/12/avara-miami-beach/","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"]}},"cipriani-residences-punta-del-este-cipriani":{"set":{"rvw":null}},"ciputra-beach-resort":{"set":{"rvw":null}},"circle-residences":{"set":{"rvw":null}},"citadel-manor":{"set":{"rvw":null}},"city-place-luxury-condos-punta-cana":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Dominican Republic","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2027-Q2 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"city-tower-akabane-sumitomo-realty":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Japan","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2029-Q4 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","permit":"press","price":"press"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"city-tower-tokyo-tamachi-sumitomo-realty":{"set":{"rvw":null}},"city-vallanza-accra":{"set":{"rvw":null}},"city-walk-love-lane-liverpool-habitia":{"set":{"rvw":null}},"citygate-de-phuket":{"set":{"rvw":null}},"cloud-infinity-premium-villas-shree-yagna":{"set":{"rvw":null}},"clouthaus-residences-klcc-ta-global":{"set":{"rvw":null}},"coco-hills":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q3) comes from the sources listed on the page.","https://cocodevelopmentgroup.com/coco-hills-resort-bali/"],"co":null,"sq":{"handover":"press","permit":"developer","price":"developer"},"miss":null}}},"cocobay-da-nang":{"set":{"rvw":null}},"colette-residences-brickell-meta":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77830 \"COLETTE BRICKELL CONDO, A CONDO\", developer entity META 1870 LLC","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Condo filed with Florida DBPR by META 1870 LLC","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["38 residences over five storeys","verified","independent","https://floridayimby.com/?p=39644"],["Assemblage completed for USD 21.5M total","verified","independent","https://floridayimby.com/?p=39644"],["Financing: USD 28M construction loan from Arixa Capital (agent)","contradicted","independent","https://floridayimby.com/?p=39644"],["USD 18.5M acquisition and development loan from BridgeCity Capital","verified","independent","https://floridayimby.com/?p=39644"],["Completion 2028","unverified","none","https://floridayimby.com/?p=39644"],["Building permit issued","unverified","none","https://floridayimby.com/?p=39644"],["Developer has delivered earlier projects","unverified","none","https://www.manhattanmiami.com/miami-pre-construction/colette-residences"],["Deposits held in escrow","unverified","none","https://m.flsenate.gov/Statutes/718.202"]],"rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["not checked","date on record 2028 not re-checked on the review date",null],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"press","permit":"registry","developer":"registry"},"miss":["handover status not resolved"]},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77830","code":"PR77830","checked":"2026-11-13"}}},"comfort-by-orbi-orbi-group":{"set":{"rvw":null}},"como-varsity-lakes-red-co":{"set":{"rvw":null}},"condominio-marea-jac-marea-residences-costa-rica":{"set":{"rvw":null}},"conrad-residences-oleada-los-cabos-parks-hospitality":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://conradloscabos.mx/"],"co":null,"sq":{"handover":"press","permit":"registry","developer":"registry"},"miss":null}}},"constelada-riviera-maya":{"set":{"rvw":null}},"constellation-provence":{"set":{"rvw":null}},"contour-new-jackson-renaker":{"set":{"rvw":null}},"copacabana-coral-reef-jomtien":{"set":{"rvw":null}},"cor-39-balearics":{"set":{"rvw":null}},"cora-merrick-park":{"set":{"rvw":null}},"cora-sur-los-cabos-grupo-habitat":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2026-Q4) comes from the sources listed on the page.","https://coraloscabos.com/"],"co":null,"sq":{"handover":"press","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"coral-residences":{"set":{"rvw":null}},"coral-residences-kandima-pulse":{"set":{"rvw":null}},"coralia-dominican-republic":{"set":{"rvw":null}},"core-villas":{"set":{"rvw":null}},"coronella-living-tm":{"set":{"rvw":null}},"costa-mare":{"set":{"cl":[["Completion date published as \"Q3 2028\"","unverified","none","https://costa-mare.ellingtonproperties.ae/"],["Studios, 1 to 4-bedroom apartments, 1 to 3-bedroom duplexes, 4-bedroom penthouses and 5 to 6-bedroom villas","unverified","none","https://costa-mare.ellingtonproperties.ae/"],["Payment plan as published: 20% at booking plus AED 3,000 registration fee, instalments during construction, 30% on completion","unverified","none","https://costa-mare.ellingtonproperties.ae/"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Costa Mare\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["The developer page read on 13 Nov 2026 prints: \"HANDOVER Q3 2028\"","unverified","none","https://costa-mare.ellingtonproperties.ae/"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"Costa Mare\", In progress), read 13 Nov 2026"},"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["listed","RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"ho":["future","developer page: \"HANDOVER Q3 2028\"","https://costa-mare.ellingtonproperties.ae/"],"co":null,"sq":{"handover":"developer","permit":"registry","developer":"developer"},"miss":null},"src":["https://costa-mare.ellingtonproperties.ae/","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"costaterra-golf-ocean-club-discovery-land":{"set":{"rvw":null}},"costavida-residential-resort-megaworld":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","official register for Philippines not looked up on the review date","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2029-Q2 not re-checked on the review date",null],"co":null,"sq":{"handover":"press","permit":"press","developer":"press"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: official register for Philippines not looked up on the review date","handover status not resolved"]}}},"cote-frange-verte":{"set":{"rvw":null}},"cote-swing":{"set":{"rvw":null}},"cotier-house-2-by-imtiaz":{"set":{"cl":[["Estimated completion date published as \"Q2 2027\"; the FAQ says \"the expected completion timeline will be in Q2 2027\"","unverified","none","https://imtiaz.ae/property/cotier-house-2-by-imtiaz"],["Construction progress shown as 23 overall: finishing works 1, MEP works 1, super-structure 63","unverified","none","https://imtiaz.ae/property/cotier-house-2-by-imtiaz"],["Studios to 3-bedroom apartments and penthouses in a marina-front setting on Dubai Islands","unverified","none","https://imtiaz.ae/property/cotier-house-2-by-imtiaz"],["The FAQ describes typical structures of 10% on booking, 40 to 50% during construction and the balance on handover","unverified","none","https://imtiaz.ae/property/cotier-house-2-by-imtiaz"],["Pin: coordinates of the map embedded on the developer page (labelled \"Cotier house 2 by Imtiaz\"); the address is the one published by the developer","unverified","none","https://imtiaz.ae/property/cotier-house-2-by-imtiaz"],["DLD project register: project 3671, status Active, completion date on the register 15 Apr 2027, 16.06% built at the DLD inspection of 20 Jul 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Ug Real Estate Development L.L.C (DLD developer 2212) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/cotier-house-2-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3671, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 20 Jul 2026: 16.06% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3671","rvw":null,"src":["https://imtiaz.ae/property/cotier-house-2-by-imtiaz","https://dubairealestateiq.com/project/cotier-house-2-by-imtiaz"]}},"courtyard-platinum":{"set":{"rvw":null}},"couture-by-cavalli":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q2, 2027\"","unverified","none","https://www.damacproperties.com/en/projects/couture-by-cavalli/"],["Residences along the Dubai Canal at Safa Park, branded by Roberto Cavalli","unverified","none","https://www.damacproperties.com/en/projects/couture-by-cavalli/"],["DLD project register: project 2459, status Active, completion date on the register 31 May 2025, 19.7% built at the DLD inspection of 8 Apr 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Damac Business Real Estate Co. L.L.C (DLD developer 1414) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/cavalli-couture"]],"ev":{"permit":"Registered as DLD project 2459, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Abu Dhabi Commercial Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 8 Apr 2026: 19.7% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Damac Business Real Estate Co. L.L.C (DLD developer 1414)","handover_promised":"2027-Q2","unit_types":["apartment"]},"pn":"DLD project registration 2459","rvw":null,"src":["https://www.damacproperties.com/en/projects/couture-by-cavalli/","https://dubairealestateiq.com/project/cavalli-couture"]}},"cove-boulevard-by-imtiaz":{"set":{"cl":[["\"ESTIMATED COMPLETION DATE\" Q2-2028; the page also says it is scheduled for completion in Q2 2028","unverified","none","https://imtiaz.ae/property/cove-boulevard-by-imtiaz"],["Mixed-use residential and office tower (2 basements, ground, 4 podium levels, 30 floors, rooftop): 172 studios, 62 one-bedroom, 48 two-bedroom and 5 three-bedroom apartments, and 149 offices","unverified","none","https://imtiaz.ae/property/cove-boulevard-by-imtiaz"],["Construction progress shown as 14 overall: sub-structure 70, super-structure 1, MEP works 0, finishing works 0","unverified","none","https://imtiaz.ae/property/cove-boulevard-by-imtiaz"],["Payment plans published: 60/40, or 70/30 with 30% paid quarterly over 3 years after handover","unverified","none","https://imtiaz.ae/property/cove-boulevard-by-imtiaz"],["Map embedded on the developer page points to 25.100121, 55.376645","unverified","none","https://imtiaz.ae/property/cove-boulevard-by-imtiaz"],["DLD project register: project 3675, status Active, completion date on the register 30 Oct 2028, 10.45% built at the DLD inspection of 30 Sep 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Real Estate Investment & Development L.L.C (DLD developer 1129) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/cove-boulevard-by-imtiaz"],["The developer page read on 13 Nov 2026 prints: \"construction progress 14 overall ESTIMATED COMPLETION DATE Q2-2028\"","unverified","none","https://imtiaz.ae/property/cove-boulevard-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3675, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 30 Sep 2026: 10.45% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3675","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/cove-boulevard-by-imtiaz"],"ho":["future","DLD register completion 30 Oct 2028; 10.45% built at the inspection of 30 Sep 2026; developer page: \"construction progress 14 overall ESTIMATED COMPLETION DATE Q2-2028\"","https://dubairealestateiq.com/project/cove-boulevard-by-imtiaz"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/cove-boulevard-by-imtiaz"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://imtiaz.ae/property/cove-boulevard-by-imtiaz","https://dubairealestateiq.com/project/cove-boulevard-by-imtiaz"]}},"cove-edition-5-by-imtiaz":{"set":{"cl":[["\"ESTIMATED COMPLETION DATE Q2 - 2027\"; the page FAQ says handover is scheduled for June 2027","unverified","none","https://imtiaz.ae/property/cove-edition-5-by-imtiaz"],["Construction progress shown as 47 overall: substructure 100, superstructure 95, MEP works 22, finishing works 20","unverified","none","https://imtiaz.ae/property/cove-edition-5-by-imtiaz"],["Studios, 1-bedroom and 2-bedroom apartments in a building of 2 basements, ground, 11 residential floors and rooftop","unverified","none","https://imtiaz.ae/property/cove-edition-5-by-imtiaz"],["Payment plans published: 50/50, or 20% on booking with 30% paid over 3 years after handover","unverified","none","https://imtiaz.ae/property/cove-edition-5-by-imtiaz"],["Map embedded on the developer page points to 25.08714, 55.38097","unverified","none","https://imtiaz.ae/property/cove-edition-5-by-imtiaz"],["DLD project register: project 3705, status Active, completion date on the register 20 May 2027, 26.32% built at the DLD inspection of 18 Aug 2026, escrow account bank Dubai Islamic Bank, registered developer Imtiaz Real Estate Investment & Development L.L.C (DLD developer 1129) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/cove-edition-residence-5-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3705, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 18 Aug 2026: 26.32% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3705","rvw":null,"src":["https://imtiaz.ae/property/cove-edition-5-by-imtiaz","https://dubairealestateiq.com/project/cove-edition-residence-5-by-imtiaz"]}},"cove-edition-6-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/imtiaz-developments/cove-edition-6"],["DLD project register: project 3803, status Active, completion date on the register 10 Sep 2027, 20.09% built at the DLD inspection of 13 Jul 2026, escrow account bank Ajman Bank /, registered developer Imtiaz Cove Real Estate Development L.L.C (DLD developer 2275) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/cove-edition-residence-6-by-imtiaz"],["The developer page read on 13 Nov 2026 prints: \"construction progress 34 overall ESTIMATED COMPLETION DATE Q4-2027\"","unverified","none","https://imtiaz.ae/property/cove-edition-6-by-imtiaz-1"]],"ev":{"permit":"Registered as DLD project 3803, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Ajman Bank / (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 13 Jul 2026: 20.09% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Imtiaz Cove Real Estate Development L.L.C (DLD developer 2275)","handover_promised":"2027-Q3"},"pn":"DLD project registration 3803","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/cove-edition-residence-6-by-imtiaz"],"ho":["future","DLD register completion 10 Sep 2027; 20.09% built at the inspection of 13 Jul 2026; developer page: \"construction progress 34 overall ESTIMATED COMPLETION DATE Q4-2027\"","https://dubairealestateiq.com/project/cove-edition-residence-6-by-imtiaz"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/cove-edition-residence-6-by-imtiaz"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://imtiaz.ae/property/cove-edition-6-by-imtiaz-1","https://www.propertyfinder.ae/en/new-projects/imtiaz-developments/cove-edition-6","https://dubairealestateiq.com/project/cove-edition-residence-6-by-imtiaz"]}},"cove-grand-imtiaz":{"set":{"cl":[["Project registered with DLD (project 3774, Active)","verified","registry","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],["Escrow account (Ajman Bank)","verified","registry","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],["Construction at 13.4% (DLD inspection 8 Oct 2026)","verified","registry","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],["Developer entity registered: Imtiaz Cove Real Estate Development L.L.C (DLD developer 2275)","verified","registry","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],["Developer track record: 10 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/imtiaz"],["Construction progress 15% overall (Imtiaz page) [DLD 13.4% at 8 Oct 2026, close to the developer figure]","verified","registry","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],["Completion Q4 2027","verified","registry","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],["86.6% of the building left to build in about 14 months to the registered completion date [Kolaboro observation from the register figures; superstructure only 3% per the developer]","unverified","none","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],["Registered sales median AED 763k, AED 1,561 per sq ft (370 sales, Oct 2025 to Sep 2026)","verified","registry","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/cove-grand-residences-dubai-land-residence-complex"],["No guaranteed returns advertised","unverified","none","https://imtiaz.ae/property/cove-grand-by-imtiaz"],["DLD project register: project 3774, status Active, completion date on the register 15 Dec 2027, 13.4% built at the DLD inspection of 8 Oct 2026, escrow account bank Ajman Bank /, registered developer Imtiaz Cove Real Estate Development L.L.C (DLD developer 2275) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],["The developer page read on 13 Nov 2026 prints: \"construction progress 16 overall ESTIMATED COMPLETION DATE Q4 -2027\"","unverified","none","https://imtiaz.ae/property/cove-grand-by-imtiaz"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],"ho":["future","DLD register completion 15 Dec 2027; 13.4% built at the inspection of 8 Oct 2026; developer page: \"construction progress 16 overall ESTIMATED COMPLETION DATE Q4 -2027\"","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/cove-grand-residence-by-imtiaz"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"url":"https://imtiaz.ae/property/cove-grand-by-imtiaz"}},"creative-homes-bulevar-iii-malaga-neinor":{"set":{"rvw":null}},"creek-waters-2-emaar":{"set":{"cl":[["Registered on the DLD project register as project no. 2634 on 15 May 2023","verified","registry","https://dubairealestateiq.com/project/creek-waters-2"],["Escrow account held at First Abu Dhabi Bank","verified","registry","https://dubairealestateiq.com/project/creek-waters-2"],["Construction stage: 81.84% built at DLD inspection on 31 Jul 2026","verified","registry","https://dubairealestateiq.com/project/creek-waters-2"],["Developer entity The Lagoons Phase One L.L.C registered with DLD (developer no. 1038)","verified","registry","https://dubairealestateiq.com/project/creek-waters-2"],["Project has 455 units on the register","verified","registry","https://dubairealestateiq.com/project/creek-waters-2"],["Developer group track record on DLD: 199 finished projects (358 total, 143 active)","verified","registry","https://dubairealestateiq.com/developer/emaar"],["Completion Q4 2027 (Dec 2027)","verified","registry","https://dubairealestateiq.com/project/creek-waters-2"],["Launch price from AED 1.9M","unverified","none","https://www.propertyfinder.ae/en/new-projects/emaar-properties/creek-waters-2"],["Construction started August 2023","verified","registry","https://dubairealestateiq.com/project/creek-waters-2"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/emaar-properties/creek-waters-2"],["Developer is Emaar Properties PJSC","verified","registry","https://dubairealestateiq.com/project/creek-waters-2"],["DLD project register: project 2634, status Active, completion date on the register 31 Dec 2027, 81.84% built at the DLD inspection of 31 Jul 2026, escrow account bank First Abu Dhabi Bank, registered developer The Lagoons Phase One L.L.C (DLD developer 1038) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/creek-waters-2"]],"rvw":null}},"creekside-residence-al-zorah":{"set":{"rvw":null}},"cross-celesta-nusa-penida":{"set":{"rvw":null}},"crown-penang":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 30744-1/07-2027/0684(A)-(S) for The Crown (30744-1), valid 2024-07-30 to 2027-07-29","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],["Developer Stellar Platinum Sdn. Bhd. holds developer licence 30744/04-2029/0086(A) (valid 2024-04-22 to 2029-04-21); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],["Register shows construction progress of 37.50% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],["Vacant possession due 20 Aug 2027 under the first sale agreement (Jadual H, 36 months, first SPA 20 Aug 2024); the register records an approved extension of 18 months to 20 Feb 2029","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],["APDL 30744-1/07-2027/0684(A)-(S) active","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],["Developer licence 30744/04-2029/0086(A) active","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],["588 units, 41 floors, RM783,000 to RM2,073,000","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],["Target completion December 2028","contradicted","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],["Completion originally targeted 2027","verified","registry","https://www.businesstoday.com.my/2023/05/03/chin-hin-group-partners-ivory-properties-to-develop-crown-penang/"],["Construction progress 37.50%","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],["JV between Stellar Platinum (Chin Hin Group Property) and Ivory Meadows (Ivory Properties)","verified","independent","https://www.businesstoday.com.my/2023/05/03/chin-hin-group-partners-ivory-properties-to-develop-crown-penang/"],["Ivory group has delivered completed projects in Penang","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta?q=IVORY&search_type=pemaju&page=1"],["Freehold land, charged to Malayan Banking Berhad","unverified","none","https://crownpenang.com/"],["Unit sizes 614 to 1,851 sq ft (2023 announcement said 495 to 1,367 sq ft)","contradicted","independent","https://www.businesstoday.com.my/2023/05/03/chin-hin-group-partners-ivory-properties-to-develop-crown-penang/"],["Serviced-residence title permits short-term rentals from day one (agent)","unverified","none","https://thecrown-penang.com/faq/"],["Buyer money held in a Housing Development Account","unverified","none","https://crownpenang.com/"]],"ev":{"permit":"Official site prints developer licence 30744/04-2029/0086(A) (22 Apr 2024 to 21 Apr 2029) and APDL 30744-1/07-2027/0684(A)-(S) (30 Jul 2024 to 29 Jul 2027); both active on TEDUH","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","progress":"TEDUH (HIMS 7(f)) reports 37.50%; no progress on the developer site","plans":"Official site shows floor plans for Types A, B, C, D","record":"TEDUH lists multiple completed Ivory group projects in Penang with CCC/CFO; Chin Hin Group Property Bhd is Bursa-listed (BusinessToday, StarProperty)","returns_ok":"No guaranteed return; an agent site says the project is 'structured for rental income' without figures"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],"ho":["future","date on record 2029-Q1; checked against: Vacant possession due 20 Aug 2027 under the first sale agreement (Jadual H, 36 months, first SPA 20 Aug 2024); the register records an approved extension of 18 months to 20 Feb 2029","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/30744-1"],"sq":{"handover":"registry","permit":"registry","price":"registry","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 30744-1/07-2027/0684(A)-(S) valid to 2027-07-29; progress 37.50%","code":"30744-1","checked":"2026-11-13"}}},"crystal-garden-cap-cana-gesproin":{"set":{"rvw":null}},"d-point-long-beach-dovec":{"set":{"cl":[["Construction started May 2025","unverified","none","https://www.dovecgroup.com/en/projects/d-point"],["Delivery December 2028","unverified","none","https://www.dovecgroup.com/en/projects/d-point"],["405 units","unverified","none","https://satisofisi.com/en/projeler/kibris/iskele/long-beach/d-point"],["Studio from GBP 132,000 (developer) vs GBP 127,000 (agent list Aug 2026)","contradicted","none","https://northerncyprusforsale.com/projects/d-point/"],["Studio net 34 m2 (developer) vs 42.63 m2 (agent)","contradicted","none","https://primekibris.com/en/projects/d-point"],["Döveç delivered six projects 2019-2025","unverified","none","https://uinvestgroup.com/northern-cyprus/developers/"],["36 years and 5,000+ homes","unverified","none","https://www.dovecgroup.com/en/north-cyprus-construction-company"],["Building permit issued","unverified","none","https://www.dovecgroup.com/en/projects/d-point"],["Deposit protection for buyers","unverified","none","https://www.dovecgroup.com/en/projects/d-point"],["The developer page read on 13 Nov 2026 prints: \"Delivery Date December 2028\"","unverified","none","https://www.dovecgroup.com/en/projects/d-point"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Northern Cyprus","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Delivery Date December 2028\"","https://www.dovecgroup.com/en/projects/d-point"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"portal","developer":"developer"},"miss":null},"url":"https://www.dovecgroup.com/en/projects/d-point"}},"da-vinci-tower-interiors-by-pagani":{"set":{"rvw":null}},"dalia-masaar-3-arada":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.arada.com/en/dalia-masaar-3/"],"co":null,"sq":{"handover":"press","price":"developer","developer":"press"},"miss":null}}},"damac-aykon-city-3":{"set":{"cl":[["Trakheesi permit 1982041975 (agency page)","unverified","none","https://a1properties.ae/project-details/aykon-city-3-business-bay-dubai"],["Project is registered with DLD (project 2200)","verified","registry","https://dubairealestateiq.com/project/aykon-city-3"],["Buyer payments go to a project escrow account","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/aykon-city-3"],["Registered developer entity is DAMAC Canal One Property Development L.L.C","verified","registry","https://www.cevitas.ae/en/projects/aykon-city-3"],["Handover Q4 2027","verified","registry","https://dubairealestateiq.com/project/aykon-city-3"],["Project is on its original schedule","contradicted","registry","https://www.binayah.com/dubai-construction-updates/aykon-city-3/"],["Construction under way (31.35% built)","verified","registry","https://dubairealestateiq.com/project/aykon-city-3"],["Starting price AED 650,000","contradicted","registry","https://dubairealestateiq.com/project/aykon-city-3"],["About 1,300 units in the project","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/aykon-city-3"],["DAMAC has delivered 50,000 units","verified","independent","https://www.tradearabia.com/News/464932/Damac-announces-handover-of-8%2c800-residential-units-across-Dubai/CONS"],["Freehold title available to foreigners (Business Bay freehold zone)","unverified","none","https://a1properties.ae/project-details/aykon-city-3-business-bay-dubai"],["Studio to 3BR units of about 425 to 2,010 sq ft","unverified","none","https://a1properties.ae/project-details/aykon-city-3-business-bay-dubai"],["DLD project register: project 2200, status Active, completion date on the register 30 Dec 2027, 31.35% built at the DLD inspection of 12 Apr 2026, escrow account bank Emirates Nbd Bank, registered developer Damac Canal One Property Development L.L.C (DLD developer 1119) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/aykon-city-3"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/aykon-city-3"],"ho":["future","DLD register completion 30 Dec 2027; 31.35% built at the inspection of 12 Apr 2026","https://dubairealestateiq.com/project/aykon-city-3"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/aykon-city-3"],"sq":{"handover":"registry","permit":"registry","price":"registry","developer":"registry"},"miss":null}}},"damac-bay-2-by-cavalli":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q4, 2028\"","unverified","none","https://www.damacproperties.com/en/projects/damac-bay-2-by-cavalli/"],["49-storey tower in Dubai Harbour with 1 to 5-bedroom apartments, branded by Cavalli","unverified","none","https://www.damacproperties.com/en/projects/damac-bay-2-by-cavalli/"],["DLD project register: project 2644, status Active, no completion date on the register, 30.3% built at the DLD inspection of 15 Jul 2026, escrow account bank Emirates Nbd Bank, registered developer Damac Mdn Investment L.L.C (DLD developer 1583) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-bay-2"]],"ev":{"permit":"Registered as DLD project 2644, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 15 Jul 2026: 30.3% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Damac Mdn Investment L.L.C (DLD developer 1583)","handover_promised":"2028-Q4","unit_types":["1-bedroom apartment","2-bedroom apartment","3-bedroom apartment","4-bedroom apartment","5-bedroom apartment"]},"pn":"DLD project registration 2644","rvw":null,"src":["https://www.damacproperties.com/en/projects/damac-bay-2-by-cavalli/","https://dubairealestateiq.com/project/damac-bay-2"],"st":"under construction"}},"damac-bay-by-cavalli-dubai":{"set":{"rvw":null}},"damac-casa":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q2, 2028\"","unverified","none","https://www.damacproperties.com/en/projects/damac-casa/"],["The page title says \"Luxury Apartments in Al Sufouh\"; 1 to 4-bedroom units are listed","unverified","none","https://www.damacproperties.com/en/projects/damac-casa/"],["DLD project register: project 2801, status Active, no completion date on the register, 33.55% built at the DLD inspection of 18 Aug 2026, escrow account bank Abu Dhabi Islamic Bank, registered developer Aqua Viridis Investment L.L.C (DLD developer 1637) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-casa"]],"ev":{"permit":"Registered as DLD project 2801, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Abu Dhabi Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 18 Aug 2026: 33.55% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Aqua Viridis Investment L.L.C (DLD developer 1637)","handover_promised":"2028-Q2","unit_types":["apartment"]},"pn":"DLD project registration 2801","rvw":null,"src":["https://www.damacproperties.com/en/projects/damac-casa/","https://dubairealestateiq.com/project/damac-casa"],"st":"under construction"}},"damac-islands-dubai":{"set":{"rvw":null}},"damac-riverside-views-dubai":{"set":{"rvw":null}},"damac-volta":{"set":{"cl":[["Project registered with DLD (project 2782, Active)","verified","registry","https://dubairealestateiq.com/project/volta-tower"],["Escrow account (Emirates NBD)","verified","registry","https://dubairealestateiq.com/project/volta-tower"],["Construction at 29.26% (DLD inspection 18 Aug 2026)","verified","registry","https://dubairealestateiq.com/project/volta-tower"],["Developer entity registered: Damac C S L Investment L.L.C (DLD developer 1636)","verified","registry","https://dubairealestateiq.com/project/volta-tower"],["Developer track record: 145 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/damac"],["Handover Q2 2028 (DAMAC) [DLD registered completion 31 Dec 2027; at 29.26% in Aug 2026 the registered date looks out of reach, while the marketed date gives 21 months]","contradicted","registry","https://dubairealestateiq.com/project/volta-tower"],["Construction started 14 Dec 2023 (Property Finder) [DLD start date 13 Dec 2023]","verified","registry","https://dubairealestateiq.com/project/volta-tower"],["DAMAC delivered about 50,000 units since 2002 [company statement]","unverified","none","https://www.tradearabia.com/News/464932/Damac-announces-handover-of-8%2c800-residential-units-across-Dubai/CONS"],["Registered sales median AED 2.9m, AED 2,390 per sq ft (28 sales)","verified","registry","https://dubairealestateiq.com/project/volta-tower"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/volta-tower-downtown-dubai"],["No guaranteed returns advertised","unverified","none","https://www.damacproperties.com/en/projects/volta/"],["DLD project register: project 2782, status Active, completion date on the register 31 Dec 2027, 29.26% built at the DLD inspection of 18 Aug 2026, escrow account bank Emirates Nbd Bank, registered developer Damac C S L Investment L.L.C (DLD developer 1636) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/volta-tower"],["The developer page read on 13 Nov 2026 prints: \"Handover Q2, 2028\"","unverified","none","https://www.damacproperties.com/en/projects/volta/"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/volta-tower"],"ho":["future","DLD register completion 31 Dec 2027; 29.26% built at the inspection of 18 Aug 2026; developer page: \"Handover Q2, 2028\"","https://dubairealestateiq.com/project/volta-tower"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/volta-tower"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"url":"https://www.damacproperties.com/en/projects/volta/"}},"danube-bayz-101":{"set":{"cl":[["Project registered with DLD (project 2927, Active)","verified","registry","https://dubairealestateiq.com/project/bayz-101-by-danube"],["Escrow account (First Abu Dhabi Bank)","verified","registry","https://dubairealestateiq.com/project/bayz-101-by-danube"],["Construction at 10% (DLD inspection 12 Aug 2026)","verified","registry","https://dubairealestateiq.com/project/bayz-101-by-danube"],["Developer entity registered: Danube Properties Development L.L.C (DLD developer 1009)","verified","registry","https://dubairealestateiq.com/project/bayz-101-by-danube"],["Developer track record: 19 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/danube"],["Completion June 2028 [DLD register lists no completion date; 10% built after 25 months makes June 2028 demanding]","unverified","none","https://dubairealestateiq.com/project/bayz-101-by-danube"],["1,346 apartments","verified","registry","https://dubairealestateiq.com/project/bayz-101-by-danube"],["Payment plan 30/70 (Danube) versus 73/1 (A1)","contradicted","none","https://danubeproperties.com/portfolio/bayz101/"],["Construction progressing on schedule (aggregator) [DLD shows 0.9 points gained between Apr and Aug 2026]","unverified","none","https://aigentsrealty.com/areas/business-bay/bayz-101"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/bayz-101-business-bay-dubai"],["No guaranteed returns advertised","unverified","none","https://danubeproperties.com/portfolio/bayz101/"],["DLD project register: project 2927, status Active, no completion date on the register, 10% built at the DLD inspection of 12 Aug 2026, escrow account bank First Abu Dhabi Bank, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/bayz-101-by-danube"]],"rvw":null}},"dasa-ubud-balitecture":{"set":{"rvw":null}},"daslu-residences-sao-paulo":{"set":{"rvw":null}},"davenue-puerto-vallarta-dgroup":{"set":{"rvw":null}},"dcondo-cove-phuket":{"set":{"rvw":null}},"deiterra-accra":{"set":{"rvw":null}},"delos-metsovou-residences-exarcheia":{"set":{"rvw":null}},"dh-banpo-124-banpo-jugong-no-1-zones-1-2-and-4-rebuilding-se":{"set":{"rvw":null}},"diamond-bay-garden-ocic":{"set":{"rvw":null}},"diamondz-by-danube-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/danube-properties/diamondz"],["DLD project register: project 3017, status Active, no completion date on the register, 16.32% built at the DLD inspection of 20 Jul 2026, escrow account bank Ajman Bank /, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/diamondz-by-danube"]],"ev":{"permit":"Registered as DLD project 3017, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Ajman Bank / (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 20 Jul 2026: 16.32% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Danube Properties Development L.L.C (DLD developer 1009)"},"pn":"DLD project registration 3017","rvw":null,"src":["https://danubeproperties.com/portfolio/diamondz/","https://www.propertyfinder.ae/en/new-projects/danube-properties/diamondz","https://dubairealestateiq.com/project/diamondz-by-danube"]}},"diplo-east-mbg-developments":{"set":{"rvw":null}},"district-at-downtown":{"set":{"rvw":null}},"divine-klcc-chin-hin-property":{"set":{"rvw":null}},"djuba-estate-mozambique":{"set":{"rvw":null}},"dolerite-ridge-namibia":{"set":{"rvw":null}},"domaine-de-meysonet":{"set":{"rvw":null}},"domaine-eden-du-cap":{"set":{"rvw":null}},"domville-cherrywood-dublin-william-neville":{"set":{"rvw":null}},"dos-piedras-residences-cabo-corridor":{"set":{"rvw":null}},"dream-catcher-village-pt-kayla-purnama-international":{"set":{"rvw":null}},"dubovica-budva-residential-complex":{"set":{"rvw":null}},"dusit-ajara-hua-hin-dusit-estate":{"set":{"rvw":null}},"dusit-thani-residences-ajman-aqaar":{"set":{"rvw":null}},"dwtn-residences-deyaar":{"set":{"cl":[["Registered on the DLD project register as project no. 3777 on 3 Jun 2025","verified","registry","https://dubairealestateiq.com/project/downtown-residences"],["Escrow account held at First Abu Dhabi Bank","verified","registry","https://dubairealestateiq.com/project/downtown-residences"],["Construction stage: 1.25% built at DLD inspection on 24 Sep 2026","verified","registry","https://dubairealestateiq.com/project/downtown-residences"],["Developer entity Deyaar Development (P.J.S.C) registered with DLD (developer no. 15)","verified","registry","https://dubairealestateiq.com/project/downtown-residences"],["Project has 524 units on the register","verified","registry","https://dubairealestateiq.com/project/downtown-residences"],["Developer group track record on DLD: 29 finished projects (42 total, 10 active)","verified","registry","https://dubairealestateiq.com/developer/deyaar"],["Completion Q4 2030","verified","registry","https://dubairealestateiq.com/project/downtown-residences"],["About 522 homes (The National) vs 524 units on register","verified","independent","https://www.thenationalnews.com/business/property/2025/06/10/dubais-deyaar-unveils-towering-residential-project-with-royal-palace-at-the-top"],["Deyaar is a Dubai-listed developer","verified","independent","https://www.thenationalnews.com/business/property/2025/06/10/dubais-deyaar-unveils-towering-residential-project-with-royal-palace-at-the-top"],["Price from AED 2.1M","unverified","none","https://www.propertyfinder.ae/en/new-projects/deyaar-leasing/dwtn-residences"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/deyaar-leasing/dwtn-residences"],["DLD project register: project 3777, status Active, completion date on the register 30 Dec 2030, 1.25% built at the DLD inspection of 24 Sep 2026, escrow account bank First Abu Dhabi Bank, registered developer Deyaar Development (P.J.S.C) (DLD developer 15) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/downtown-residences"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/downtown-residences"],"ho":["future","DLD register completion 30 Dec 2030; 1.25% built at the inspection of 24 Sep 2026","https://dubairealestateiq.com/project/downtown-residences"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/downtown-residences"],"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":null},"st":"under construction","url":"https://www.deyaar.ae/en/properties/dwtn-residences/"}},"dyar-al-haram-arabian-dyar":{"set":{"rvw":null}},"eagle-tower-by-tm-costa-blanca":{"set":{"rvw":null}},"eastvale-egypt":{"set":{"rvw":null}},"eaton-park-gamuda-land":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Vietnam","https://kolaboro.com/registers/"],"ho":["future","date on record 2027-Q3; developer page read on 13 Nov 2026: \"tandard system established by Gamuda Land itself, targeting the delivery of perfect homes to customers starting from Q3/2027. Strong Appeal from a Real Estate Project Setting Impressiv\"","https://gamudaland.com.vn/en/news/news-and-story-38"],"co":null,"sq":{"handover":"press","permit":"developer","price":"press","developer":"developer"},"miss":null}}},"eaton-park-thu-duc-hcmc":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Vietnam","https://kolaboro.com/registers/"],"ho":["future","date on record 2027-Q3; developer page read on 13 Nov 2026: \"tandard system established by Gamuda Land itself, targeting the delivery of perfect homes to customers starting from Q3/2027. Strong Appeal from a Real Estate Project Setting Impressiv\"","https://gamudaland.com.vn/en/news/news-and-story-38"],"co":null,"sq":{"handover":"press","permit":"press","price":"press","developer":"press"},"miss":null}}},"ebano-santa-maria-panama":{"set":{"rvw":null}},"ebruli-basaksehir":{"set":{"rvw":null}},"eclipse-sant-elm-balearics":{"set":{"rvw":null}},"eco-radiance-artisan-homes-phase-5":{"set":{"rvw":null}},"eden-beach-phase-3-taylor-wimpey-espana":{"set":{"cl":[["Phase 1 (Building 1) delivered April 2025 and 100% sold","unverified","none","https://taylorwimpeyspain.com/es/casa/eden-beach-torrevieja-alicante/"],["Phase 2 delivery October 2026, last penthouses available","unverified","none","https://taylorwimpeyspain.com/es/casa/eden-beach-torrevieja-alicante/"],["Phase 3 (Building 3) delivery 15 September 2027","unverified","none","https://taylorwimpeyspain.com/es/casa/eden-beach-torrevieja-alicante/"],["2-bed apartments from EUR 330,000 (65.56 m2), penthouses from EUR 540,000","unverified","none","https://taylorwimpeyspain.com/es/casa/eden-beach-torrevieja-alicante/"],["700 m from La Mata beach, 40 minutes from Alicante airport","unverified","none","https://taylorwimpeyspain.com/es/casa/eden-beach-torrevieja-alicante/"],["Payments on account by poliza or aval under the LOE","unverified","none","https://taylorwimpeyspain.com/es/guia-compra/"],["Taylor Wimpey's Spanish business completed 494 homes in 2025, mainly second homes for international buyers","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["Taylor Wimpey guides 350 to 400 Spanish completions in 2026","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["Energy performance certificate issued for the building","unverified","none","https://taylorwimpeyspain.com/wp-content/uploads/2024/03/Eden-Beach-Torrevieja-Certificado-Energetico-CEE.pdf"],["Building licence for Phase 3 granted by Torrevieja council","unverified","none","https://taylorwimpeyspain.com/es/casa/eden-beach-torrevieja-alicante/"],["The developer page read on 13 Nov 2026 prints: \"Fase 3 (Edificio 3): Septiembre 2027\"","unverified","none","https://taylorwimpeyspain.com/es/casa/eden-beach-torrevieja-alicante/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["phased","The page dates phase 1 (building 1) April 2025, 100% sold, phase 2 (building 2) October 2026 and phase 3 (the building tracked here) September 2027; the October 2026 date of phase 2 has passed with no handover notice on the page.","https://taylorwimpeyspain.com/es/casa/eden-beach-torrevieja-alicante/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"eden-rise-samui-edenroc":{"set":{"rvw":null}},"edenia-costa-blanca":{"set":{"rvw":null}},"edge-house-miami":{"set":{"rvw":null}},"edge-raha-island-ras-al-khaimah":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/rak-properties/edge-at-raha-island"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"EDGE\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"EDGE\", In progress), read 13 Nov 2026"},"rvw":null,"src":["https://www.propertyfinder.ae/en/new-projects/rak-properties/edge-at-raha-island","https://www.rakproperties.ae/our-properties/edge/","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"edificio-lira-622-chile":{"set":{"rvw":null}},"edificio-santa-corina-chile":{"set":{"rvw":null}},"edition-birmingham-centenary-tower-sphere-select":{"set":{"rvw":null}},"edition-residences-miami-edgewater":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77415 \"2121 N BAYSHORE, A CONDO\", developer entity TRD BISCAYNE LLC (matched by the street address in the project name)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["185 units, 55 storeys, 649 ft","verified","independent","https://www.groundbreak.city/miami/biscayne-21-redevelopment-approved-edgewater"],["Units completed by about June 2028 per buyer contracts","verified","independent","https://therealdeal.com/miami/2026/05/14/edition-residences-miami-buyers-sues-two-roads/"],["First tower to be completed by end of 2026 (original 2022 plan)","contradicted","independent","https://therealdeal.com/miami/2026/09/03/timeline-of-two-roads-condo-buyout-fight-in-miami/"],["Settlement with Biscayne 21 holdouts funded 31 Aug 2026 (about USD 50m)","verified","independent","https://therealdeal.com/miami/2026/09/03/timeline-of-two-roads-condo-buyout-fight-in-miami/"],["Buyers' suit over deposits 'without merit' (developer)","unverified","independent","https://therealdeal.com/miami/2026/05/14/edition-residences-miami-buyers-sues-two-roads/"],["Prices from USD 1.7m","verified","independent","https://therealdeal.com/miami/2026/09/03/timeline-of-two-roads-condo-buyout-fight-in-miami/"],["Site acquisition financed with USD 105m Bank OZK senior loan and USD 45m mezzanine","verified","independent","https://therealdeal.com/miami/2026/09/03/timeline-of-two-roads-condo-buyout-fight-in-miami/"],["Construction start 30 Sep 2026, contractor Coastal Construction","unverified","none","https://pro.groundbreak.city/miami/projects/2ad83638-ffb2-47bf-b5b3-a940de6abf34"],["Completion Sep 2029 vs Dec 2029 across tracker entries","contradicted","none","https://pro.groundbreak.city/miami/projects/7d90d53d-4d3c-4d95-b542-ee351fc66e54"],["Building permit for the new tower issued","unverified","none","https://www.hauteresidence.com/news/edition-residences-miami-edgewater-two-roads-settles-with-biscayne-21-owners/"],["Two Roads delivered Elysee (95 residences, built 2021)","verified","independent","https://www.theroeblingteam.com/miami/buildings/elysee"]],"ev":{"permit":"Florida DBPR developer summary (official CSV, read 13 Nov 2026): PR77415 2121 N BAYSHORE, A CONDO by TRD BISCAYNE LLC","escrow":"Florida law requires condo deposits to be held in escrow, but the developer publishes no escrow agent or terms; buyers are suing to recover deposits","progress":"Dated public milestones: settlement funded 31 Aug 2026, demolition permit 26 Aug 2026; construction not started","plans":"Unit size range and renders only; no floor plans seen in sources opened","record":"Elysee (788 NE 23rd St, 95 residences, built 2021) is listed as a Two Roads development by the Biscayne Neighborhoods Association and in county-record-based building data; The Real Deal calls Edition the firm's third Edgewater condo"},"pn":"Florida DBPR condominium filing PR77415; Miami-Dade demolition permit 2026067492 for the existing Biscayne 21 building (issued 26 Aug 2026, not a building permit for the tower)","rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["not checked","date on record 2029-Q4 not re-checked on the review date",null],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"registry"},"miss":["handover status not resolved"]},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77415","code":"PR77415","checked":"2026-11-13"},"src":["https://bnamiami.org/residential/","https://pro.groundbreak.city/miami/projects/2ad83638-ffb2-47bf-b5b3-a940de6abf34","https://pro.groundbreak.city/miami/projects/7d90d53d-4d3c-4d95-b542-ee351fc66e54","https://realestatetrail.com/news/two-roads-edition-miami-condo","https://therealdeal.com/miami/2026/05/14/edition-residences-miami-buyers-sues-two-roads/","https://therealdeal.com/miami/2026/09/03/timeline-of-two-roads-condo-buyout-fight-in-miami/","https://tworoadsre.com/press/miami-market-2/","https://tworoadsre.com/projects/elysee-miami/","https://www.bizjournals.com/southflorida/news/2026/09/01/edition-condo-miami-edgewater-clears-legal-hurdle.html","https://www.groundbreak.city/miami/biscayne-21-redevelopment-approved-edgewater","https://www.hauteresidence.com/news/edition-residences-miami-edgewater-two-roads-settles-with-biscayne-21-owners/","https://www.theroeblingteam.com/miami/buildings/elysee","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"]}},"ege-yapi-alsancak":{"set":{"rvw":null}},"ege-yapi-beyoglu":{"set":{"rvw":null}},"ege-yapi-gokturk":{"set":{"rvw":null}},"ege-yapi-kordon-izmir":{"set":{"rvw":null}},"ege-yapi-oliville-halkidiki":{"set":{"rvw":null}},"egerie-france":{"set":{"rvw":null}},"eko-savannah-mj-developpement":{"set":{"rvw":null}},"el-sol-seagrove-golden-topper":{"set":{"rvw":null}},"elanique-huahin-94-fullrich-asset":{"set":{"rvw":null}},"elaris-sky-object-1":{"set":{"cl":[["Registered with DLD (project 4019)","verified","registry","https://dubairealestateiq.com/project/elaris-sky"],["Instalments go into a RERA supervised escrow account","verified","registry","https://dxbpropy.ai/offplan/elaris-sky-jumeirah-village-triangle-b3172"],["Handover Q4 2028 (register 30 Sep 2028)","verified","registry","https://dubairealestateiq.com/project/elaris-sky"],["Status 'Under Construction' (developer page)","contradicted","registry","https://dubairealestateiq.com/project/elaris-sky"],["Studios from AED 767,000 (registered studio median about AED 772k)","verified","registry","https://www.dxbrealtor.ai/projects/elaris-sky/"],["409 units (register) vs 100 residences (one agent)","verified","registry","https://dubairealestateiq.com/project/elaris-sky"],["Object 1 has finished projects on the register (2)","verified","registry","https://dubairealestateiq.com/developer/object-1"],["Service charge estimate AED 15 per sq ft","unverified","none","https://www.object1.com/off-plan/elar1s-sky-at-jumeirah-village-triangle"],["Freehold for all nationalities","unverified","none","https://www.object1.com/off-plan/elar1s-sky-at-jumeirah-village-triangle"],["DLD project register: project 4019, status Active, completion date on the register 30 Sep 2028, 0.19% built at the DLD inspection of 3 Aug 2026, escrow account bank Abu Dhabi Islamic Bank, registered developer Object One Real Estate Development L.L.C (DLD developer 1579) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/elaris-sky"]],"rvw":null}},"elegance-residence-pattaya":{"set":{"rvw":null}},"element-residence-bali":{"set":{"rvw":null}},"elements-cyprus":{"set":{"rvw":null}},"elevenonb-blok":{"set":{"rvw":null}},"elit-manta-helios-and-calypso-towers-ecuador":{"set":{"rvw":null}},"ella-miami-beach":{"set":{"rvw":null}},"elle-residences-miami-miami":{"set":{"rvw":null}},"ellington-sands-i-ellington":{"set":{"cl":[["Project registered with DLD (no. 4139) on 30 Oct 2025","verified","registry","https://www.homesearch.ae/for-sale/off-plan/ellington/ellington-sands-i-4139"],["Escrow account at Commercial Bank of Dubai","verified","registry","https://www.homesearch.ae/for-sale/off-plan/ellington/ellington-sands-i-4139"],["471 units in two buildings","verified","registry","https://www.homesearch.ae/for-sale/off-plan/ellington/ellington-sands-i-4139"],["Construction under way","contradicted","registry","https://www.homesearch.ae/for-sale/off-plan/ellington/ellington-sands-i-4139"],["Handover Q2 2028","unverified","none","https://www.homesearch.ae/for-sale/off-plan/ellington/ellington-sands-i-4139"],["Prices from about AED 2.15M","verified","registry","https://www.homesearch.ae/for-sale/off-plan/ellington/ellington-sands-i-4139"],["Ellington delivered Ellington House II and Arbor View (handover from May 2026)","verified","independent","https://meconstructionnews.com/67596/ellington-begins-handover-of-2-residential-projects/amp"],["Ellington has 30 completed projects","unverified","none","https://www.prop971.com/project/PRJ-ELL-O2EXH"],["Freehold for foreign buyers on Dubai Islands","unverified","none","https://www.propertyfinder.ae/en/new-projects/ellington/ellington-sands"],["DLD project register: project 4139, status Active, completion date on the register 31 Dec 2028, 0.37% built at the DLD inspection of 5 Jun 2026, escrow account bank Commercial Bank Of Dubai(Psc), registered developer Ellington Properties Development L.L.C (DLD developer 1117) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/ellington-sands-i"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/ellington-sands-i"],"ho":["future","DLD register completion 31 Dec 2028; 0.37% built at the inspection of 5 Jun 2026","https://dubairealestateiq.com/project/ellington-sands-i"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/ellington-sands-i"],"sq":{"handover":"registry","permit":"registry","price":"press","developer":"registry"},"miss":null},"src":["https://bayut-production.s3.eu-central-1.amazonaws.com/file/1445407/c6ce25e1252c4631bfafb091fac85b15.pdf","https://continentalclub.ae/project/ellington-sands-1-dubai-islands/","https://ellington-sands.ellingtonproperties.ae/","https://meconstructionnews.com/67596/ellington-begins-handover-of-2-residential-projects/amp","https://www.homesearch.ae/for-sale/off-plan/ellington/ellington-sands-i-4139","https://www.mitchellscommercialrealty.com/off-plan/ellington-sands-i","https://www.mitchellscommercialrealty.com/projects/ellington-sands","https://www.prop971.com/project/PRJ-ELL-O2EXH","https://www.propertyfinder.ae/en/new-projects/ellington/ellington-sands","https://dubairealestateiq.com/project/ellington-sands-i"],"url":"https://ellington-sands.ellingtonproperties.ae/"}},"elo-2-damac-hills-2":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q2, 2027\"","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/elo-2/"],["1 and 2-bedroom apartments in the parklands of DAMAC Hills 2","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/elo-2/"],["DLD project register: project 3122, status Active, completion date on the register 30 Jun 2027, 6.36% built at the DLD inspection of 15 Apr 2026, escrow account bank Emirates Nbd Bank, registered developer Front Line Investment Management L.L.C (DLD developer 1021) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-hills-2-elo-2-and-elo-3"]],"ev":{"permit":"Registered as DLD project 3122, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 15 Apr 2026: 6.36% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Front Line Investment Management L.L.C (DLD developer 1021)","handover_promised":"2027-Q2","unit_types":["1-bedroom apartment","2-bedroom apartment"]},"pn":"DLD project registration 3122","rvw":null,"src":["https://www.damacproperties.com/en/communities/damac-hills-2/projects/elo-2/","https://dubairealestateiq.com/project/damac-hills-2-elo-2-and-elo-3"]}},"elo-3-damac-hills-2":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q3, 2027\"","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/elo-3/"],["Third ELO building in DAMAC Hills 2; 1 and 2-bedroom apartments","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/elo-3/"],["DLD project register: project 3122, status Active, completion date on the register 30 Jun 2027, 6.36% built at the DLD inspection of 15 Apr 2026, escrow account bank Emirates Nbd Bank, registered developer Front Line Investment Management L.L.C (DLD developer 1021) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-hills-2-elo-2-and-elo-3"]],"ev":{"permit":"Registered as DLD project 3122, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 15 Apr 2026: 6.36% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Front Line Investment Management L.L.C (DLD developer 1021)","handover_promised":"2027-Q3","unit_types":["1-bedroom apartment","2-bedroom apartment"]},"pn":"DLD project registration 3122","rvw":null,"src":["https://www.damacproperties.com/en/communities/damac-hills-2/projects/elo-3/","https://dubairealestateiq.com/project/damac-hills-2-elo-2-and-elo-3"]}},"elo-damac-hills-2":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q4, 2026\"","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/elo/"],["A curved tower with cascading private balconies in DAMAC Hills 2","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/elo/"],["DLD project register: project 2995, status Active, no completion date on the register, 21.5% built at the DLD inspection of 15 Apr 2026, escrow account bank Emirates Nbd Bank, registered developer Front Line Investment Management L.L.C (DLD developer 1021) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-hills-2-elo"]],"ev":{"permit":"Registered as DLD project 2995, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 15 Apr 2026: 21.5% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Front Line Investment Management L.L.C (DLD developer 1021)","handover_promised":"2026-Q4","unit_types":["apartment"]},"pn":"DLD project registration 2995","rvw":null,"src":["https://www.damacproperties.com/en/communities/damac-hills-2/projects/elo/","https://dubairealestateiq.com/project/damac-hills-2-elo"]}},"elokence-france":{"set":{"rvw":null}},"elou-jardins":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.solyd.pt/en/elou-jardins/"],"co":null,"sq":{"handover":"developer","price":"developer"},"miss":null}}},"elounda-hills-crete":{"set":{"rvw":null}},"eltiera-heights-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/ellington/eltiera-heights"],["DLD project register: project 3852, status Active, completion date on the register 31 Dec 2028, 3.01% built at the DLD inspection of 20 Jul 2026, escrow account bank National Bank Of Ras Al- Khaimah (P.S.C), registered developer Ellington Pcfc Developers L.L.C (DLD developer 2371) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/eltiera-heights"]],"ev":{"permit":"Registered as DLD project 3852, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank National Bank Of Ras Al- Khaimah (P.S.C) (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 20 Jul 2026: 3.01% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Ellington Pcfc Developers L.L.C (DLD developer 2371)","handover_promised":"2028-Q4"},"pn":"DLD project registration 3852","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/eltiera-heights"],"ho":["future","DLD register completion 31 Dec 2028; 3.01% built at the inspection of 20 Jul 2026","https://dubairealestateiq.com/project/eltiera-heights"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/eltiera-heights"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://ellingtonproperties.ae/en/property-for-sale/eltiera-heights-jumeirah-islands","https://www.propertyfinder.ae/en/new-projects/ellington/eltiera-heights","https://dubairealestateiq.com/project/eltiera-heights"],"st":"under construction"}},"eltiera-views-ellington":{"set":{"cl":[["Project registered with DLD (project 4116, Active)","verified","registry","https://dubairealestateiq.com/project/eltiera-views"],["Escrow account (Abu Dhabi Commercial Bank)","verified","registry","https://dubairealestateiq.com/project/eltiera-views"],["Construction at 0% (DLD inspection 5 Dec 2025)","verified","registry","https://dubairealestateiq.com/project/eltiera-views"],["Developer entity registered: Ellington Pcfc Developers L.L.C (DLD developer 2371)","verified","registry","https://dubairealestateiq.com/project/eltiera-views"],["Developer track record: 21 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/ellington"],["Handover Q4 2029","verified","registry","https://dubairealestateiq.com/project/eltiera-views"],["Launched Dec 2025 as a follow-up to Eltiera Heights [Khaleej Times item republishes the developer statement]","verified","independent","https://www.khaleejtimes.com/business-technology-review/ellington-properties-unveils-new-residential-development"],["Registered sales median AED 2.2m, AED 2,498 per sq ft (626 sales, Oct 2025 to Sep 2026)","verified","registry","https://dubairealestateiq.com/project/eltiera-views"],["Project entity is a joint Ellington entity (Ellington Pcfc Developers L.L.C), not Ellington Properties itself","verified","registry","https://dubairealestateiq.com/project/eltiera-views"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/eltiera-views-jumeirah-islands-dubai"],["No guaranteed returns advertised","unverified","none","https://ellingtonproperties.ae/en/property-for-sale/eltiera-views-jumeirah-islands"],["DLD project register: project 4116, status Active, completion date on the register 31 Dec 2029, 0% built at the DLD inspection of 5 Dec 2025, escrow account bank Abu Dhabi Commercial Bank, registered developer Ellington Pcfc Developers L.L.C (DLD developer 2371) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/eltiera-views"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/eltiera-views"],"ho":["future","DLD register completion 31 Dec 2029; 0% built at the inspection of 5 Dec 2025","https://dubairealestateiq.com/project/eltiera-views"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/eltiera-views"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"url":"https://ellingtonproperties.ae/en/property-for-sale/eltiera-views-jumeirah-islands"}},"elysia-blu":{"set":{"rvw":null}},"elysian-gamuda-land-thu-duc":{"set":{"rvw":null}},"elysium-eco-city":{"set":{"rvw":null}},"elysium-fields-docklands-gurner":{"set":{"rvw":null}},"emaar-address-residences-dch":{"set":{"cl":[["Project registered with DLD (project 3229, Active)","verified","registry","https://dubairealestateiq.com/project/address-residences-l-dubai-creek-harbour"],["Escrow account (Emirates NBD)","verified","registry","https://dubairealestateiq.com/project/address-residences-l-dubai-creek-harbour"],["Construction at 26.44% (DLD inspection 4 May 2026)","verified","registry","https://dubairealestateiq.com/project/address-residences-l-dubai-creek-harbour"],["Developer entity registered: Dubai Creek Harbour L.L.C (DLD developer 1224)","verified","registry","https://dubairealestateiq.com/project/address-residences-l-dubai-creek-harbour"],["Developer track record: 199 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/emaar"],["Handover Q1 2029","verified","registry","https://dubairealestateiq.com/project/address-residences-l-dubai-creek-harbour"],["Starting price AED 2,000,000 [DLD registered sales median AED 3.4m, AED 2,945 per sq ft (32 sales)]","unverified","none","https://www.emaar.com/en/properties/address-residences-at-dubai-creek-harbour"],["Address hotel brand residences","unverified","none","https://www.emaar.com/en/properties/address-residences-at-dubai-creek-harbour"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/address-residences-dubai-creek-harbour"],["No guaranteed returns advertised","unverified","none","https://a1properties.ae/project-details/address-residences-dubai-creek-harbour"],["DLD project register: project 3229, status Active, completion date on the register 31 Jan 2029, 26.44% built at the DLD inspection of 4 May 2026, escrow account bank Emirates Nbd Bank, registered developer Dubai Creek Harbour L.L.C (DLD developer 1224) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/address-residences-l-dubai-creek-harbour"]],"rvw":null}},"emaar-club-drive":{"set":{"cl":[["Project registered with DLD (project 2769, Active)","verified","registry","https://dubairealestateiq.com/project/club-drive"],["Escrow account (Mashreq Bank)","verified","registry","https://dubairealestateiq.com/project/club-drive"],["Construction at 75.08% (DLD inspection 4 May 2026)","verified","registry","https://dubairealestateiq.com/project/club-drive"],["Developer entity registered: Dubai Hills Estate L.L.C (DLD developer 984)","verified","registry","https://dubairealestateiq.com/project/club-drive"],["Developer track record: 199 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/emaar"],["Handover Q1 2028 (A1) [DLD register lists no completion date; 75% built by May 2026 is consistent with an early 2028 or earlier finish]","unverified","none","https://dubairealestateiq.com/project/club-drive"],["Progress 0% (Binayah page, undated) [DLD 75.08% at 4 May 2026]","contradicted","registry","https://dubairealestateiq.com/project/club-drive"],["Registered sales median AED 1.6m, AED 2,173 per sq ft (20 sales)","verified","registry","https://dubairealestateiq.com/project/club-drive"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/club-drive-dubai-hills-estate-dubai"],["No guaranteed returns advertised","unverified","none","https://a1properties.ae/project-details/club-drive-dubai-hills-estate-dubai"],["DLD project register: project 2769, status Active, no completion date on the register, 75.08% built at the DLD inspection of 4 May 2026, escrow account bank Mashreq Bank Psc, registered developer Dubai Hills Estate L.L.C (DLD developer 984) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/club-drive"]],"rvw":null}},"emaar-golf-vale":{"set":{"cl":[["Project registered with DLD (project 4416, Active)","verified","registry","https://dubairealestateiq.com/project/golf-vale"],["Escrow account (Dubai Islamic Bank)","verified","registry","https://dubairealestateiq.com/project/golf-vale"],["Construction at 0% (DLD inspection 24 Feb 2026)","verified","registry","https://dubairealestateiq.com/project/golf-vale"],["Developer entity registered: Emaar Dubai South Dwc Llc (DLD developer 1155)","verified","registry","https://dubairealestateiq.com/project/golf-vale"],["Developer track record: 199 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/emaar"],["Handover Q1 2030","verified","registry","https://dubairealestateiq.com/project/golf-vale"],["Starting price AED 1.09M (Emaar headline) [same page lists available units from AED 1,987,888; DLD registered sales median AED 1.6m (238 sales)]","contradicted","none","https://www.emaar.com/en/properties/golf-vale-at-emaar-south"],["Units 262 on DLD register","verified","registry","https://dubairealestateiq.com/project/golf-vale"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/golf-vale-emaar-south-dubai"],["No guaranteed returns advertised","unverified","none","https://www.emaar.com/en/properties/golf-vale-at-emaar-south"],["DLD project register: project 4416, status Active, completion date on the register 31 Mar 2030, 0% built at the DLD inspection of 24 Feb 2026, escrow account bank Dubai Islamic Bank, registered developer Emaar Dubai South Dwc Llc (DLD developer 1155) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/golf-vale"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/golf-vale"],"ho":["future","DLD register completion 31 Mar 2030; 0% built at the inspection of 24 Feb 2026","https://dubairealestateiq.com/project/golf-vale"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/golf-vale"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"url":"https://www.emaar.com/en/properties/golf-vale-at-emaar-south"}},"emaar-montiva":{"set":{"cl":[["Project registered with DLD (project 3744, Active)","verified","registry","https://dubairealestateiq.com/project/montiva"],["Escrow account (Emirates Islamic Bank)","verified","registry","https://dubairealestateiq.com/project/montiva"],["Construction at 5.85% (DLD inspection 22 Apr 2026)","verified","registry","https://dubairealestateiq.com/project/montiva"],["Developer entity registered: Dubai Creek Harbour L.L.C (DLD developer 1224)","verified","registry","https://dubairealestateiq.com/project/montiva"],["Developer track record: 199 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/emaar"],["Handover Q3 2029","verified","registry","https://dubairealestateiq.com/project/montiva"],["Starting price AED 1.91M [developer and A1 agree; DLD registered sales median AED 2.9m, AED 2,525 per sq ft (243 sales)]","verified","none","https://www.emaar.com/en/properties/montiva-by-vida-at-dubai-creek-harbour"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/montiva-by-vida-dubai-creek-harbour"],["No guaranteed returns advertised","unverified","none","https://a1properties.ae/project-details/montiva-by-vida-dubai-creek-harbour"],["DLD project register: project 3744, status Active, completion date on the register 30 Sep 2029, 5.85% built at the DLD inspection of 22 Apr 2026, escrow account bank Emirates Islamic Bank, registered developer Dubai Creek Harbour L.L.C (DLD developer 1224) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/montiva"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/montiva"],"ho":["future","DLD register completion 30 Sep 2029; 5.85% built at the inspection of 22 Apr 2026","https://dubairealestateiq.com/project/montiva"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/montiva"],"sq":{"handover":"registry","permit":"registry","price":"press","developer":"registry"},"miss":null}}},"emaar-rosehill":{"set":{"cl":[["Project registered with DLD (project 3834, Active)","verified","registry","https://dubairealestateiq.com/project/rosehill"],["Escrow account (First Abu Dhabi Bank)","verified","registry","https://dubairealestateiq.com/project/rosehill"],["Construction at 7.83% (DLD inspection 2 Jun 2026)","verified","registry","https://dubairealestateiq.com/project/rosehill"],["Developer entity registered: Dubai Hills Estate L.L.C (DLD developer 984)","verified","registry","https://dubairealestateiq.com/project/rosehill"],["Developer track record: 199 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/emaar"],["Handover Q2 2029 (Jun 2029)","verified","registry","https://dubairealestateiq.com/project/rosehill"],["Payment milestone at 40% construction completion expected Feb 2027 [DLD shows 7.83% in Jun 2026, gaining only 1.3 points Jan to Jun 2026]","unverified","none","https://off-planproperties.ae/projects/rosehill-emaar-dubai-hills/"],["Starting price AED 1.6M (Emaar headline) [available units on the same page start at AED 1,756,888; DLD registered sales median AED 1.7m (166 sales)]","contradicted","none","https://www.emaar.com/en/properties/rosehill-dubai-hills-estate"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/rosehill-dubai-hills-estate-dubai"],["No guaranteed returns advertised","unverified","none","https://a1properties.ae/project-details/rosehill-dubai-hills-estate-dubai"],["DLD project register: project 3834, status Active, completion date on the register 30 Jun 2029, 7.83% built at the DLD inspection of 2 Jun 2026, escrow account bank First Abu Dhabi Bank, registered developer Dubai Hills Estate L.L.C (DLD developer 984) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/rosehill"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/rosehill"],"ho":["future","DLD register completion 30 Jun 2029; 7.83% built at the inspection of 2 Jun 2026","https://dubairealestateiq.com/project/rosehill"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/rosehill"],"sq":{"handover":"registry","permit":"registry","price":"press","developer":"registry"},"miss":null}}},"emaar-seapoint":{"set":{"cl":[["Project registered with DLD (project 2633, Active)","verified","registry","https://dubairealestateiq.com/project/seapoint"],["Escrow account (First Abu Dhabi Bank)","verified","registry","https://dubairealestateiq.com/project/seapoint"],["Construction at 36.78% (DLD inspection 24 Jun 2026)","verified","registry","https://dubairealestateiq.com/project/seapoint"],["Developer entity registered: Emaar Development P.J.S.C. (DLD developer 1211)","verified","registry","https://dubairealestateiq.com/project/seapoint"],["Developer track record: 199 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/emaar"],["Handover Q1 2028 [at 36.78% in Jun 2026, 63% remains for the 21 months to the registered date]","verified","registry","https://dubairealestateiq.com/project/seapoint"],["Starting price AED 3,480,000 (A1) [DLD registered sales median AED 5.1m, AED 4,463 per sq ft (20 sales)]","unverified","none","https://a1properties.ae/project-details/seapoint-residences-emaar-beachfront-dubai"],["Project marketed by Emaar [no Seapoint page in Emaar's property sitemap; DLD register names Emaar Development P.J.S.C.]","unverified","none","https://www.emaar.com/sitemap-properties-en.xml"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/seapoint-residences-emaar-beachfront-dubai"],["No guaranteed returns advertised","unverified","none","https://a1properties.ae/project-details/seapoint-residences-emaar-beachfront-dubai"],["DLD project register: project 2633, status Active, completion date on the register 31 Mar 2028, 36.78% built at the DLD inspection of 24 Jun 2026, escrow account bank First Abu Dhabi Bank, registered developer Emaar Development P.J.S.C. (DLD developer 1211) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/seapoint"]],"rvw":null}},"emaar-valia":{"set":{"cl":[["Project registered with DLD (project 4448, Active)","verified","registry","https://dubairealestateiq.com/project/valia"],["Escrow account (First Abu Dhabi Bank)","verified","registry","https://dubairealestateiq.com/project/valia"],["Construction at 0% (DLD inspection 6 Aug 2026)","verified","registry","https://dubairealestateiq.com/project/valia"],["Developer entity registered: Dubai Creek Harbour L.L.C (DLD developer 1224)","verified","registry","https://dubairealestateiq.com/project/valia"],["Developer track record: 199 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/emaar"],["Handover Q3 2030 (A1)","verified","registry","https://dubairealestateiq.com/project/valia"],["Starting price AED 1,800,000 (A1) versus AED 1,960,000 (Emaar) [DLD registered sales median AED 2.3m, AED 2,602 per sq ft (324 sales)]","contradicted","none","https://www.emaar.com/en/properties/valia-at-dubai-creek-harbour"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/valia-tower-dubai-creek-harbour"],["No guaranteed returns advertised","unverified","none","https://www.emaar.com/en/properties/valia-at-dubai-creek-harbour"],["DLD project register: project 4448, status Active, completion date on the register 31 Aug 2030, 0% built at the DLD inspection of 6 Aug 2026, escrow account bank First Abu Dhabi Bank, registered developer Dubai Creek Harbour L.L.C (DLD developer 1224) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/valia"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/valia"],"ho":["future","DLD register completion 31 Aug 2030; 0% built at the inspection of 6 Aug 2026","https://dubairealestateiq.com/project/valia"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/valia"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"url":"https://www.emaar.com/en/properties/valia-at-dubai-creek-harbour"}},"embassy-life-pattaya":{"set":{"rvw":null}},"empathia-village-kensington":{"set":{"rvw":null}},"emperium-2-venus-lux":{"set":{"rvw":null}},"ena-praia-do-estaleiro":{"set":{"rvw":null}},"enadia-seaview-collection":{"set":{"rvw":null}},"enchanted-garden-resort-phase-2-damai":{"set":{"rvw":null}},"enre-residence-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/imtiaz-developments/enre-residence"],["DLD project register: project 4336, status Active, completion date on the register 15 Aug 2028, 14.63% built at the DLD inspection of 28 Jul 2026, escrow account bank United Bank Limited (Management Office), registered developer Imtiaz South Real Estate Development L.L.C (DLD developer 2579) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/enre-residence-by-imtiaz"],["The developer page read on 13 Nov 2026 prints: \"construction progress 27 overall ESTIMATED COMPLETION DATE Q1 2028\"","unverified","none","https://imtiaz.ae/property/enre-residence-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 4336, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank United Bank Limited (Management Office) (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 28 Jul 2026: 14.63% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Imtiaz South Real Estate Development L.L.C (DLD developer 2579)","handover_promised":"2028-Q3"},"pn":"DLD project registration 4336","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/enre-residence-by-imtiaz"],"ho":["future","DLD register completion 15 Aug 2028; 14.63% built at the inspection of 28 Jul 2026; developer page: \"construction progress 27 overall ESTIMATED COMPLETION DATE Q1 2028\"","https://dubairealestateiq.com/project/enre-residence-by-imtiaz"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/enre-residence-by-imtiaz"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://imtiaz.ae/property/enre-residence-by-imtiaz","https://www.propertyfinder.ae/en/new-projects/imtiaz-developments/enre-residence","https://dubairealestateiq.com/project/enre-residence-by-imtiaz"],"st":"under construction"}},"ensoleilla-domaine-prive":{"set":{"rvw":null}},"erudita-m-rida":{"set":{"rvw":null}},"escape-brooklin":{"set":{"rvw":null}},"esentepe-sea-view-villas-terra-eck-3023":{"set":{"rvw":null}},"espacio-marina-golf-puerto-vallarta":{"set":{"rvw":null}},"essenza-santa-eulalia-unnamed-developer":{"set":{"rvw":null}},"estiva-charm-estiva-mailand-hanoi-city":{"set":{"rvw":null}},"estrela-75-lisbon":{"set":{"rvw":null}},"etherna-homes-ii-estepona-neinor":{"set":{"rvw":null}},"etro-residences-phuket-gardens-of-eden-phuket":{"set":{"rvw":null}},"ever-prime-residences-karon":{"set":{"rvw":null}},"evergreen-homes-costa-del-sol":{"set":{"rvw":null}},"evergreens-damac-hills-2":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q4, 2026\"","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/evergreens/"],["7-floor tower of 1 and 2-bedroom apartments in DAMAC Hills 2","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/evergreens/"],["DLD project register: project 3092, status Active, no completion date on the register, 26.43% built at the DLD inspection of 5 May 2026, escrow account bank Emirates Nbd Bank, registered developer Front Line Investment Management L.L.C (DLD developer 1021) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-hills-2-evergreens"]],"ev":{"permit":"Registered as DLD project 3092, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 5 May 2026: 26.43% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Front Line Investment Management L.L.C (DLD developer 1021)","handover_promised":"2026-Q4","unit_types":["1-bedroom apartment","2-bedroom apartment"]},"pn":"DLD project registration 3092","rvw":null,"src":["https://www.damacproperties.com/en/communities/damac-hills-2/projects/evergreens/","https://dubairealestateiq.com/project/damac-hills-2-evergreens"]}},"every-bali":{"set":{"rvw":null}},"evora-izmir-teknik-yapi-halk-gyo":{"set":{"rvw":null}},"exchange-square-seven-mills":{"set":{"rvw":null}},"expo-valley-expo-city-dubai":{"set":{"cl":[["Registered with DLD (project 2623)","verified","registry","https://dubairealestateiq.com/project/expo-city-valley"],["Escrow account at Dubai Islamic Bank","verified","registry","https://dxbpropy.ai/offplan/expo-valley-expo-city-b809"],["Handover Q1 2026 / residents moving in from early 2026","contradicted","registry","https://dubairealestateiq.com/project/expo-city-valley"],["Under construction (66% built 19 Aug 2026)","verified","registry","https://dubairealestateiq.com/project/expo-city-valley"],["Townhouses from AED 3.39m (registered 3BR median AED 4.3m)","verified","registry","https://dubairealestateiq.com/project/expo-city-valley"],["Developer has completed residential projects","contradicted","registry","https://dubairealestateiq.com/developer/expo-city-dubai"],["Project value AED 1.18bn per Land Department","unverified","none","https://propsearch.ae/dubai/expo-valley"],["60% of land given to green space","unverified","none","https://graf.ae/expo-city/expo-valley/"],["Unit count 489 (register) vs 532 estimated (Propsearch) vs 165 in phase 1 (agent)","verified","registry","https://dubairealestateiq.com/project/expo-city-valley"],["Freehold for foreigners","unverified","none","https://www.bayut.com/for-sale/off-plan/5-bedroom-townhouses/dubai/expo-city/expo-valley/"],["DLD project register: project 2623, status Active, completion date on the register 31 Jan 2026, 66% built at the DLD inspection of 19 Aug 2026, escrow account bank Dubai Islamic Bank, registered developer Expo City Valley Development Fzco (DLD developer 1571) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/expo-city-valley"]],"rvw":null}},"faena-residences-miami-miami-river":{"set":{"rvw":null}},"fahid-beach-residences":{"set":{"rvw":null}},"fairway-latitude-fairway-holdings":{"set":{"rvw":null}},"fashionz-by-danube-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/danube-properties/fashionz-by-danube"],["DLD project register: project 2640, status Active, no completion date on the register, 40% built at the DLD inspection of 10 Sep 2026, escrow account bank First Abu Dhabi Bank, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/fashionz-1-by-danube"]],"ev":{"permit":"Registered as DLD project 2640, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 10 Sep 2026: 40% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Danube Properties Development L.L.C (DLD developer 1009)"},"pn":"DLD project registration 2640","rvw":null,"src":["https://danubeproperties.com/portfolio/fashionz/","https://www.propertyfinder.ae/en/new-projects/danube-properties/fashionz-by-danube","https://dubairealestateiq.com/project/fashionz-1-by-danube"]}},"feel-palermo-argentina":{"set":{"rvw":null}},"fendi-chateau-residences-tower-3-chateau-group":{"set":{"rvw":null}},"fera-senna-phases-3-and-4":{"set":{"rvw":null}},"ferragudo-village-benoit-properties":{"set":{"rvw":null}},"ferreiros-residences-yard-properties":{"set":{"rvw":null}},"fifteen-fifteen-vancouver":{"set":{"rvw":null}},"filipinas-residence":{"set":{"rvw":null}},"fioresta-costa-blanca":{"set":{"rvw":null}},"firdus-prime-residence-yerevan":{"set":{"rvw":null}},"fix-residences-thessaloniki-dimand":{"set":{"rvw":null}},"florence-residences-homecorp":{"set":{"rvw":null}},"folkart-orion":{"set":{"rvw":null}},"forest-city-2-hz-development":{"set":{"cl":[["Registered with DLD (project 3727)","verified","registry","https://dubairealestateiq.com/project/forest-city-tower-2"],["Escrow at Emirates Islamic Bank","verified","registry","https://dubairealestateiq.com/project/forest-city-tower-2"],["Handover Q2 2027","contradicted","registry","https://dubairealestateiq.com/project/forest-city-tower-2"],["Construction under way","contradicted","registry","https://dubairealestateiq.com/project/forest-city-tower-2"],["Advertising permit valid","contradicted","none","https://alnair.ae/en/dubai/project/forest-city-2"],["Developer track record","unverified","none","https://hzdeveloper.ae/"],["Price from AED 720,888","unverified","none","https://alnair.ae/en/dubai/project/forest-city-2"],["DLD project register: project 3727, status Active, completion date on the register 1 Jun 2027, 0.02% built at the DLD inspection of 26 Jun 2026, escrow account bank Emirates Islamic Bank, registered developer Al Helal Al Zahaby Real Estate Development L.L.C (DLD developer 1124) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/forest-city-tower-2"]],"rvw":null}},"forest-city-johor":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"press","permit":"developer","developer":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: Malaysia KPKT TEDUH register"]}}},"forest-seaview-varna-forest-club":{"set":{"rvw":null}},"forma-east-tower-of-the-mirvish-gehry-complex-toronto":{"set":{"rvw":null}},"fortis-residences-makati":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not checked","official register for Philippines not looked up on the review date","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://www.dmcihomes.com/fortis-residences"],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"press"},"miss":["official register not looked up: official register for Philippines not looked up on the review date"]}}},"fortune-bay-residences-topero":{"set":{"cl":[["Project registered on RAK RERA off-plan list under TOPERO Properties LLC","verified","registry","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list"],["Construction started 17 Dec 2024","unverified","none","https://www.propertyfinder.ae/en/new-projects/topero-properties/fortune-bay-residences"],["Completion December 2026","unverified","none","https://everhomes.ae/off-plan/fortune-bay-residences"],["Payment plan 5/45/50","contradicted","none","https://everhomes.ae/off-plan/fortune-bay-residences"],["Prices from AED 2.5M","unverified","none","https://www.propertyfinder.ae/en/new-projects/topero-properties/fortune-bay-residences"],["Launch price averages AED 1.70M","contradicted","none","https://metropolitan.realestate/al-marjan-island/fortune-bay-residences"],["180 units","unverified","none","https://metropolitan.realestate/al-marjan-island/fortune-bay-residences"],["Developer has a reputation for quality","unverified","none","https://www.propertyfinder.ae/en/new-projects/topero-properties/fortune-bay-residences"],["Deposits held in escrow","unverified","none","https://www.propertyfinder.ae/en/new-projects/topero-properties/fortune-bay-residences"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Fortune Bay Residences\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"rvw":null,"src":["https://everhomes.ae/off-plan/fortune-bay-residences","https://metropolitan.realestate/al-marjan-island/fortune-bay-residences","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list","https://www.propertyfinder.ae/en/new-projects/topero-properties/fortune-bay-residences","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"four-seasons-life-iii":{"set":{"rvw":null}},"four-seasons-nevis-peak-residences-integrum":{"set":{"rvw":null}},"four-seasons-private-residences-cartagena":{"set":{"rvw":null}},"four-seasons-private-residences-caye-chapel":{"set":{"rvw":null}},"four-seasons-private-residences-charleston":{"set":{"rvw":null}},"four-seasons-private-residences-coconut-grove":{"set":{"rvw":null}},"four-seasons-private-residences-deer-valley":{"set":{"rvw":null}},"four-seasons-private-residences-dominican-republic-at-tropicalia":{"set":{"rvw":null}},"four-seasons-private-residences-jacksonville":{"set":{"rvw":null}},"four-seasons-private-residences-jeddah-midad":{"set":{"rvw":null}},"four-seasons-private-residences-lake-austin":{"set":{"rvw":null}},"four-seasons-private-residences-las-vegas-azure":{"set":{"rvw":null}},"four-seasons-private-residences-okinawa-berjaya":{"set":{"rvw":null}},"four-seasons-private-residences-shura-island-red-sea-global":{"set":{"rvw":null}},"four-seasons-private-residences-telluride":{"set":{"rvw":null}},"four-seasons-private-residences-washington-dc":{"set":{"rvw":null}},"fox-and-foundry-liverpool-nexus-residential":{"set":{"rvw":null}},"frida-kahlo-wynwood-residences":{"set":{"rvw":null}},"fumba-horizon":{"set":{"rvw":null}},"funchal-new-development-portugalproperty-180568":{"set":{"rvw":null}},"g-ntherstra-e-3-no-published-project-name-berlin":{"set":{"rvw":null}},"gaia-residence-amman":{"set":{"rvw":null}},"gaia-residences-hollywood-alta":{"set":{"rvw":null}},"garden-of-happiness-taiwan":{"set":{"rvw":null}},"garden-park-home-club":{"set":{"rvw":null}},"gardenia-bay-aldar":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2027-Q2) was not re-checked.","https://www.aldar.com/properties/en/gardeniabay"],"co":null,"sq":{"handover":"press","permit":"portal","developer":"portal"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"gartenstadt-karlshorst":{"set":{"rvw":null}},"gato-tower-miraku":{"set":{"rvw":null}},"gemini-westlands":{"set":{"rvw":null}},"ghyra-ecuador":{"set":{"rvw":null}},"gianfranco-ferre-residences-mira":{"set":{"cl":[["Project registered with RAK RERA (Mira Developments LLC), In progress","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["Handover Q1 2028","unverified","none","https://miradevelopments.ae/projects/gianfranco-ferre-residences"],["160 units (Property Finder)","contradicted","none","https://miradevelopments.ae/articles/mira-developments-and-gianfranco-ferre-home-announce-a-new-collection-of-luxury-waterfront-apartments"],["Starting price AED 1.2M (Property Finder) vs AED 1.6M (developer)","contradicted","none","https://miradevelopments.ae/projects/gianfranco-ferre-residences"],["Payment plan 10/50/40 (Property Finder) vs 50/50 post-handover (developer)","contradicted","none","https://gianfrancoferre-residences.com/"],["Construction started 9 Mar 2025","unverified","none","https://www.propertyfinder.ae/en/new-projects/mira-developments/gianfranco-ferre-residences"],["Construction is complete (Madena)","contradicted","none","https://www.madena.ae/projects/gianfranco-ferre-residences"],["Developer delivers branded turnkey homes","unverified","none","https://gianfrancoferre-residences.com/"],["Escrow account","unverified","none","https://miradevelopments.ae/projects/gianfranco-ferre-residences"],["Freehold title","unverified","none","https://www.propertyfinder.ae/en/new-projects/mira-developments/gianfranco-ferre-residences"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Gianfranco Ferre Residences\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"rvw":null}},"gladia-heights-khang-dien-keppel":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Vietnam","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2027-Q4 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"press"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"godrej-trilogy-seaturf-and-seafront-towers-mumbai":{"set":{"rvw":null}},"golf-dale-emaar":{"set":{"cl":[["Project registered with DLD (no. 3427) on 11 Dec 2024","verified","registry","https://www.homesearch.ae/for-sale/off-plan/emaar/golf-dale-3427"],["Escrow 11134281920033 at Abu Dhabi Commercial Bank","verified","registry","https://www.homesearch.ae/for-sale/off-plan/emaar/golf-dale-3427"],["200 units in three buildings","verified","registry","https://www.homesearch.ae/for-sale/off-plan/emaar/golf-dale-3427"],["Construction started 23 May 2025","contradicted","registry","https://www.homesearch.ae/for-sale/off-plan/emaar/golf-dale-3427"],["Completion 31 Dec 2028 (Q4 2028)","unverified","none","https://jre.ae/projects/golf-dale"],["Prices from AED 2.70M (current inventory)","unverified","none","https://jre.ae/projects/golf-dale"],["Units have sold on the register from AED 1.15M","verified","registry","https://www.homesearch.ae/for-sale/off-plan/emaar/golf-dale-3427"],["Emaar Development delivered more than 80,500 units since 2002","verified","independent","https://www.khaleejtimes.com/business/property/emaar-posts-strongest-ever-results-as-revenues-climb-44"],["Freehold for foreign buyers in Emaar South","unverified","none","https://jre.ae/projects/golf-dale"],["DLD project register: project 3427, status Active, completion date on the register 31 Dec 2028, 0.27% built at the DLD inspection of 30 Apr 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Emaar Dubai South Dwc Llc (DLD developer 1155) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/golf-dale"]],"rvw":null}},"golf-gate-2-damac-hills":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q4, 2026\"","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-community/projects/golf-gate-2/"],["1 and 2-bedroom apartments in DAMAC Hills, next to the golf course and a 30,000 sq ft clubhouse","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-community/projects/golf-gate-2/"],["DLD project register: project 2698, status Active, no completion date on the register, 80.35% built at the DLD inspection of 20 Jul 2026, escrow account bank Dubai Islamic Bank, registered developer Damac Crescent Properties (DLD developer 954) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-hills-golf-gate-2"]],"ev":{"permit":"Registered as DLD project 2698, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 20 Jul 2026: 80.35% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Damac Crescent Properties (DLD developer 954)","handover_promised":"2026-Q4","unit_types":["1-bedroom apartment","2-bedroom apartment"]},"pn":"DLD project registration 2698","rvw":null,"src":["https://www.damacproperties.com/en/communities/damac-hills-community/projects/golf-gate-2/","https://dubairealestateiq.com/project/damac-hills-golf-gate-2"]}},"golf-greens-damac-hills":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q1, 2027\"","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-community/projects/golf-greens/"],["1 and 2-bedroom apartments and 2 and 3-bedroom townhouses with views of the fairways at DAMAC Hills","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-community/projects/golf-greens/"],["DLD project register: project 2779, status Active, completion date on the register 30 Mar 2027, 40.52% built at the DLD inspection of 8 Sep 2026, escrow account bank Dubai Islamic Bank, registered developer Damac Crescent Properties (DLD developer 954) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-hills-golf-greens-1"]],"ev":{"permit":"Registered as DLD project 2779, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 8 Sep 2026: 40.52% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Damac Crescent Properties (DLD developer 954)","handover_promised":"2027-Q1","unit_types":["1-bedroom apartment","2-bedroom apartment","2-bedroom townhouse","3-bedroom townhouse"]},"pn":"DLD project registration 2779","rvw":null,"src":["https://www.damacproperties.com/en/communities/damac-hills-community/projects/golf-greens/","https://dubairealestateiq.com/project/damac-hills-golf-greens-1"]}},"grand-green-osaka-the-south-residence":{"set":{"rvw":null}},"grand-lane-new-cairo":{"set":{"rvw":null}},"grand-park-living-grand-invest-varna":{"set":{"rvw":null}},"grand-polo-club-resort-dubai":{"set":{"rvw":null}},"grand-solaire-pattaya":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 14910, approval ทส 1010.5/17038)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2026-Q4; developer page read on 13 Nov 2026: \"y, paid yearly) Title Deed Transfer Fee: Shared equally between Buyer and Seller Expected completion end 2026 Foreign Ownership 100,000 booking 25% a\"","https://www.grandsolaire.com/"],"co":null,"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null}}},"green-tower-hotel-residences-umag":{"set":{"rvw":null}},"green-village-loyo-bondar-nusa-dua-not-the-ibuku-bamboo-gree":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record Q3 2028; developer page read on 13 Nov 2026: \"7 + 25 years Land category: Pink Zone, safe and legal for building apartments and villas Handover: Q4 2028 Prices start from 110,000 USD Total lan\"","https://bali-development.com/green-village/"],"co":null,"sq":{"handover":"press","price":"press","developer":"press"},"miss":null}}},"greenway-apartments-budapest":{"set":{"rvw":null}},"greenz-by-danube-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/danube-properties/greenz-by-danube"],["DLD project register: project 4430, status Active, completion date on the register 31 Dec 2029, 0% built at the DLD inspection of 27 Mar 2026, escrow account bank Commercial Bank Of Dubai(Psc), registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/greenz-by-danube"]],"ev":{"permit":"Registered as DLD project 4430, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Commercial Bank Of Dubai(Psc) (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 27 Mar 2026: 0% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Danube Properties Development L.L.C (DLD developer 1009)","handover_promised":"2029-Q4"},"pn":"DLD project registration 4430","rvw":null,"src":["https://danubeproperties.com/portfolio/greenz/","https://www.khaleejtimes.com/kt-network/danube-properties-unveils-dh35m-greenz-master-community-in-dubais-high-growth-academic-city","https://www.propertyfinder.ae/en/new-projects/danube-properties/greenz-by-danube","https://www.zawya.com/en/projects/construction/danube-launches-its-first-townhouse-and-villa-master-community-in-dubai-yb0pxj8x","https://dubairealestateiq.com/project/greenz-by-danube"]}},"guayacan-santa-maria-valor-udg":{"set":{"rvw":null}},"gyeonghuigung-effite-donuimun-district-2-redevelopment-seoul":{"set":{"rvw":null}},"habitat-italica":{"set":{"rvw":null}},"habitat-jardines-de-lemos":{"set":{"rvw":null}},"habitat-nuevo-san-lucas":{"set":{"rvw":null}},"habitat-torremare":{"set":{"rvw":null}},"habitat-vibe-the-habitat-lombok":{"set":{"rvw":null}},"hacienda-ras-el-hekma":{"set":{"rvw":null}},"hanacreek-niseko-apex-property":{"set":{"rvw":null}},"haraya-residences-shang-robinsons":{"set":{"rvw":null}},"harbor-171-torre-norte":{"set":{"rvw":null}},"harbour-lights-de-grisogono":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q2, 2027\"","unverified","none","https://www.damacproperties.com/en/projects/harbour-lights-de-grisogono-geneve/"],["52-storey waterfront tower branded by de GRISOGONO; the page does not name the district","unverified","none","https://www.damacproperties.com/en/projects/harbour-lights-de-grisogono-geneve/"],["DLD project register: project 2516, status Active, completion date on the register 21 May 2027, 64.31% built at the DLD inspection of 9 Jul 2026, escrow account bank Dubai Islamic Bank, registered developer Damac J W F Investment L.L.C (DLD developer 1475) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/harbour-lights"]],"ev":{"permit":"Registered as DLD project 2516, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 9 Jul 2026: 64.31% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Damac J W F Investment L.L.C (DLD developer 1475)","handover_promised":"2027-Q2","unit_types":["apartment"]},"pn":"DLD project registration 2516","rvw":null,"src":["https://www.damacproperties.com/en/projects/harbour-lights-de-grisogono-geneve/","https://dubairealestateiq.com/project/harbour-lights"]}},"harbourside-residences-mirvac":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not checked","official register for Sydney not looked up on the review date","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://harbourside.mirvac.com"],"co":null,"sq":{"handover":"developer","permit":"press","developer":"press"},"miss":["official register not looked up: official register for Sydney not looked up on the review date"]}}},"harbourwalk-at-lakeview-village":{"set":{"rvw":null}},"harlin-vancouver":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not checked","official register for Vancouver not looked up on the review date","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028 (portal estimate)) comes from the sources listed on the page.","https://wesgroup.ca/harlin/"],"co":null,"sq":{"handover":"press"},"miss":["official register not looked up: official register for Vancouver not looked up on the review date"]}}},"harmonie-golf-beach-estate-semaris":{"set":{"cl":[["Approved PDS by the EDB","unverified","none","https://edbmauritius.org/wp-content/uploads/2022/10/List-of-Approved-PDS-Projects.pdf"],["Construction to start early 2023, completion within three years","contradicted","independent","https://www.semaris.mu/media/fqxktsi4/semaris-agm-dec25.pdf"],["First villas delivered in first semester 2026 vs last semester 2026 (same AGM deck)","contradicted","independent","https://www.semaris.mu/media/fqxktsi4/semaris-agm-dec25.pdf"],["Over Rs 3bn of sales secured or reserved (30 Nov 2025)","verified","independent","https://www.semaris.mu/media/fqxktsi4/semaris-agm-dec25.pdf"],["First 12 VEFA deeds of sale and 19 CRPs signed (Rs 1.9bn)","verified","independent","https://www.semaris.mu/media/fqxktsi4/semaris-agm-dec25.pdf"],["Phase 1 infrastructure completed and EDB completion clearance delivered","verified","independent","https://www.semaris.mu/media/fqxktsi4/semaris-agm-dec25.pdf"],["Villas from EUR 1,950,000","contradicted","none","https://www.beachcomber-hotels.com/en/harmonie-golf-beach-estate"],["Semaris delivered villas at Domaine Palm Marrakech","verified","independent","https://www.semaris.mu/media/fqxktsi4/semaris-agm-dec25.pdf"],["Semaris listed on the SEM Development & Enterprise Market","verified","independent","http://www.semaris.mu/en/mauritius/harmonie-golf-beach-estate/"],["Golf course delivered in 2027","unverified","none","https://www.harmonie.mu/en"],["The developer page read on 13 Nov 2026 prints: \"Delivery of first villas in 2026 and golf course in 2027\"","unverified","none","https://www.harmonie.mu/en"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mauritius","https://kolaboro.com/registers/"],"ho":["future","Developer says first villas are delivered in 2026; the year has not ended.","https://www.harmonie.mu/en"],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"developer"},"miss":null}}},"harmony-ocean-front-ja-russi":{"set":{"rvw":null}},"harmony-on-broadbeach-gold-partners-australia":{"set":{"rvw":null}},"harrington-place-mullae-seoul":{"set":{"rvw":null}},"havannah-haven-estates-port-havannah-marina-goodies":{"set":{"rvw":null}},"hayat-4-dubai-south":{"set":{"cl":[["Registered on the DLD project register as project no. 4038 on 10 Sep 2025","verified","registry","https://dubairealestateiq.com/project/hayat-4"],["Escrow account held at Emirates NBD","verified","registry","https://dubairealestateiq.com/project/hayat-4"],["Construction stage: 4.52% built at DLD inspection on 24 Sep 2026","verified","registry","https://dubairealestateiq.com/project/hayat-4"],["Developer entity Dubai South Properties Dwc Llc registered with DLD (developer no. 1142)","verified","registry","https://dubairealestateiq.com/project/hayat-4"],["Project has 200 units on the register","verified","registry","https://dubairealestateiq.com/project/hayat-4"],["Developer group track record on DLD: 13 finished projects (32 total, 17 active)","verified","registry","https://dubairealestateiq.com/developer/dubai-south"],["Completion July 2028","verified","registry","https://dubairealestateiq.com/project/hayat-4"],["200 homes in Phase 4","verified","registry","https://dubairealestateiq.com/project/hayat-4"],["Hayat community of about 2,500 units","unverified","none","https://www.dubaisouth.ae/en/newsroom/dubai-south-achieves-over-aed-12-billion-in-sales-for-hayat-within-hours-of-its-launch"],["Launch price from AED 4.6M","unverified","none","https://www.propertyfinder.ae/en/new-projects/dubai-south/hayat-phase-4"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/dubai-south/hayat-phase-4"],["DLD project register: project 4038, status Active, completion date on the register 31 Jul 2028, 4.52% built at the DLD inspection of 24 Sep 2026, escrow account bank Emirates Nbd Bank, registered developer Dubai South Properties Dwc Llc (DLD developer 1142) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/hayat-4"]],"rvw":null,"st":"under construction"}},"hayat-flora-kucukcekmece":{"set":{"cl":[["Building permits issued for the blocks","verified","independent","https://kap.org.tr/tr/api/file/download/4028328d9e2771a0019e8337038663f4"],["Land owned by Emlak Konut GYO (revenue-sharing model)","verified","independent","https://kap.org.tr/tr/api/file/download/4028328d9e2771a0019e8337038663f4"],["1,382 homes and 46 commercial units","verified","independent","https://www.emlakkonut.com.tr/tr-TR/hayat-flora"],["Construction about 10% complete (May 2026)","verified","independent","https://kap.org.tr/tr/api/file/download/4028328d9e2771a0019e8337038663f4"],["Construction 40% complete (portal)","contradicted","independent","https://www.emlakplatform.com.tr/tr/projects/hayat-flora"],["Planned delivery February 2029","verified","independent","https://www.ozakgyo.com/upi/files/2025/11/1763707434_4218.pdf"],["Delivery March 2027 (portals emlakjet, emlakplatform)","contradicted","independent","https://www.emlakjet.com/projeler/proje/hayat-flora"],["Prices from USD 264,000 (June 2026 list)","unverified","none","https://www.icanbuyinturkey.com/tr/projects/kucukcekmece/hayat-flora"],["Payment 50% down + 24 months","unverified","none","https://interestingrealestate.com/listings/hayat-flora"],["Expected rental yield 6% and state guarantee (portal)","unverified","none","https://www.emlakplatform.com.tr/tr/projects/hayat-flora"],["Developer Özak GYO is a listed REIT with completed projects","verified","independent","https://www.ozakgyo.com/upi/files/2025/11/1763707434_4218.pdf"],["Occupancy permit (iskan) obtained","contradicted","independent","https://kap.org.tr/tr/api/file/download/4028328d9e2771a0019e8337038663f4"],["Buyer deposits protected by escrow","unverified","none","https://www.ozakgyo.com/en/project/hayat-flora"],["The developer page read on 13 Nov 2026 prints: \"the planned delivery date of the project is February 2029\"","unverified","none","https://www.ozakgyo.com/en/project/hayat-flora"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Turkey","https://kolaboro.com/registers/"],"ho":["future","developer page: \"the planned delivery date of the project is February 2029\"","https://www.ozakgyo.com/en/project/hayat-flora"],"co":null,"sq":{"handover":"registry","permit":"registry","price":"press","developer":"developer"},"miss":null}}},"hayyan-alef-group":{"set":{"rvw":null}},"hazel-at-sodic-east":{"set":{"rvw":null}},"heap-s-mill":{"set":{"rvw":null}},"heritage-100-tower-2-residences-accra":{"set":{"rvw":null}},"hidden-city-ubud-phase-2-apartments":{"set":{"rvw":null}},"hideaways-los-cabos-black-development":{"set":{"rvw":null}},"hilton-residences-abu-dhabi-al-raha-emirates-developments":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2028-Q4) was not re-checked.",null],"co":null,"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"honest-signature-7-the-developer-also-calls-it-prestige-2-ma":{"set":{"rvw":null}},"horizon-14-also-listed-as-terra-horizon-14-goa":{"set":{"rvw":null}},"horizon-towers-larnaca-slk":{"set":{"rvw":null}},"hoshinoya-hutte-niseko-tokyu-land":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Japan","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2029-Q1) comes from the sources listed on the page.","https://hoshinoresorts.com/en/aboutus/developments/"],"co":null,"sq":{"handover":"press"},"miss":null}}},"hotel-ora-private-residences-tampa-arc":{"set":{"rvw":null}},"hotel101-niseko-hotel101-global":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Japan","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2026-Q4 not re-checked on the review date",null],"co":null,"sq":{"permit":"developer","price":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"hq-cas-en-bas-wellington-estates":{"set":{"rvw":null}},"hunab-ku-sanctuary-tulum":{"set":{"rvw":null}},"hush-villas-koh-phangan":{"set":{"rvw":null}},"hyde-metropolitan-deicorp":{"set":{"rvw":null}},"hypnose-quartier-des-hirondelles":{"set":{"rvw":null}},"hythe-by-botanica":{"set":{"cl":[["Developer project-progress block (updated 5 Sep 2026): EIA approved, construction permit, overall progress 43.8%, structure works 98.6%, expected completion printed as \"20270430\" (30 Apr 2027)","verified","developer","https://www.botanicaluxuryvilla.com/projects/hythe-by-botanica/"],["EIA approved","verified","registry","https://eia.onep.go.th/eia/detail?id=14604"],["Construction under way","verified","registry","https://eia.onep.go.th/eia/detail?id=14604"],["Located in Cherngtalay, Thalang","verified","registry","https://eia.onep.go.th/eia/detail?id=14604"],["Project details unchanged since approval","unverified","registry","https://eia.onep.go.th/eia/detail?id=16315"],["43.8% complete (Sep 2026)","unverified","none","https://www.botanicaluxuryvilla.com/our-construction-updates/"],["Completion Q4 2026","unverified","none","https://kellerhenson.com/project/botanica-hythe"],["276 units in 4 buildings","unverified","none","https://botanicaluxury.com/"],["Freehold available to eligible foreign buyers","unverified","none","https://www.botanicaluxuryvilla.com/projects/hythe-by-botanica/"],["Developer has 20 years experience and 15+ villa projects","unverified","none","https://botanicaluxury.com/"],["Prices from 10.8M THB","unverified","none","https://www.botanicaluxuryvilla.com/projects/hythe-by-botanica/"]],"fx":{"developer_hq":"Thepkrasattri, Thalang, Phuket, Thailand","handover_promised":"2027-04-30","original_handover":"2026-Q4","unit_types":["1BR","2BR","3BR","duplex","penthouse"],"size_min_m2":55.99,"size_max_m2":702.0,"price_min":10800000.0,"price_max":165000000.0,"currency":"THB","payment_plan":"Interest-free installments during construction (developer Russian site)","foreign_ownership":"Freehold condominium unit in the foreign quota, or 30-year leasehold","permit_authority":"ONEP Expert Review Committee (EIA); Cherngtalay local authority (building permit)","brand":"Botanica"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256801-51, approval ทส 1009.5/11069)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["changed","changed (the developer page read on 13 Nov 2026 prints 30 Apr 2027; the date on record was Q4 2026)","https://www.botanicaluxuryvilla.com/projects/hythe-by-botanica/"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"developer"},"miss":null}}},"i-kov-3-0-prague":{"set":{"rvw":null}},"ice-beach-major-developments":{"set":{"rvw":null}},"iconic-tower-fg-balneario-camboriu":{"set":{"rvw":null}},"iconica-gold-coast":{"set":{"rvw":null}},"idra-cape-verde":{"set":{"rvw":null}},"ika-mare-constructora-ika":{"set":{"rvw":null}},"ilima-ward-village":{"set":{"rvw":null}},"imperia-sensa-park":{"set":{"rvw":null}},"imperial-exchange-liverpool-seth-real-estate":{"set":{"rvw":null}},"imperio-skyline-imperio-properties":{"set":{"rvw":null}},"incontro-subiaco-cedar-woods":{"set":{"rvw":null}},"indari-by-balix":{"set":{"rvw":null}},"indu-oceanfront-residences-cayman-islands":{"set":{"rvw":null}},"infinity-by-the-sea":{"set":{"rvw":null}},"infinity-hills-stone-town-infinity-developments":{"set":{"rvw":null}},"infinity-paguera-taylor-wimpey":{"set":{"cl":[["Payments guaranteed by bank guarantee or insurance policy","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["Phase 1 handover November 2028","unverified","none","https://taylorwimpeyspain.com/property/infinity-paguera-mallorca/"],["Building licence granted","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["Plot is cadastral reference 07011A00500446, Calvià","unverified","none","https://taylorwimpeyspain.com/wp-content/uploads/2025/10/Infinity-Paguera-0001_Certificado-de-eficiencia-energetica.pdf"],["79 apartments in five buildings, EUR 64M investment","unverified","none","https://taylorwimpeyspain.com/es/taylor-wimpey-espana-lanza-una-promocion-de-79-viviendas-en-mallorca/"],["Energy rating A","unverified","none","https://taylorwimpeyspain.com/wp-content/uploads/2025/10/Infinity-Paguera-0001_Certificado-de-eficiencia-energetica.pdf"],["Prices from EUR 900,000 plus VAT","unverified","none","https://taylorwimpeyspain.com/property/infinity-paguera-mallorca/"],["The developer page read on 13 Nov 2026 prints: \"Handover completion: Phase 1 - November 2028\"","unverified","none","https://taylorwimpeyspain.com/property/infinity-paguera-mallorca/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Handover completion: Phase 1 - November 2028\"","https://taylorwimpeyspain.com/property/infinity-paguera-mallorca/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"ingram-street-merchant-city-glasgow-artisan":{"set":{"rvw":null}},"ins-lita-m-rida":{"set":{"rvw":null}},"inspire-uptown":{"set":{"rvw":null}},"intercontinental-grenada-la-sagesse-range-developments":{"set":{"rvw":null}},"intercontinental-residences-bangkok-asoke-cg-capital":{"set":{"rvw":null}},"iskele-kalecik-complex-terra-eck-4116":{"set":{"rvw":null}},"island-breeze-heritage-holdings":{"set":{"rvw":null}},"island-heights-al-marjan":{"set":{"cl":[["Project registered with RAK RERA for off-plan sale","verified","registry","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list"],["Registered developer entity is Range 5 FZ-LLC","verified","registry","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list"],["165 units (78 studios, 87 1BR)","verified","independent","https://www.arabianbusiness.com/industries/real-estate/range-developments-unveils-island-heights-on-al-marjan-island"],["Building permit issued by RAK Municipality","unverified","none","https://rangerak.ae/construction-updates-the-island-heights/"],["Piling completed, main contractor signed (Q3 2026)","unverified","none","https://www.rangedevelopmentsgroup.com/construction-updates"],["Delivery January 2028","unverified","none","https://propertyfinder.ae/en/new-projects/range-developments/island-heights"],["Construction started 2 Apr 2025 (portal)","contradicted","none","https://rangerak.ae/construction-updates-the-island-heights/"],["Starting price AED 1.2M vs about AED 985,000 for studios on the same portal","contradicted","none","https://propertyfinder.ae/en/new-projects/range-developments/island-heights"],["Escrow account","unverified","none","https://www.rangedevelopmentsgroup.com/the-island-heights"],["Developer opened Park Hyatt St Kitts in 2017","unverified","none","https://www.rangedevelopmentsgroup.com/"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Island Heights Al Marjan Island\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["The developer page read on 13 Nov 2026 prints: \"Building Permit Issued from RAK Municipality\"","unverified","none","https://www.rangedevelopmentsgroup.com/the-island-heights"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["listed","RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"ho":["none","The developer construction update (Q4 2026) states the building permit was issued by RAK Municipality and piling is complete; it prints no handover date.","https://www.rangedevelopmentsgroup.com/the-island-heights"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"portal","developer":"registry"},"miss":null},"src":["https://propertyfinder.ae/en/new-projects/range-developments/island-heights","https://rangerak.ae/construction-updates-the-island-heights/","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list","https://www.arabianbusiness.com/industries/real-estate/range-developments-unveils-island-heights-on-al-marjan-island","https://www.rangedevelopmentsgroup.com/","https://www.rangedevelopmentsgroup.com/construction-updates","https://www.rangedevelopmentsgroup.com/the-island-heights","https://www.zawya.com/en/press-release/companies-news/range-developments-unveils-island-heights-in-al-marjan-island-dj96qjkl","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"url":"https://www.rangedevelopmentsgroup.com/the-island-heights"}},"isle-waterfront-newstead":{"set":{"rvw":null}},"itzae-tulum":{"set":{"rvw":null}},"j-adore-negombo":{"set":{"cl":[["Developer page: payment plan of 35% down payment, two 15% payments in months 6 and 12, 1% monthly until July 2028, 19% on handover","verified","developer","https://www.primelands.lk/apartment/J-ADORE-NEGOMBO/en"],["Developer page states an anticipated rental yield over 11% and an anticipated 80% ROI (projections, no guarantee wording)","unverified","none","https://www.primelands.lk/apartment/J-ADORE-NEGOMBO/en"],["Developer page states 100% of piling completed and superstructure construction scheduled to start early 2025 (no later progress figure on the page when read on 13 Nov 2026)","unverified","developer","https://www.primelands.lk/apartment/J-ADORE-NEGOMBO/en"],["Status label on the page: \"ONGOING\"; the page says 100% of piling work is complete and superstructure construction was scheduled to commence early 2025","unverified","none","https://www.primelands.lk/apartment/J-ADORE-NEGOMBO/en"],["25-story White and Emerald Towers with 333 apartments on 229.2 perches of beachfront land; 1 and 2-bedroom units and nine 3-bedroom White Presidential Suites","unverified","none","https://www.primelands.lk/apartment/J-ADORE-NEGOMBO/en"],["Price shown on the page: LKR 52,000,000; payment plan: two 15% bullet payments in months 6 and 12, 1% monthly till July 2028, 19% at handover","unverified","none","https://www.primelands.lk/apartment/J-ADORE-NEGOMBO/en"],["The page states an \"anticipated rental yield over 11%\" and an \"anticipated 80% ROI\"","unverified","none","https://www.primelands.lk/apartment/J-ADORE-NEGOMBO/en"],["Pin: coordinates of the project marker in the map embedded on the developer page (\"J'Adore Negombo by Prime Residencies\"); the address is the one published by the developer","unverified","none","https://www.primelands.lk/apartment/J-ADORE-NEGOMBO/en"]],"ev":{"plans":"Developer page has a Floor Plans section and brochure (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Sri Lanka","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"j-gran-tower-kyoto-mukomachi":{"set":{"rvw":null}},"j-hills":{"set":{"rvw":null}},"j-tower-3-phnom-penh-tanichu-assetment":{"set":{"rvw":null}},"jack-s-bay-club-resort-the-playground-residences-bahamas":{"set":{"rvw":null}},"jacob-co-beachfront-living-ohana":{"set":{"rvw":null}},"janu-residences-al-marjan":{"set":{"cl":[["Project registered with RAK RERA for off-plan sale","verified","registry","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list"],["Developer is Amana Development","contradicted","independent","https://www.forbesmiddleeast.com/lifestyle/travel-hospitality/aman-groups-janu-unveils-73-branded-residences-on-al-marjan-island-expanding-uae-presence"],["73 residences and 5 Marina Villas","verified","independent","https://www.forbesmiddleeast.com/lifestyle/travel-hospitality/aman-groups-janu-unveils-73-branded-residences-on-al-marjan-island-expanding-uae-presence"],["Construction began July 2026","verified","independent","https://www.forbesmiddleeast.com/lifestyle/travel-hospitality/aman-groups-janu-unveils-73-branded-residences-on-al-marjan-island-expanding-uae-presence"],["Construction started 8 Mar 2026 (portal)","contradicted","independent","https://www.propertyfinder.ae/en/new-projects/amana-development/janu-residences"],["Hotel opening late 2028","unverified","independent","https://gulfnews.com/business/property/wynn-al-marjan-island-announces-new-luxury-janu-resort-in-ras-al-khaimah-1.500340200"],["Delivery December 2028","unverified","none","https://www.propertyfinder.ae/en/new-projects/amana-development/janu-residences"],["Launch price AED 8.5M","unverified","none","https://www.propertyfinder.ae/en/new-projects/amana-development/janu-residences"],["Developer reputation for 'timely delivery'","unverified","none","https://www.propertyfinder.ae/en/new-projects/amana-development/janu-residences"],["Residences fully furnished by Aman Interiors","unverified","none","https://www.janu.com/janu-al-marjan-island/residences/"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Janu Hotel and Branded Residences\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"rvw":null,"src":["https://gulfnews.com/business/property/wynn-al-marjan-island-announces-new-luxury-janu-resort-in-ras-al-khaimah-1.500340200","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list","https://www.forbesmiddleeast.com/lifestyle/travel-hospitality/aman-groups-janu-unveils-73-branded-residences-on-al-marjan-island-expanding-uae-presence","https://www.hoteliermiddleeast.com/business/wynn-to-operate-aman-groups-janu-al-marjan-island-in-ras-al-khaimah","https://www.janu.com/janu-al-marjan-island/","https://www.janu.com/janu-al-marjan-island/residences/","https://www.propertyfinder.ae/en/new-projects/amana-development/janu-residences","https://www.zawya.com/en/press-release/companies-news/aman-group-announces-second-janu-property-in-uae-janu-al-marjan-island-cmrdttde","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"jardins-du-large":{"set":{"rvw":null}},"jem-private-residences":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not found","Florida DBPR condominium filings (developer summary, searched by name and address)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["not checked","date on record Q4 2027 not re-checked on the review date",null],"co":null,"sq":{"handover":"portal","price":"portal"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","not found on the official register: Florida DBPR condominium filings (developer summary, searched by name and address)","handover status not resolved"]}}},"jenna-aljada-sharjah":{"set":{"rvw":null}},"jesselton-courtyard":{"set":{"rvw":null}},"jimbaran-cliffside-reserve-aterra":{"set":{"rvw":null}},"jirian-palm-hills":{"set":{"rvw":null}},"june-egypt":{"set":{"cl":[["Delivery dates published per phase: Aqua Lagoons \"Q3 2030\", Water Chalets \"Q3 2029\"","unverified","none","https://www.sodic.com/our-developments/june"],["Chalets of 101 to 237 m2; the page also mentions villas","unverified","none","https://www.sodic.com/our-developments/june"],["Price from EGP 25,204,000; Aqua Lagoons starting price EGP 30,049,000","unverified","none","https://www.sodic.com/our-developments/june"],["Construction section reports ongoing works in several parcels","unverified","none","https://www.sodic.com/our-developments/june"],["The developer page read on 13 Nov 2026 prints: \"Delivery Date Q3 2030\"","unverified","none","https://www.sodic.com/our-developments/june"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Egypt","https://kolaboro.com/registers/"],"ho":["future","The page also shows \"Delivery Q3 2029\" for another phase of June.","https://www.sodic.com/our-developments/june"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"kabisu-sumba-villas":{"set":{"rvw":null}},"kai-diani-innova-properties":{"set":{"rvw":null}},"kalae-ward-village-howard-hughes":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","official register for Hawaii not looked up on the review date","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2028 not re-checked on the review date",null],"co":null,"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: official register for Hawaii not looked up on the review date","handover status not resolved"]}}},"kalea-heights":{"set":{"rvw":null}},"kaliwatu-residences-dusit-labuan-bajo":{"set":{"rvw":null}},"kaluna-berawa-signature":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"kaluna-tumbak-signature":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"kaluna-umalas-reserve":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"developer"},"miss":null}}},"kaolin-france":{"set":{"rvw":null}},"karl-lagerfeld-villas-taraf":{"set":{"cl":[["Registered with DLD (project 2982)","verified","registry","https://dubairealestateiq.com/project/karl-lagerfeld-villas-by-taraf"],["Escrow account (First Abu Dhabi Bank)","verified","registry","https://dubairealestateiq.com/project/karl-lagerfeld-villas-by-taraf"],["Handover within one year (developer ad, Oct 2026)","contradicted","registry","https://dubairealestateiq.com/developer/taraf"],["Handover June 2027 / Q2 2027","contradicted","registry","https://www.profoundproperties.com/project/karl-lagerfeld-villas"],["Located in Meydan / Nad Al Sheba with Crystal Lagoon views","contradicted","registry","https://dubairealestateiq.com/project/karl-lagerfeld-villas-by-taraf"],["51 villas","verified","registry","https://dubairealestateiq.com/project/karl-lagerfeld-villas-by-taraf"],["Construction under way (10.51% Sep 2026; start date 1 Sep 2024)","verified","registry","https://dubairealestateiq.com/project/karl-lagerfeld-villas-by-taraf"],["6BR from AED 25.58m (registered 5+BR median AED 24.7m)","verified","registry","https://vartur.ae/en/projects/karl-lagerfeld-villas/"],["Prices from AED 15m (older listings)","contradicted","registry","https://www.allsoppandallsopp.com/dubai/buyers/off-plan/karl-lagerfeld-villas"],["Developer has completed Dubai projects","contradicted","registry","https://dubairealestateiq.com/developer/taraf"],["Other Taraf projects are past registered dates (Luce 98.3% vs 31 Dec 2025; Terrazzo 95.2% vs 20 May 2026)","verified","registry","https://dubairealestateiq.com/developer/taraf"],["DLD project register: project 2982, status Active, no completion date on the register, 10.51% built at the DLD inspection of 23 Sep 2026, escrow account bank First Abu Dhabi Bank, registered developer Taraf Development L.L.C (DLD developer 1549) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/karl-lagerfeld-villas-by-taraf"]],"rvw":null}},"katabello-phuket":{"set":{"cl":[["Developer group release: Katabello in Kata, valued at THB 5.5 billion, scheduled for introduction in early 2025","verified","developer","https://assetwise.co.th/?p=101046"],["No record found in the ONEP EIA open register by project name or by the applicant company Rhom Bho Property PCL (searched 13 Nov 2026); a search miss is not proof that no report exists","unverified","registry","https://eia.onep.go.th/services/web/open-api/eia-list"],["Development profile lists status \"Under Construction\" and completion \"Q2 2027\"","unverified","none","https://rumavi.com/en/new-developments/thailand/karon/katabello"],["760 units in total, 8 floors as listed on the profile","unverified","none","https://rumavi.com/en/new-developments/thailand/karon/katabello"],["5 unit types are listed at Katabello, ranging from 1 to 3 bedrooms, between 28 and 100 sqm. Listed prices run from $4,863,620 to $13,293,895.","unverified","none","https://rumavi.com/en/new-developments/thailand/karon/katabello"]],"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["not checked","date on record 2027-Q2 not re-checked on the review date",null],"co":null,"sq":{"handover":"portal","permit":"registry","price":"portal","developer":"registry"},"miss":["handover status not resolved"]},"src":["https://rumavi.com/en/new-developments/thailand/karon/katabello","https://assetwise.co.th/?p=101046","https://eia.onep.go.th/services/web/open-api/eia-list"]}},"katameya-coast-phase-2":{"set":{"rvw":null}},"kavara-condo-ao-nang":{"set":{"rvw":null}},"kayak-living-nuevo-vallarta":{"set":{"rvw":null}},"kempinski-grace-bay-jtre":{"set":{"rvw":null}},"kempinski-residences-miami-design-district":{"set":{"rvw":null}},"kensington-gardens-leos":{"set":{"cl":[["Townhouse project registered with DLD as Kensington Gardens","contradicted","registry","https://dubairealestateiq.com/project/kensington-gardens"],["Escrow account for the townhouse project","unverified","none","https://leosdevelopments.com/greenwood/kensington-gardens/"],["Construction completion Q4 2027","unverified","none","https://leosdevelopments.com/leos-developments-proudly-introduces-kensington-gardens-the-uaes-thriving-new-residential-community/"],["Townhouses from AED 3.2m, villas from AED 6.9m","unverified","none","https://leosdevelopments.com/leos-developments-proudly-introduces-kensington-gardens-the-uaes-thriving-new-residential-community/"],["Portals mix the townhouse project with DLD project 3564 (apartments, 0% built at the only inspection on 17 Feb 2025)","contradicted","registry","https://www.seafront.ae/project/kensington-gardens-3564"],["Located within Nakheel's Greenwood master community","unverified","none","https://leosdevelopments.com/leos-developments-proudly-introduces-kensington-gardens-the-uaes-thriving-new-residential-community/"],["LEOS has completed projects in Dubai (Hadley Heights, Weybridge Gardens)","verified","registry","https://dubairealestateiq.com/developer/leos"],["LEOS projects run late: Weybridge Gardens 3 registered for 20 Aug 2026 was 23.9% built on 5 Aug 2026","verified","registry","https://dubairealestateiq.com/developer/leos"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/leos-international/kensington-gardens"],["Waterproofing with 10 year warranty","unverified","none","https://leosdevelopments.com/greenwood/kensington-gardens/"],["DLD project register: project 3564, status Active, completion date on the register 27 Sep 2027, 0% built at the DLD inspection of 17 Feb 2025, escrow account bank Emirates Islamic Bank, registered developer Leos Development L.L.C (DLD developer 1494) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/kensington-gardens"]],"ev":{"permit":"No permit or DLD project number published for the townhouse project. DLD project 3564 named Kensington Gardens is a studio to 2BR apartment building in Dubai Land Residence Complex (Wadi Al Safa 5), not the Greenwood townhouses","escrow":"DLD register: escrow account bank Emirates Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 17 Feb 2025: 0% built (DLD project register, mirrored on dubairealestateiq.com)","plans":"Floor plans for each townhouse and villa type on leosdevelopments.com","record":"DLD register: LEOS developer page shows Hadley Heights and Weybridge Gardens finished","returns_ok":"No guaranteed returns; Bayut area guide mentions anticipated lucrative returns without figures"},"pn":"DLD project registration 3564","rvw":null}},"keturah-reserve-mag":{"set":{"cl":[["Project registered with DLD (project 2924)","verified","registry","https://dubairealestateiq.com/project/keturah-reserve"],["Escrow account (Emirates NBD)","verified","registry","https://dubairealestateiq.com/project/keturah-reserve"],["Anticipated completion Q4 2026 (developer sales offer)","contradicted","registry","https://dubairealestateiq.com/project/keturah-reserve"],["Handover April 2026 (agent microsite)","contradicted","registry","https://magketurahreserve.ae/"],["Construction started (register start date 1 Dec 2022; 10.02% built Aug 2026)","verified","registry","https://dubairealestateiq.com/project/keturah-reserve"],["476 apartments plus 124 SuperHomes and 69 villa plots (brochure); DLD project 2924 lists 281 units in two buildings","contradicted","registry","https://dubairealestateiq.com/project/keturah-reserve"],["MAG delivered MAG 5 Boulevard (1,452 units) in 2019","verified","independent","https://www.constructionweekonline.com/projects-tenders/259589-early-completion-for-217m-mag-5-boulevard-homes-in-dubai-south"],["MAG has completed projects on the DLD register (MAG 5 Boulevard, MAG Eye Phase 1, MAG 330)","verified","registry","https://zoneiq.ae/developers/mag/"],["1BR apartment AED 3,759,000 for 1,106.66 sq ft","unverified","none","https://sales.mag.ae/Offer/c15ce081-b26a-46e2-9490-92bd38b424c8.html"],["Registered 2BR sales median AED 5.7m (AED 2,665 per sq ft)","verified","registry","https://dubairealestateiq.com/project/keturah-reserve"],["Payment accepted in crypto currency","unverified","none","https://9164734.fs1.hubspotusercontent-na1.net/hubfs/9164734/MAG%20Keturah%20Reserve/KETURAH%20RESERVE%20DIGITAL%20BROCHURE%20A3%20V13.6-compressed.pdf"],["DLD project register: project 2924, status Active, completion date on the register 30 Jun 2027, 10.02% built at the DLD inspection of 3 Aug 2026, escrow account bank Emirates Nbd Bank, registered developer Mag Park Real Estate Development L.L.C-Fz (DLD developer 1518) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/keturah-reserve"]],"rvw":null}},"keza-laika":{"set":{"rvw":null}},"keza-riruta-phase-2":{"set":{"rvw":null}},"khadr-rise-era-real-estate":{"set":{"rvw":null}},"khalid-bin-sultan-city-beeah":{"set":{"rvw":null}},"ki-lyon-france":{"set":{"rvw":null}},"king-tamar-by-archi":{"set":{"rvw":null}},"kingfisher-red-bank-riverside-fec":{"set":{"rvw":null}},"kingfisher-riverlands-signatura":{"set":{"rvw":null}},"kl360-menara-gd":{"set":{"rvw":null}},"klimona-river-klimona-development":{"set":{"rvw":null}},"koa-porto-de-galinhas":{"set":{"rvw":null}},"koi-villas-residences-phase-2-koi-hospitality":{"set":{"rvw":null}},"konia-green-cyprus":{"set":{"rvw":null}},"koppelhain":{"set":{"rvw":null}},"kore-by-imtiaz-dubai":{"set":{"rvw":null}},"korkowa-146-warsaw":{"set":{"rvw":null}},"kosmos-torremolinos-kronos-homes":{"set":{"rvw":null}},"krabi-cliff-villas-krabi-contractor":{"set":{"rvw":null}},"krrish-square-colombo":{"set":{"rvw":null}},"kuilei-place":{"set":{"rvw":null}},"kuzey-adalar-northern-islands-kartal-istanbul":{"set":{"rvw":null}},"la-casa-resort-hurghada-sama-developments":{"set":{"rvw":null}},"la-casalia":{"set":{"rvw":null}},"la-husta-france":{"set":{"rvw":null}},"la-perle-de-tanger-tangier":{"set":{"rvw":null}},"la-pirogue-residences":{"set":{"rvw":null}},"la-pura-vietnam":{"set":{"rvw":null}},"la-reserve-du-cap-pierre-blanche":{"set":{"rvw":null}},"la-sagesse-collection-residences-range":{"set":{"rvw":null}},"la-superbe":{"set":{"rvw":null}},"la-wisteria-siolim-sea-breeze":{"set":{"rvw":null}},"lacovia-bronte":{"set":{"rvw":null}},"lago-altear":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.solyd.pt/en/lago-altear/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"lagoon-views-damac-lagoons-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/damac-properties/damac-lagoons-lagoon-views-12"],["DLD project register: project 2925, status Active, no completion date on the register, 55.58% built at the DLD inspection of 15 May 2026, escrow account bank First Abu Dhabi Bank, registered developer Island Oasis Properties (DLD developer 921) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-lagoons-lagoon-views-1"]],"ev":{"permit":"Registered as DLD project 2925, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 15 May 2026: 55.58% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Island Oasis Properties (DLD developer 921)"},"pn":"DLD project registration 2925","rvw":null,"src":["https://www.damacproperties.com/en/communities/damac-lagoons/projects/lagoon-views/","https://www.propertyfinder.ae/en/new-projects/damac-properties/damac-lagoons-lagoon-views-12","https://dubairealestateiq.com/project/damac-lagoons-lagoon-views-1"]}},"lagoons-village-by-tm-phase-2-costa-blanca":{"set":{"rvw":null}},"laguna-bayside":{"set":{"rvw":null}},"laguna-lake-residences-aster-banyan-group":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256810-3, approval ทส1009.5/4893)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2028-Q2; developer page read on 13 Nov 2026: \"1 km to Bang Tao Beach; completion is scheduled for Q2 2028\"","https://buro.co.th/en/news/buro-aster-building-3"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"laguna-seaside":{"set":{"rvw":null}},"lagune-homes-calpe-neinor":{"set":{"cl":[["Building licence expediente 19033/2023, decree TA01 2024-1579","unverified","none","https://www.neinorhomes.com/uploads/promociones/documentos/6209//dosier_promociones/0000000003333364.PDF"],["Project has all required permits (Mar 2024)","verified","independent","https://alicanteplaza.es/neinor-levanta-dos-torres-en-calp-con-54-apartamentos-de-hasta-medio-millon-de-euros"],["Deposits covered by MUSAAT surety insurance","unverified","none","https://www.neinorhomes.com/uploads/promociones/documentos/6209//dosier_promociones/0000000003333364.PDF"],["Promoter Pegasus Holdco S.L. (B88223722) is a registered company with real estate object, incorporated 22/10/2018","verified","registry","https://www.datoscif.es/empresa/bowdoin-sl"],["Neinor co-invests with Orion Capital Managers as managing partner","verified","independent","https://iberian.property/news/residential/neinor-homes-begins-construction-of-a-new-residential-development-in-calpe/"],["54 homes","contradicted","independent","https://iberian.property/news/residential/neinor-homes-begins-construction-of-a-new-residential-development-in-calpe/"],["Construction started Nov 2024","verified","independent","https://iberian.property/news/residential/neinor-homes-begins-construction-of-a-new-residential-development-in-calpe/"],["Completion July 2026 (Mar 2024 press) later September 2026","contradicted","independent","https://alicanteplaza.es/neinor-levanta-dos-torres-en-calp-con-54-apartamentos-de-hasta-medio-millon-de-euros"],["Prices from EUR 379,000 (launch range EUR 320,000 to 550,000)","contradicted","independent","https://alicanteplaza.es/neinor-levanta-dos-torres-en-calp-con-54-apartamentos-de-hasta-medio-millon-de-euros"],["Neinor delivered earlier projects such as Sa Llosa Homes","verified","independent","https://www.estrategiasdeinversion.com/actualidad/noticias/bolsa-espana/neinor-homes-finaliza-y-entrega-las-viviendas-n-775765"],["Freehold title, fincas registrales 44.083 and 44.085","unverified","none","https://www.neinorhomes.com/uploads/promociones/documentos/6209//dosier_promociones/0000000003333364.PDF"],["The developer page read on 13 Nov 2026 prints: \"DELIVERY 2026\"","unverified","none","https://www.neinorhomes.com/en/promocion/lagune-homes/"],["The developer sales dossier read on 13 Nov 2026 gives the estimated dates of completion of works and of delivery of the homes as \"31/06/2026 y 30/09/2026, respectivamente\"","unverified","none","https://www.neinorhomes.com/uploads/promociones/documentos/6209//dosier_promociones/0000000003333364.PDF"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["passed-unconfirmed","The sales dossier dates completion of works 31/06/2026 (as printed) and delivery 30/09/2026; that date has passed. The project page still says \"DELIVERY 2026\". No source we read confirms the handover.","https://www.neinorhomes.com/en/promocion/lagune-homes/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"registry"},"miss":null}}},"lake11-flow-phase-2-of-lake-11-budapest":{"set":{"rvw":null}},"landmark-tower-da-nang":{"set":{"rvw":null}},"lao-center-vientiane-qiancheng":{"set":{"rvw":null}},"lara-port-antalya":{"set":{"rvw":null}},"las-palmas-de-tamarindo":{"set":{"rvw":null}},"las-palmeras-font-de-sa-cala":{"set":{"rvw":null}},"latitude-on-cambie-vancouver":{"set":{"rvw":null}},"laurean-residences-ayala-land-premier":{"set":{"rvw":null}},"layan-green-park-phase-2":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256509-110, approval ทส 1009.5/21650)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2026-Q4) comes from the sources listed on the page.","https://layangreenpark.com/"],"co":null,"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"layan-verde-villacarte":{"set":{"rvw":null}},"lb-pandawa-dream":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://lb-dreams.com/pandawadream"],"co":null,"sq":{"handover":"press","permit":"press","price":"press","developer":"developer"},"miss":null}}},"lb-pandawa-hills":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2026-Q4; developer page read on 13 Nov 2026: \"Roomtour Completion: Q4 2026 2 Rooftop ocean view cinema restaurant\"","https://pandawahills.com/en"],"co":null,"sq":{"handover":"press","permit":"press","price":"developer","developer":"press"},"miss":null}}},"lb-ubud-dream":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2027-Q3; developer page read on 13 Nov 2026: \"Payment schedule Construction completion Q3 2027 Contribution amount Payment purpose Pla\"","https://ubuddream.com/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"press"},"miss":null}}},"lb-xo-pandawa":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2026) comes from the sources listed on the page.","https://xo-project.com/pandawa"],"co":null,"sq":{"handover":"developer","permit":"developer"},"miss":null}}},"le-belvedere-bordo-neo":{"set":{"rvw":null}},"le-belvedere-bordo-tempo":{"set":{"rvw":null}},"le-blanc-by-imtiaz-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/imtiaz-developments/le-blanc"],["DLD project register: project 4174, status Active, completion date on the register 15 Oct 2028, 5.95% built at the DLD inspection of 8 Oct 2026, escrow account bank Ajman Bank /, registered developer Imtiaz Cove Real Estate Development L.L.C (DLD developer 2275) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/le-blanc-residence-by-imtiaz"],["The developer page read on 13 Nov 2026 prints: \"construction progress 11 overall ESTIMATED COMPLETION DATE Q2, 2028\"","unverified","none","https://imtiaz.ae/property/le-blanc"]],"ev":{"permit":"Registered as DLD project 4174, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Ajman Bank / (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 8 Oct 2026: 5.95% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Imtiaz Cove Real Estate Development L.L.C (DLD developer 2275)","handover_promised":"2028-Q4"},"pn":"DLD project registration 4174","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/le-blanc-residence-by-imtiaz"],"ho":["future","DLD register completion 15 Oct 2028; 5.95% built at the inspection of 8 Oct 2026; developer page: \"construction progress 11 overall ESTIMATED COMPLETION DATE Q2, 2028\"","https://dubairealestateiq.com/project/le-blanc-residence-by-imtiaz"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/le-blanc-residence-by-imtiaz"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://imtiaz.ae/property/le-blanc","https://www.propertyfinder.ae/en/new-projects/imtiaz-developments/le-blanc","https://dubairealestateiq.com/project/le-blanc-residence-by-imtiaz"],"st":"under construction"}},"le-clos-des-acacias":{"set":{"rvw":null}},"le-clos-des-landes":{"set":{"rvw":null}},"le-conde-2-bkk1-wangfu":{"set":{"rvw":null}},"le-gemme-vercana-lake-como":{"set":{"rvw":null}},"le-marin-konyaalti-tunc-yaprak":{"set":{"rvw":null}},"le-r-ve-lagos":{"set":{"rvw":null}},"le-reve-koh-samui-gefen-global":{"set":{"rvw":null}},"leland-south-congress":{"set":{"rvw":null}},"lendang-luar-2030":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"les-allees-de-la-tour":{"set":{"rvw":null}},"les-hauts-du-golfe":{"set":{"rvw":null}},"les-mas-du-roucaoudo":{"set":{"rvw":null}},"les-palms-de-l-atlas-marrakech":{"set":{"rvw":null}},"les-terrasses-d-ella":{"set":{"rvw":null}},"les-vagues-elie-saab-dar-global":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Qatar","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2027-Q2) was not re-checked.","https://darglobal.co.uk/les-vagues"],"co":null,"sq":{"handover":"portal","developer":"portal"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"les-villas-d-anfa-phase-5":{"set":{"rvw":null}},"level-pratumnak-pattaya":{"set":{"rvw":null}},"lichtenrader-bogen":{"set":{"rvw":null}},"lightwater-residences":{"set":{"rvw":null}},"limassol-greens-cyprus":{"set":{"rvw":null}},"linea-parc":{"set":{"rvw":null}},"linton-villas-mandalika-medusia":{"set":{"rvw":null}},"lio-tourism-estate-el-nido":{"set":{"rvw":null}},"lithos-bespoke-residences":{"set":{"rvw":null}},"litibu-bay-club-contact-development-company-llc-with-gbm-real-estate-p":{"set":{"rvw":null}},"liv-katipunan":{"set":{"rvw":null}},"living-club-temozon-norte-calle-52":{"set":{"rvw":null}},"lodha-sea-face-mumbai":{"set":{"rvw":null}},"lofty-brickell":{"set":{"rvw":null}},"london-square-bermondsey-final-phase":{"set":{"cl":[["Planning permission 20/AP/2993 granted to London Square Developments Limited for up to 183 homes","verified","registry","https://moderngov.southwark.gov.uk/documents/s126895/APPENDIX%201.pdf"],["Scheme is 37.3% affordable, all social rent","verified","registry","https://moderngov.southwark.gov.uk/documents/s126792/20AP2993%20-%20RICH%20INDUSTRIAL%20ESTATE%20CRIMSCOTT%20STREET%20AND%20WILLOW%20WALK%20LONDON%20SE1%205TE.pdf"],["60 social rent homes delivered with Aster Group","verified","independent","https://www.estatesgazette.co.uk/news/london-square-partners-with-aster-group-to-deliver-60-bermondsey-homes/"],["S106 varied in 2026 to remove the social rent service charge cap","verified","independent","https://planindex.co.uk/planning-applications/southwark/26-ap-2250"],["Developer company London Square Developments Limited active with filed accounts","verified","registry","https://find-and-update.company-information.service.gov.uk/company/07160957"],["276 homes already delivered on the estate","verified","independent","https://www.estatesgazette.co.uk/news/london-square-partners-with-aster-group-to-deliver-60-bermondsey-homes/"],["Completion Q4 2028","unverified","none","https://londonsquare.co.uk/developments/bermondsey"],["Prices from GBP 640,000 (Jun 2026 article) versus GBP 635,000 (current page)","contradicted","none","https://londonsquare.co.uk/lsq-life/investment-spotlight-bermondsey-se1"],["Described as a 'Zone 1 asset' (investment article) versus 'Zone 2 location' (launch page)","contradicted","none","https://londonsquare.co.uk/events/your-invite-to-the-public-launch-of-london-square-bermondsey"],["Earlier phases completed 2021 to 2022 and sold out","unverified","none","https://www.buildington.co.uk/buildings/news/5798"],["Construction started","unverified","none","https://planindex.co.uk/planning-applications/southwark/26-ap-2250"],["Companies House: London Square Developments Limited, company number 07160957, Active, incorporated 17 February 2010 (read 13 Nov 2026)","verified","registry","https://find-and-update.company-information.service.gov.uk/company/07160957"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for United Kingdom","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q4) comes from the sources listed on the page.","https://londonsquare.co.uk/developments/bermondsey"],"co":["found","Companies House","https://find-and-update.company-information.service.gov.uk/company/07160957"],"sq":{"handover":"developer","permit":"press","price":"developer","developer":"registry"},"miss":null}}},"love-charoen-nakhon":{"set":{"rvw":null}},"love-it-wongamat-beach-pattaya":{"set":{"rvw":null}},"loyo-melasti-arcade":{"set":{"rvw":null}},"lucent-residences-jordan-gate-amman":{"set":{"rvw":null}},"luma-apartments-venture-villas-bali":{"set":{"rvw":null}},"luma-residences-muscat-bay":{"set":{"rvw":null}},"lumara-broadbeach-5point-bourke":{"set":{"rvw":null}},"lumia-lux-apartments-hotel-kigali":{"set":{"rvw":null}},"lumiere-midtown":{"set":{"rvw":null}},"lumina-residence-vst-group":{"set":{"rvw":null}},"luna-marina-pointe-bti-partners":{"set":{"rvw":null}},"luna-oak-residency-nairobi":{"set":{"rvw":null}},"luna-villas-uluwatu-zayari-developments":{"set":{"rvw":null}},"lunara-on-the-strand-rak-properties":{"set":{"cl":[["Project registered on RAK RERA off-plan project list under RAK Properties","verified","registry","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list"],["Developer is listed on ADX as RAKPROP","unverified","none","https://www.rakproperties.ae/news/rak-properties-announces-sales-for-lunara-on-the-strand-a-new-destination-community-at-marjan-beach/"],["583 homes in three towers","unverified","none","https://www.rakproperties.ae/news/rak-properties-announces-sales-for-lunara-on-the-strand-a-new-destination-community-at-marjan-beach/"],["Prices from AED 1.28M","unverified","none","https://opr.ae/projects/lunara-the-strand-al-marjan-rak"],["Construction start Q4 2026","unverified","none","https://www.rakproperties.ae/news/rak-properties-announces-sales-for-lunara-on-the-strand-a-new-destination-community-at-marjan-beach/"],["Handover Q1 2029","unverified","none","https://www.rakproperties.ae/news/rak-properties-announces-sales-for-lunara-on-the-strand-a-new-destination-community-at-marjan-beach/"],["RAK Properties has delivered homes before (Marbella Villas handover)","verified","independent","https://staging2.meconstructionnews.com/?p=50727"],["RAK Properties runs a large Mina pipeline (AED 5bn 2025 launches)","verified","independent","https://www.arabianbusiness.com/gcc/uae/uae-real-estate-rak-properties-announces-massive-1-4bn-pipeline-introduces-mina-development-in-ras-al-khaimah"],["Deposits paid into escrow","unverified","none","https://opr.ae/projects/lunara-the-strand-al-marjan-rak"],["The developer page read on 13 Nov 2026 prints: \"Construction is scheduled to begin in Q4 2026 with an anticipated completion date of Q1 2029\"","unverified","none","https://www.rakproperties.ae/news/rak-properties-announces-sales-for-lunara-on-the-strand-a-new-destination-community-at-marjan-beach/"]],"du":null,"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not listed","RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"ho":["future","developer page: \"Construction is scheduled to begin in Q4 2026 with an anticipated completion date of Q1 2029\"","https://www.rakproperties.ae/news/rak-properties-announces-sales-for-lunara-on-the-strand-a-new-destination-community-at-marjan-beach/"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"portal","developer":"registry"},"miss":["not found on the official register: RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)"]},"url":"https://www.rakproperties.ae/news/rak-properties-announces-sales-for-lunara-on-the-strand-a-new-destination-community-at-marjan-beach/"}},"luviya-antalya-rguzel-group":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Turkey","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q4) comes from the sources listed on the page.","https://www.rguzelgroup.com/en/luviya"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"press"},"miss":null}}},"luxury-gated-villa-development-baie-lazare-project-name-not":{"set":{"rvw":null}},"luz-altear":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.solyd.pt/en/luz-altear/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"lyvin-uluwatu":{"set":{"rvw":null}},"lz-sea-view-premium-sihanoukville":{"set":{"rvw":null}},"m-grand-minori":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 9600-6/08-2031/0878(R)-(S) for Residensi Anggun Mewah (9600-6), valid 2025-08-29 to 2028-08-28","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/9600-6"],["Developer Dsara Sentral Sdn. Bhd. holds developer licence 9600/09-2033/0428(R) (valid 2026-09-03 to 2033-09-02); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/9600-6"],["Register shows construction progress of 20.00% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/9600-6"],["Vacant possession due 25 Sep 2028 under the first sale agreement (Jadual H, 36 months, first SPA 25 Sep 2025); the register records an approved extension of 22 months to 25 Jul 2030","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/9600-6"],["KPKT TEDUH register lists advertising and sales permit 9600-7/11-2028/0954(A)-(S) for Residensi Anggun Mewah (9600-7), valid 2025-11-11 to 2028-11-10","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/9600-7"],["Developer Dsara Sentral Sdn. Bhd. holds developer licence 9600/09-2033/0428(R) (valid 2026-09-03 to 2033-09-02); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/9600-7"],["Register shows construction progress of 13.63% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/9600-7"],["Vacant possession due 25 Feb 2029 under the first sale agreement (Jadual H, 36 months, first SPA 25 Feb 2026); the register records an approved extension of 24 months to 25 Feb 2031","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/9600-7"],["Expected date of completion printed on the developer permits page: July 2030","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 9600/09-2026/0761 (A) and advertising and sales permit 9600-6/08-2031/0878(R)-(S) (Tower A) and 9600-7/11-2028/0954(N)-(S) (Tower B); approving authority: Majlis Bandaraya Johor Bahru; building plan reference MBJB/U/2025/14/BGN/105/KOM","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["843 units in Tower A and 890 in Tower B (61 floors each); Tower B expected completion October 2030; freehold; selling price from RM437,000 to RM1,000,000 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 9600-6/08-2031/0878(R)-(S) as valid 2025-08-29 to 2028-08-28 (read 13 Nov 2026); also 9600-7/11-2028/0954(A)-(S)","progress":"TEDUH register (latest 7(f) HIMS report): 20/13.63% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/9600-6"],"ho":["future","date on record July 2030; checked against: Vacant possession due 25 Sep 2028 under the first sale agreement (Jadual H, 36 months, first SPA 25 Sep 2025); the register records an approved extension of 22 months to 25 Jul 2030","https://teduh.kpkt.gov.my/api/projek-swasta/9600-6"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/9600-6"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 9600-6/08-2031/0878(R)-(S) valid to 2028-08-28; progress 20.00%","code":"9600-6","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/m-grand-minori/","https://teduh.kpkt.gov.my/api/projek-swasta/9600-6","https://teduh.kpkt.gov.my/api/projek-swasta/9600-7"]}},"m-legasi-phase-3":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 30897-3/09-2027/0726(N)-(L) for M Legasi (30897-3), valid 2025-09-02 to 2027-09-01","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30897-3"],["Developer Mestika Bistari Sdn. Bhd. holds developer licence 30897/10-2029/0240(A) (valid 2024-10-25 to 2029-10-24); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30897-3"],["Register shows construction progress of 20.00 / 20.00 / 20.00% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30897-3"],["Vacant possession due 08 Apr 2028 under the first sale agreement (Jadual G, 24 months, first SPA 08 Apr 2026); the register records an approved extension of 12 months to 08 Apr 2029","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30897-3"],["Expected date of completion printed on the developer permits page: August 2028","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 30897/10-2029/0240(A) and advertising and sales permit 30897-3/09-2027/0726(N)-(L); approving authority: Majlis Perbandaran Kajang; building plan reference Bil.(24)dlm.MPKj2/P/21/2025","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["231 two-storey terrace homes in Phase 3 (Types A and B); freehold; selling price from RM769,216 to RM1,141,056 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 30897-3/09-2027/0726(N)-(L) as valid 2025-09-02 to 2027-09-01 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 20/20/20% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual G sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/30897-3"],"ho":["future","date on record August 2028; checked against: Vacant possession due 08 Apr 2028 under the first sale agreement (Jadual G, 24 months, first SPA 08 Apr 2026); the register records an approved extension of 12 months to 08 Apr 2029","https://teduh.kpkt.gov.my/api/projek-swasta/30897-3"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/30897-3"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 30897-3/09-2027/0726(N)-(L) valid to 2027-09-01; progress 20.00/20.00/20.00%","code":"30897-3","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/semenyih-house-for-sale-m-legasi/","https://teduh.kpkt.gov.my/api/projek-swasta/30897-3"]}},"m-sinar-southville-city-phase-1":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 13425-8/05-2027/0477(A)-(S) for M Sinar (13425-8), valid 2024-05-31 to 2027-05-30","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13425-8"],["Developer Southville City Sdn. Bhd. holds developer licence 13425/03-2028/0360(A) (valid 2023-03-02 to 2028-03-01); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13425-8"],["Register shows construction progress of 64.10 / 70.00% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13425-8"],["Vacant possession due 04 Jun 2027 under the first sale agreement (Jadual H, 36 months, first SPA 04 Jun 2024); the register records an approved extension of 12 months to 04 Jun 2028","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13425-8"],["Expected date of completion printed on the developer permits page: June 2028","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 13425/03-2028/0360(A) and advertising and sales permit 13425-8/05-2027/0477(A)-(S); approving authority: Majlis Perbandaran Sepang; building plan reference MPSepang. 600-34/3/619(12)","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["500 units in Block A (78 affordable apartments at RM270,000 and 422 serviced apartments); freehold; selling price from RM618,000 to RM643,000 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 13425-8/05-2027/0477(A)-(S) as valid 2024-05-31 to 2027-05-30 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 64.1/70% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/13425-8"],"ho":["future","date on record June 2028; checked against: Vacant possession due 04 Jun 2027 under the first sale agreement (Jadual H, 36 months, first SPA 04 Jun 2024); the register records an approved extension of 12 months to 04 Jun 2028","https://teduh.kpkt.gov.my/api/projek-swasta/13425-8"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/13425-8"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 13425-8/05-2027/0477(A)-(S) valid to 2027-05-30; progress 64.10/70.00%","code":"13425-8","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/bangi-property-m-sinar/","https://teduh.kpkt.gov.my/api/projek-swasta/13425-8"]}},"m-zenni-malaysia":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 12029-3/09-2028/0779(A)-(S) for M Zenni (12029-3), valid 2025-09-23 to 2028-09-22","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/12029-3"],["Developer Vienna View Development Sdn. Bhd. holds developer licence 12029/11-2027/1276(A) (valid 2022-11-11 to 2027-11-10); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/12029-3"],["Register shows construction progress of 5.00% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/12029-3"],["Vacant possession due 29 Sep 2028 under the first sale agreement (Jadual H, 36 months, first SPA 29 Sep 2025); the register records an approved extension of 12 months to 29 Sep 2029","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/12029-3"],["Expected date of completion printed on the developer permits page: September 2029","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 12029/11-2027/1276(A) and advertising and sales permit 12029-3/09-2028/0779(A)-(S); approving authority: Majlis Bandaraya Pulau Pinang; building plan reference MBPP.OSC-PB1450/2025","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["494 serviced apartment units; freehold; selling price from RM657,250 to RM1,139,750 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The project page describes a 33-storey tower with 10 commercial lots within the Southbay township, 900 m from the Second Penang Bridge and 1.5 km from Penang International Airport (distances as published)","unverified","none","https://www.mahsing.com.my/projects/penang-new-condo-m-zenni/"],["Pin: 5.284251, 100.288933 (Cangkat Batu Maung 1, the address the developer publishes for M Zenni, geocoded with OpenStreetMap Nominatim (street-level match: the pin is on the street the developer names, not on the plot)); the address is the one published by the developer","unverified","none","https://www.mahsing.com.my/projects/penang-new-condo-m-zenni/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 12029-3/09-2028/0779(A)-(S) as valid 2025-09-23 to 2028-09-22 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 5% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/12029-3"],"ho":["future","date on record September 2029; checked against: Vacant possession due 29 Sep 2028 under the first sale agreement (Jadual H, 36 months, first SPA 29 Sep 2025); the register records an approved extension of 12 months to 29 Sep 2029","https://teduh.kpkt.gov.my/api/projek-swasta/12029-3"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/12029-3"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 12029-3/09-2028/0779(A)-(S) valid to 2028-09-22; progress 5.00%","code":"12029-3","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/penang-new-condo-m-zenni/","https://teduh.kpkt.gov.my/api/projek-swasta/12029-3"]}},"m2-at-mirtskhulava":{"set":{"rvw":null}},"m2-at-mtatsminda-park":{"set":{"rvw":null}},"m2-highlight-m2":{"set":{"cl":[["m² was owned by Georgia Capital and sold to local investors on 5 June 2026","verified","independent","https://georgiacapital.ge/news/company-news/1293-disposal-of-the-housing-development-business"],["m2 Group LLC acquired 100% by Trust Holding LLC (registry extract cited)","verified","independent","https://www.businessinsider.ge/Bussines/m2-is-akhali-mflobelebi-dimitri-adamia-da-lasha-kvachadze-arian-37220?lng=geo"],["Housing business bond of USD 25 million to be repaid from sale proceeds","verified","independent","https://georgiacapital.ge/news/company-news/1293-disposal-of-the-housing-development-business"],["Construction started May 2023, completion June 2027","verified","independent","https://anagi.ge/en/project/m-highlight-tbilisi/220"],["Buildings XI-XII complete in 2027","unverified","none","https://m2.ge/en/projects/m2-highlight"],["Construction is under way with photos up to October 2026","verified","independent","https://korter.ge/en/m2-highlight-tbilisi"],["350 flats sold","unverified","none","https://m2.ge/en/projects/m2-highlight"],["Price from USD 1,610 per m2","unverified","none","https://korter.ge/en/m2-highlight-tbilisi"],["Apartment sizes 68.98 to 141.62 m2 (portal layouts show only 116.35 to 141.62 m2)","contradicted","none","https://korter.ge/en/m2-highlight-tbilisi"],["Construction permit issued","unverified","none","https://korter.ge/en/m2-highlight-tbilisi"],["Buyer deposits protected by escrow","unverified","none","https://m2.ge/en/projects/m2-highlight"],["The developer page read on 13 Nov 2026 prints: \"Construction completion timeline: Buildings XI-XII - 2027\"","unverified","none","https://m2.ge/en/projects/m2-highlight"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Georgia","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Construction completion timeline: Buildings XI-XII - 2027\"","https://m2.ge/en/projects/m2-highlight"],"co":null,"sq":{"handover":"developer","permit":"portal","price":"portal","developer":"developer"},"miss":null},"url":"https://m2.ge/en/projects/m2-highlight"}},"macaria-puerto-vallarta-grupo-origen":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q3) comes from the sources listed on the page.","https://macariavallarta.mx/en/"],"co":null,"sq":{"handover":"press","permit":"registry","price":"press","developer":"registry"},"miss":null}}},"mactan-newtown":{"set":{"rvw":null}},"magnum-resort-sanur":{"set":{"rvw":null}},"maia-mont-kiara":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 30141-2/06-2029/0431(A)-(S) for Residensi Mahligai Alam Indah (maia) (30141-2), valid 2026-06-11 to 2029-06-10","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30141-2"],["Developer Laser Tower Sdn. Bhd. holds developer licence 30141/08-2027/0140(A) (valid 2022-08-10 to 2027-08-09); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30141-2"],["Register shows construction progress of 7.79 / 7.76% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30141-2"],["Vacant possession due 04 Sep 2029 under the first sale agreement (Jadual H, 36 months, first SPA 04 Sep 2026); the register records an approved extension of 18 months to 04 Mar 2031","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30141-2"],["Expected date of completion: June 2029","unverified","none","https://www.uemsunrise.com/permit-and-licenses"],["Two 45-storey condominium blocks: Block A 247 units and Block B 248 units; freehold","unverified","none","https://www.uemsunrise.com/permit-and-licenses"],["Prices: Block A RM2,273,500 to RM3,563,500; Block B RM1,841,000 to RM3,869,750","unverified","none","https://www.uemsunrise.com/permit-and-licenses"],["Developer licence no. 30141/08-2027/0140(A)","unverified","none","https://www.uemsunrise.com/permit-and-licenses"],["Advertising and sales permit no. 30141-2/06-2029/0431(N)-(S), valid 11/06/2026 to 10/06/2029","unverified","none","https://www.uemsunrise.com/permit-and-licenses"],["Building plan approval BP T1 OSC 2025 4037 issued by Dewan Bandaraya Kuala Lumpur","unverified","none","https://www.uemsunrise.com/permit-and-licenses"],["Developer named as Laser Tower Sdn. Bhd. (647615-T)","unverified","none","https://www.uemsunrise.com/permit-and-licenses"]],"ev":{"permit":"TEDUH (KPKT) lists permit 30141-2/06-2029/0431(A)-(S) as valid 2026-06-11 to 2029-06-10 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 7.79/7.76% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page"},"pn":"30141-2/06-2029/0431(A)-(S)","rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/30141-2"],"ho":["future","date on record June 2029; checked against: Vacant possession due 04 Sep 2029 under the first sale agreement (Jadual H, 36 months, first SPA 04 Sep 2026); the register records an approved extension of 18 months to 04 Mar 2031","https://teduh.kpkt.gov.my/api/projek-swasta/30141-2"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/30141-2"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 30141-2/06-2029/0431(A)-(S) valid to 2029-06-10; progress 7.79/7.76%","code":"30141-2","checked":"2026-11-13"},"src":["https://www.uemsunrise.com/permit-and-licenses","https://teduh.kpkt.gov.my/api/projek-swasta/30141-2"]}},"maison-broadbeach":{"set":{"rvw":null}},"maison-privee":{"set":{"rvw":null}},"maisons-de-bonneval-property-lab":{"set":{"rvw":null}},"makai-residences-cap-cana-duna-development":{"set":{"rvw":null}},"mamsha-palm-aldar":{"set":{"rvw":null}},"manazel-alhadawi-diriyah-company":{"set":{"rvw":null}},"manchester-city-yas-residences-ohana":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["none","The developer page prints instalments up to 15 Jul 2029 and a final payment on completion, but no completion date.","https://mancityyasresidences.ohana.ae/"],"co":null,"sq":{"handover":"press","permit":"press","price":"developer","developer":"press"},"miss":null}}},"mandani-bay-quay-htland":{"set":{"rvw":null}},"mandarin-oriental-residences-bali-harmoni-bali":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://www.mandarinoriental.com/en/residences/upcoming/bali"],"co":null,"sq":{"handover":"press","permit":"developer","developer":"press"},"miss":null}}},"mandarin-oriental-residences-boca-raton":{"set":{"rvw":null}},"mandarin-oriental-residences-grand-cayman-melkonian-ral":{"set":{"rvw":null}},"mandarin-oriental-residences-kanai-riviera-maya-inmobiliaria-kanai-onc":{"set":{"rvw":null}},"mandtra-residences-tower-3-mandaue":{"set":{"rvw":null}},"manta-livin":{"set":{"rvw":null}},"mar-casa-deyaar":{"set":{"cl":[["Project registered with DLD (project 2589)","verified","registry","https://dubairealestateiq.com/project/mar-casa"],["Escrow account (First Abu Dhabi Bank)","verified","registry","https://dubairealestateiq.com/project/mar-casa"],["Developer page: end date 01/10/2026","contradicted","registry","https://dubairealestateiq.com/project/mar-casa"],["Property Finder: delivery December 2026","contradicted","registry","https://www.propertyfinder.ae/en/new-projects/deyaar-leasing/mar-casa"],["Agent listing: handover Q4 2027, construction end 31 Dec 2027 (register still lists 31 Oct 2026 at 56.45% built)","contradicted","registry","https://jre.ae/projects/mar-casa"],["Construction under way, 56% complete","verified","registry","https://dubairealestateiq.com/project/mar-casa"],["580 apartments (Property Finder) vs 585 units on DLD register","verified","registry","https://dubairealestateiq.com/project/mar-casa"],["Deyaar has completed projects on the DLD register (Regalia, Midtown)","verified","registry","https://zoneiq.ae/developers/deyaar/"],["1BR from AED 2.35m today (AED 1.28m at launch)","verified","registry","https://dubairealestateiq.com/project/mar-casa"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/deyaar-leasing/mar-casa"],["Deyaar projects under construction run a median 38 points behind schedule on DLD data","verified","registry","https://zoneiq.ae/developers/deyaar/"],["DLD project register: project 2589, status Active, completion date on the register 31 Oct 2026, 56.45% built at the DLD inspection of 4 Aug 2026, escrow account bank First Abu Dhabi Bank, registered developer Deyaar Development (P.J.S.C) (DLD developer 15) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/mar-casa"]],"rvw":null}},"marafy-jeddah":{"set":{"rvw":null}},"marassi-red-sea-emaar-misr":{"set":{"rvw":null}},"marassi-views-eagle-hills":{"set":{"rvw":null}},"marco-polo-condominium-cape-verde":{"set":{"rvw":null}},"marco-polo-residences-cebu":{"set":{"rvw":null}},"marea-blu-villas-sveti-vlas":{"set":{"rvw":null}},"marea-interiors-by-missoni":{"set":{"rvw":null}},"marea-residences-grand-reserve-puerto-rico":{"set":{"rvw":null}},"marella-puig":{"set":{"rvw":null}},"marina-bay-city-marketed-as-nesara-bay-city-by-lux-property":{"set":{"rvw":null}},"marina-bay-reef-island-infracorp":{"set":{"rvw":null}},"marina-dor-ol-phase-i-belgrade":{"set":{"rvw":null}},"marina-towers-torre-ii-marina-towers-s-a-p-i-de-c-v":{"set":{"rvw":null}},"marina-village-residences-visterija-and-jasmin-residences":{"set":{"rvw":null}},"marina-waters-durres-eagle-hills":{"set":{"rvw":null}},"maris-seri-tanjung-pinang":{"set":{"rvw":null}},"marriott-residences-aida":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Oman","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (September 2029) was not re-checked.","https://darglobal.co.uk/marriott-residences-aida-oman"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"masaka-views-eco-estate-kigali":{"set":{"rvw":null}},"masteri-cosmo-central":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Vietnam","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2028 not re-checked on the review date",null],"co":null,"sq":{"handover":"portal","price":"portal"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"masteri-grand-avenue":{"set":{"rvw":null}},"masteri-grand-view-global-city-hcmc":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Vietnam","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2026-Q4) comes from the sources listed on the page.","http://masterisehomes.com/the-global-city/vi/masteri-grand-view"],"co":null,"sq":{"handover":"press","permit":"press","price":"press","developer":"developer"},"miss":null}}},"maua-labuan-bajo-bukit-warloka-sejahtera":{"set":{"rvw":null}},"mavista-phrom-phong-major-development":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2029; developer page read on 13 Nov 2026: \"Construction is scheduled to continue as planned, with project completion targeted for 2029 , reinforcing Major Development's commi\"","https://www.mjd.co.th/news-detail/14"],"co":null,"sq":{"handover":"portal","permit":"portal","price":"developer"},"miss":null}}},"mawatu-labuan-bajo":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2026-Q4) comes from the sources listed on the page.","https://mawatu.co.id/commercial-village"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"developer"},"miss":null}}},"mayaliah-tulum-mgallery-branded-residences":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"mayamar-torre-sur-grupo-solcon":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2028-Q2 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","permit":"registry","price":"press","developer":"registry"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"me-ciema-m-jas-phase-2-s-eizen-teina-iela-47-riga":{"set":{"rvw":null}},"medblue-4-1-costa-del-sol":{"set":{"rvw":null}},"medblue-iii":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["none","The project page prints the status steps but no date; the date on record (first half of 2027) is from the developer list page.","https://metrovacesa.com/en/developments/malaga/marbella/medblue-iii"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"melasti-cliff-villas-ungasan":{"set":{"rvw":null}},"melia-residences-bahrain-infracorp":{"set":{"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Bahrain","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://infracorp.bh/own-your-unit-at-melia-residences-bahrain-with-an-annual-return-of-up-to-7-sales-officially-launch-for-melia-residences-bahrain-in-amwaj-islands/"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"portal","developer":"press"},"miss":null},"url":"https://infracorp.bh/own-your-unit-at-melia-residences-bahrain-with-an-annual-return-of-up-to-7-sales-officially-launch-for-melia-residences-bahrain-in-amwaj-islands/"}},"melia-ward-village":{"set":{"rvw":null}},"meraas-city-walk-crestlane":{"set":{"cl":[["Project registered with DLD (project 3530, Active)","verified","registry","https://dubairealestateiq.com/project/city-walk-crestlane-2"],["Escrow account (Abu Dhabi Commercial Bank)","verified","registry","https://dubairealestateiq.com/project/city-walk-crestlane-2"],["Construction at 6.83% (DLD inspection 8 Oct 2026)","verified","registry","https://dubairealestateiq.com/project/city-walk-crestlane-2"],["Developer entity registered: Citywalk Residential 1 L.L.C (DLD developer 1109)","verified","registry","https://dubairealestateiq.com/project/city-walk-crestlane-2"],["Developer track record: 21 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/meraas"],["Estimated completion Oct 2028 / Q4 2028 [DLD 10 Dec 2028 for Crestlane 2 and 3; other phases register Sep 2029 (Crestlane 1) and Apr 2030 (Crestlane 4 and 5)]","verified","registry","https://dubairealestateiq.com/project/city-walk-crestlane-2"],["Development progression 6% overall [DLD 6.83% (Crestlane 2) and 4.59% (Crestlane 3)]","verified","registry","https://dubairealestateiq.com/project/city-walk-crestlane-2"],["Main construction contract (AED 590m, Parkway) awarded for Phase 3, completion Q3 2028 [developer press release]","unverified","none","https://meraas.com/en/latest-post/news/meraas-awards-over-aed-590-million-main-construction-contract-city-walk-crestlane"],["Registered sales median AED 3.6m to 3.8m in other Crestlane phases","verified","registry","https://dubairealestateiq.com/project/city-walk-crestlane-4"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/city-walk-crestlane-dubai"],["No guaranteed returns advertised","unverified","none","https://meraas.com/en/project/city-walk-crestlane"],["DLD project register: project 3801, status Active, completion date on the register 30 Sep 2029, 0.19% built at the DLD inspection of 3 Aug 2026, escrow account bank National Bank Of Ras Al- Khaimah (P.S.C), registered developer Citywalk Residential 1 L.L.C (DLD developer 1109) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/city-walk-crestlane-1"]],"rvw":null}},"mercedes-benz-places-miami-jds":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77491 \"1 SOUTHSIDE PARK CONDO SOUTH\", developer entity named in the filing","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Florida DBPR Division of Condominiums developer summary lists approved project PR77492 \"1 SOUTHSIDE PARK CONDO NORTH\", developer entity named in the filing","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Completion Q4 2027","contradicted","independent","https://therealdeal.com/miami/2026/04/08/heres-where-michael-sterns-miami-condo-projects-stand"],["Construction timeline remains unchanged (JDS)","contradicted","independent","https://therealdeal.com/miami/2026/04/08/heres-where-michael-sterns-miami-condo-projects-stand"],["Foreclosure suit by Cottonwood affiliate over USD 80.4M principal, matured Jan 2025","verified","independent","https://therealdeal.com/miami/2026/04/08/heres-where-michael-sterns-miami-condo-projects-stand"],["USD 1.11B construction financing led by J.P. Morgan","unverified","independent","https://commercialobserver.com/2026/09/mercedes-benz-miami-construction-jpmorgan/"],["791 residences","verified","independent","https://commercialobserver.com/2026/09/mercedes-benz-miami-construction-jpmorgan/"],["Presales of about USD 450M","unverified","independent","https://therealdeal.com/miami/2026/04/08/heres-where-michael-sterns-miami-condo-projects-stand"],["Prices from USD 715,500","unverified","none","https://www.millionluxury.com/brickell/mercedes-benz-places-miami"],["Fontainebleau Development joined as partner","verified","independent","https://commercialobserver.com/2026/09/mercedes-benz-miami-construction-jpmorgan/"],["Buyer deposits held in escrow","unverified","none","https://m.flsenate.gov/Statutes/718.202"]],"rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["not checked","date on record 2027-Q4 not re-checked on the review date",null],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"press","permit":"registry","price":"portal","developer":"registry"},"miss":["handover status not resolved"]},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77491, PR77492","code":"PR77491","checked":"2026-11-13"}}},"mercer-house-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/ellington/mercer-house"],["DLD project register: project 2990, status Active, completion date on the register 31 Jul 2027, 18.11% built at the DLD inspection of 7 Aug 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Eln Properties Development L.L.C (DLD developer 1466) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/mercer-house"]],"ev":{"permit":"Registered as DLD project 2990, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Abu Dhabi Commercial Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 7 Aug 2026: 18.11% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Eln Properties Development L.L.C (DLD developer 1466)","handover_promised":"2027-Q3"},"pn":"DLD project registration 2990","rvw":null,"src":["https://ellingtonproperties.ae/en/property-for-sale/mercer-house-jumeirah-lakes-tower","https://www.propertyfinder.ae/en/new-projects/ellington/mercer-house","https://dubairealestateiq.com/project/mercer-house"]}},"mercer-vale":{"set":{"rvw":null}},"meriva-collection-ellington":{"set":{"cl":[["Project registered with DLD (project 4346, Active)","verified","registry","https://dubairealestateiq.com/project/the-meriva-collection"],["Escrow account (Sharjah Islamic Bank)","verified","registry","https://dubairealestateiq.com/project/the-meriva-collection"],["Construction at 0% (DLD inspection 25 Feb 2026)","verified","registry","https://dubairealestateiq.com/project/the-meriva-collection"],["Developer entity registered: Crestarc Developers L.L.C (DLD developer 2423)","verified","registry","https://dubairealestateiq.com/project/the-meriva-collection"],["Developer track record: 21 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/ellington"],["Handover Q2 2030 (Ellington microsite) / Q4 2030 (A1 for Meriva Gardens) [DLD registered completion is 31 Dec 2031]","contradicted","registry","https://dubairealestateiq.com/project/the-meriva-collection"],["Developed by Ellington Properties [DLD register names Crestarc Developers L.L.C (developer 2423) as developer; register mirror groups it under the Ellington brand, so likely a project vehicle, but the link is not stated by Ellington]","verified","registry","https://dubairealestateiq.com/project/the-meriva-collection"],["Five residential buildings, a signature residence and a hotel [DLD lists 8 buildings incl. Meriva Hotel, Meriva Signature, Meriva Shores A and B, Meriva Sunset and podium]","verified","registry","https://dubairealestateiq.com/project/the-meriva-collection"],["Launched Feb 2026 as Ellington's first hospitality-led project [Zawya report based on the developer statement]","verified","independent","https://www.zawya.com/en/economy/gcc/ellington-unveils-hospitality-led-beachfront-destination-on-dubai-islands-hjoyf9w7"],["Registered sales median AED 4.0m, AED 3,448 per sq ft (484 sales)","verified","registry","https://dubairealestateiq.com/project/the-meriva-collection"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/meriva-gardens-dubai-islands"],["No guaranteed returns advertised","unverified","none","https://ellingtonproperties.ae/en/property-for-sale/the-meriva-collection-dubai-islands"],["DLD project register: project 4346, status Active, completion date on the register 31 Dec 2031, 0% built at the DLD inspection of 25 Feb 2026, escrow account bank Sharjah Islamic Bank, registered developer Crestarc Developers L.L.C (DLD developer 2423) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/the-meriva-collection"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/the-meriva-collection"],"ho":["future","DLD register completion 31 Dec 2031; 0% built at the inspection of 25 Feb 2026","https://dubairealestateiq.com/project/the-meriva-collection"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/the-meriva-collection"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"url":"https://ellingtonproperties.ae/en/property-for-sale/the-meriva-collection-dubai-islands"}},"mesa-yenikent-new-300-home-phase-istanbul":{"set":{"rvw":null}},"mesena-82-spain":{"set":{"rvw":null}},"metropol-cube-batumi-metropol":{"set":{"rvw":null}},"metrovacesa-abril-casares":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["none","no date published","https://metrovacesa.com/promociones/malaga/casares/abril"],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"press"},"miss":null}}},"metrovacesa-almare-mijas":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["none","no date published","https://metrovacesa.com/promociones/malaga/mijas/almare"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"press"},"miss":null}}},"metrovacesa-blue-wave-manilva":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["none","no date published","https://metrovacesa.com/promociones/malaga/manilva/blue-wave"],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"press"},"miss":null}}},"mevacity-alanya-unal-group":{"set":{"rvw":null}},"michelieres":{"set":{"rvw":null}},"midea-france":{"set":{"rvw":null}},"miera-rezidences-riga":{"set":{"rvw":null}},"milan-towers-mahmutlar-milan-group":{"set":{"rvw":null}},"millenia-park-orlando-mir-developments":{"set":{"rvw":null}},"minori-luxury-seminyak-eco-invest-group":{"set":{"rvw":null}},"mira-ocean-estates-trussardi-residences-first-phase-mira-developments":{"set":{"rvw":null}},"mirasol-ras-al-khaimah":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/rak-properties/mirasol"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Mirasol\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"Mirasol\", In progress), read 13 Nov 2026"},"rvw":null,"src":["https://gulfconstructiononline.com/ArticleTA/436965","https://www.propertyfinder.ae/en/new-projects/rak-properties/mirasol","https://www.rakproperties.ae/our-properties/mirasol/","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"mireka-seascape-overseas-realty":{"set":{"rvw":null}},"miru-residences-hakuba-shc":{"set":{"rvw":null}},"miru-residences-hakuba-shc-ecclesia":{"set":{"rvw":null}},"mistral-costa-mujeres-evalor":{"set":{"rvw":null}},"mivela-garden-residences":{"set":{"rvw":null}},"mocca-rezidence-prague":{"set":{"rvw":null}},"mokotow-sportowy":{"set":{"rvw":null}},"molum-hotel-residences-dalmatia":{"set":{"rvw":null}},"mon-vie-colombo-05-thalakotuwa-gardens":{"set":{"rvw":null}},"moncello-crest-dmci-homes":{"set":{"rvw":null}},"mondesa-palms-namibia":{"set":{"rvw":null}},"mondomio-okinawa-onna-fuchaku-daiwa-house":{"set":{"rvw":null}},"mondrian-residences-cancun-murano":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q2) comes from the sources listed on the page.","https://mondrianresidencescancun.com.mx/pressrelease/"],"co":null,"sq":{"handover":"registry","permit":"registry","price":"press","developer":"registry"},"miss":null}}},"mont-reve-berman-brothers":{"set":{"rvw":null}},"montage-cay-residences-bahamas":{"set":{"rvw":null}},"montage-residences-punta-mita-dine-s-a-b-de-c-v":{"set":{"rvw":null}},"montana-flats-las-catalinas":{"set":{"rvw":null}},"montes-by-missoni-yalikavak-rma-holding":{"set":{"rvw":null}},"moon-gate-hotel-spa-antigua":{"set":{"rvw":null}},"moray-house-salvo":{"set":{"rvw":null}},"morros-vita-serena-del-mar":{"set":{"rvw":null}},"mountain-oak-queenstown-safari-group":{"set":{"rvw":null}},"mountain-residences-at-palmilla-reserve-los-cabos":{"set":{"rvw":null}},"movenpick-residences-kvarner-bay-ecm-partners":{"set":{"rvw":null}},"moyoni-bay":{"set":{"rvw":null}},"msida-suites":{"set":{"rvw":null}},"muda-comporta-villas":{"set":{"rvw":null}},"murcia-residences-sarazin":{"set":{"rvw":null}},"musket-ri-majad-tallinn":{"set":{"rvw":null}},"mwangani-skyloft":{"set":{"rvw":null}},"nad-al-sheba-gardens-phase-7-meraas":{"set":{"cl":[["Registered with DLD and active","verified","registry","https://doment.ai/projects/nad-al-sheba-gardens-phase-7-by-meraas"],["Escrow at Emirates NBD","verified","registry","https://www.prop971.com/project/PRJ-MER-NIAI2"],["Construction started Jan 2025","verified","registry","https://doment.ai/projects/nad-al-sheba-gardens-phase-7-by-meraas"],["Construction 4.01% complete (Aug 2026)","verified","registry","https://www.prop971.com/project/PRJ-MER-NIAI2"],["Handover Q3 2028","unverified","none","https://www.prop971.com/project/PRJ-MER-NIAI2"],["Meraas has 29 completed projects","unverified","none","https://www.prop971.com/project/PRJ-MER-NIAI2"],["Earlier phase (Phase 2) completed Dec 2024","verified","registry","https://www.dxbrealtor.ai/answers/nad-al-sheba-gardens-handover-date/"],["Completion 15 Feb 2028 (DLD) vs 31 Aug 2028 (Property Finder)","contradicted","registry","https://www.dxbrealtor.ai/answers/nad-al-sheba-gardens-handover-date/"],["Price from AED 4.43M","unverified","none","https://www.prop971.com/project/PRJ-MER-NIAI2"],["Permit number 1791004663","unverified","none","https://westgatedubai.com/zh-CN/%E8%AE%A1%E5%88%92/nad-al-sheba-%E8%8A%B1%E5%9B%AD-7-by-meras/"],["DLD project register: project 3446, status Active, completion date on the register 15 Feb 2028, 4.01% built at the DLD inspection of 12 Aug 2026, escrow account bank Emirates Nbd Bank, registered developer Nas Estates L.L.C (DLD developer 1762) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/nad-al-sheba-gardens-phase-7"]],"fx":{"developer_founded":2007.0,"developer_hq":"Dubai, UAE","developer_company":"Nas Estates L.L.C (DLD developer 1762)","construction_start":"2025-01","handover_promised":"2028-Q3","unit_types":["3BR townhouse","4BR villa","5BR villa","6BR villa","7BR villa"],"size_min_m2":251.0,"size_max_m2":809.0,"price_min":4430000.0,"price_max":23540000.0,"currency":"AED","foreign_ownership":"Freehold","service_charge":"AED 6 per sq ft (JRE); 64.58 AED/m2 (Alnair)","permit_authority":"Dubai Land Department / RERA"},"rvw":null,"src":["https://www.prop971.com/project/PRJ-MER-NIAI2","https://alnair.ae/en/dubai/compound/nad-al-sheba-gardens-phase-7","https://doment.ai/projects/nad-al-sheba-gardens-phase-7-by-meraas","https://disruptiveestate.com/off-plan/nad-al-sheba-gardens-phase-7","https://jre.ae/projects/nad-al-sheba-gardens-phase-7","https://westgatedubai.com/zh-CN/%E8%AE%A1%E5%88%92/nad-al-sheba-%E8%8A%B1%E5%9B%AD-7-by-meras/","https://www.dxbrealtor.ai/answers/nad-al-sheba-gardens-handover-date/","https://www.linkedin.com/posts/meraas_meraas-nadalshebagardens-constructionprogress-activity-7486379749934706688-W9bW","https://dubairealestateiq.com/project/nad-al-sheba-gardens-phase-7"],"st":"under construction"}},"naftikos-residences-cybarco":{"set":{"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Cyprus","https://kolaboro.com/registers/"],"ho":["none","No date in the developer page text; the Q3 2027 date on record comes from an agency.","https://www.cybarco.com/project/naftikos-residences/"],"co":null,"sq":{"handover":"press","permit":"developer","price":"developer","developer":"developer"},"miss":null},"url":"https://www.cybarco.com/project/naftikos-residences/"}},"naga-kiri-villas-lamai":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"nai-2-nusa-dua-vibe-development":{"set":{"rvw":null}},"nara-villas":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2027-Q4; developer page read on 13 Nov 2026: \"to 3 Price From $269,000 USD Build 153 to 226 sqm Land 105 to 188 sqm Lease 30 + 30 years Completion Q4 2027 Choose Your Villa Villa Types 2 Bedroom\"","https://www.balitecture.com/developments/nara-villas"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer"},"miss":null}}},"nashville-edition-residences-tidal":{"set":{"rvw":null}},"nasim-al-bahr-residences-adnh":{"set":{"cl":[["Project registered with RAK RERA under ADNM RAK Investments LLC OPC, status In progress","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["Launched 6 Nov 2025; 55 villas and 392 apartments","verified","independent","https://apigateway.adx.ae/adx/cdn/1.0/content/download/4700034"],["Total development value AED 3bn","verified","independent","https://gulfnews.com/business/property/new-dh3-billion-waterfront-luxury-residences-launched-on-marjan-island-1.500340459"],["Handover Q4 2027 (launch press)","contradicted","independent","https://apigateway.adx.ae/adx/cdn/1.0/content/download/4700034"],["Developer parent is a listed company","verified","independent","https://apigateway.adx.ae/adx/cdn/1.0/content/download/4700034"],["Branded under Marriott's The Luxury Collection","verified","independent","https://gulfnews.com/business/property/new-dh3-billion-waterfront-luxury-residences-launched-on-marjan-island-1.500340459"],["Construction 5% complete","unverified","none","https://impalarealestate.com/projects/nasim-al-bahr-residences/"],["Escrow account","unverified","none","https://impalarealestate.com/projects/nasim-al-bahr-residences/"],["Starting price AED 3.444M (press) vs 3.513M (portals)","contradicted","independent","https://www.zawya.com/en/economy/gcc/adnh-launches-nasim-al-bahr-residences-on-al-marjan-island-bxm20iqw"],["26-unit development (JRE)","contradicted","independent","https://jre.ae/projects/nasim-al-bahr-residences"],["Freehold for foreigners on Al Marjan Island","unverified","none","https://jre.ae/projects/nasim-al-bahr-residences"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Nasim Al Bahr Residences, A Luxury Collection Residence, Al Marjan Island\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"rvw":null}},"natha-loka":{"set":{"rvw":null}},"nativa-tulum":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"natulux-tatlisu-dovec-group":{"set":{"rvw":null}},"naturandi-huacas-guanacaste":{"set":{"rvw":null}},"nature-en-ville":{"set":{"rvw":null}},"nautica-residences-cancun-nauma":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2028-Q3 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","permit":"registry","developer":"registry"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"nawi-island-homes":{"set":{"rvw":null}},"naya-at-district-one-meydan":{"set":{"cl":[["Registered on the DLD project register as project no. 2674 on 9 Jun 2023","verified","registry","https://dubairealestateiq.com/project/naya-at-district-one"],["Escrow account held at Dubai Islamic Bank","verified","registry","https://dubairealestateiq.com/project/naya-at-district-one"],["Construction stage: 56% built at DLD inspection on 22 Jul 2026","verified","registry","https://dubairealestateiq.com/project/naya-at-district-one"],["Developer entity District One - Fz registered with DLD (developer no. 956)","verified","registry","https://dubairealestateiq.com/project/naya-at-district-one"],["Project has 456 units on the register","verified","registry","https://dubairealestateiq.com/project/naya-at-district-one"],["Developer group track record on DLD: 40 finished projects (45 total, 3 active)","verified","registry","https://dubairealestateiq.com/developer/meydan"],["RERA progress 56% at 22 Jul 2026 (developer page)","verified","registry","https://dubairealestateiq.com/project/naya-at-district-one"],["Delivery June 2027 (Property Finder)","contradicted","registry","https://dubairealestateiq.com/project/naya-at-district-one"],["Superstructure 100% complete (developer)","unverified","none","https://www.nakheel.com/en/construction-progress/naya-at-district-one"],["Launch price from AED 1.7M","unverified","none","https://www.propertyfinder.ae/en/new-projects/nakheel/naya-at-district-one"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/nakheel/naya-at-district-one"],["DLD project register: project 2674, status Active, completion date on the register 30 Sep 2027, 56% built at the DLD inspection of 22 Jul 2026, escrow account bank Dubai Islamic Bank, registered developer District One - Fz (DLD developer 956) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/naya-at-district-one"]],"rvw":null}},"nayamara-thevelopers":{"set":{"rvw":null}},"nebessa-kvart-belgrade":{"set":{"rvw":null}},"neptune-interiors-by-mouawad-dar-global":{"set":{"rvw":null}},"next-gardens-kvariati-next-group":{"set":{"rvw":null}},"nezihpark-bahcekent-aydur-insaat":{"set":{"rvw":null}},"nichakul-villas-lamai":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"press"},"miss":null}}},"nidapark-kucukyali-buyukada-tahincioglu":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Turkey","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2028-Q2) was not re-checked.","https://www.nidaparkkucukyali.com/"],"co":null,"sq":{"handover":"registry","permit":"registry","price":"portal"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"nikki-beach-residences-antigua-ayre":{"set":{"rvw":null}},"nine-collective-wasl":{"set":{"rvw":null}},"nirvana-residences-i-meraki":{"set":{"cl":[["Registered with DLD (project 4313)","verified","registry","https://dubairealestateiq.com/project/nirvana-residences-i"],["Escrow account (Dubai Islamic Bank)","verified","registry","https://dubairealestateiq.com/project/nirvana-residences-i"],["392 units","contradicted","registry","https://dubairealestateiq.com/project/nirvana-residences-i"],["Completion Q4 2028","verified","registry","https://dubairealestateiq.com/project/nirvana-residences-i"],["Listed by agents as 'Under Construction'","contradicted","registry","https://dubairealestateiq.com/project/nirvana-residences-i"],["Studios from about AED 711k to 781k (registered studio median AED 762k)","verified","registry","https://dubairealestateiq.com/project/nirvana-residences-i"],["10% guaranteed net ROI for 5 years on full payment","unverified","none","https://www.propertyfinder.ae/en/plp/buy/apartment-for-sale-dubai-dubai-production-city-impz-nirvana-residences-i-129295166.html"],["Developer buys back at 125% of price on handover","unverified","none","https://www.propertyfinder.ae/en/plp/buy/apartment-for-sale-dubai-dubai-production-city-impz-nirvana-residences-i-112831411.html"],["Projected 8% annual rental yield","unverified","none","https://www.merakidevelopers.com/projects/nirvana-residences-i"],["Developer has completed projects (The Haven, Genesis)","verified","registry","https://dubairealestateiq.com/developer/meraki"],["LEED Gold certified building","unverified","none","https://www.merakidevelopers.com/projects/nirvana-residences-i"],["DLD project register: project 4313, status Active, completion date on the register 31 Dec 2028, 0.04% built at the DLD inspection of 12 Aug 2026, escrow account bank Dubai Islamic Bank, registered developer Meraki Real Estate Development L.L.C (DLD developer 1230) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/nirvana-residences-i"]],"rvw":null}},"no-published-name-domisi-listing-luxury-villa-project-under":{"set":{"rvw":null}},"noah-sumba-anta-group":{"set":{"rvw":null}},"noba-homes-v-esplugues-neinor":{"set":{"rvw":null}},"nobe-parc-miami":{"set":{"rvw":null}},"nobia-dua-villas-zayari-developments":{"set":{"rvw":null}},"nobilus-algarve":{"set":{"rvw":null}},"nobu-residences-al-marjan-enevoria":{"set":{"cl":[["Project listed by RAK RERA as 'NOBU Hotel and Residences Al Marjan Island', developer Enevoria Development FZ-LLC, In progress","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["Nobu Hospitality signed management agreement with Enevoria Development FZ-LLC (Jan 2023)","verified","independent","https://www.thenationalnews.com/travel/hotels/2023/01/31/nobu-hotel-and-residences-to-open-in-ras-al-khaimah/"],["70,000 m2 built-up area, 282 residences in two towers","verified","independent","https://www.constructionweekonline.com/news/design-consultant-nobu-hotel-residences-al-marjan-island"],["300 branded residences","contradicted","independent","https://www.constructionweekonline.com/news/design-consultant-nobu-hotel-residences-al-marjan-island"],["Construction started Dec 2023","unverified","none","https://www.projectsscout.com/ae/en/project/hh-development/nobu-hotel-residences-al-marjan-island"],["Handover Q1 2028","unverified","none","https://www.bayut.com/buildings/nobu-residences/"],["First-phase owners to move in at end of 2026 (earlier agent claim)","contradicted","none","https://opr.ae/projects/nobu-residences-al-marjan-island-by-hh"],["2BR from AED 4.8M, 22 developer units remaining (Oct 2026)","unverified","none","https://rakcompare.ae/project/nobu-hotel-and-residences"],["Escrow account","unverified","none","https://nr-almarjan.com/"],["Payment plan (10/50/40 vs 5/65/30 vs 50/50)","contradicted","none","https://www.bayut.com/buildings/nobu-residences/"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"NOBU Hotel and Residences Al Marjan Island\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"NOBU Hotel and Residences Al Marjan Island\", In progress), read 13 Nov 2026","escrow":"Not stated on developer site or agent pages opened","progress":"No % or dated site updates; agents give construction start Dec 2023 only","plans":"Floor plans for available 2BR, 3BR and villa types on RAKcompare from the developer release","record":"Enevoria has no named completed project on pages opened; H&H (development manager, est. 2007) delivered record not verified","returns_ok":"No guaranteed returns; one agent (opr.ae) projects 15-20% resale profit, not developer language"},"rvw":null}},"nobu-residences-danang-circle-point":{"set":{"rvw":null}},"nobu-residences-manchester-salboy":{"set":{"rvw":null}},"noda-flores-noda-collective":{"set":{"rvw":null}},"nordale-phase-1-riga":{"set":{"rvw":null}},"norea-square-condominium-ocic":{"set":{"rvw":null}},"north-tower-fg-balneario-camboriu":{"set":{"rvw":null}},"nouvelle-vague-antibes-kaufman-broad":{"set":{"rvw":null}},"nova-city-residence-budapest":{"set":{"rvw":null}},"novigrad-vidal-luxury-residential-complex":{"set":{"rvw":null}},"nuba-el-gouna-orascom-development-egypt":{"set":{"rvw":null}},"numandi-residences-consudespro-armabloque":{"set":{"rvw":null}},"nyala-villas-ko-group":{"set":{"rvw":null}},"oak-at-sodic-east":{"set":{"rvw":null}},"oak-yard-one-yard":{"set":{"rvw":null}},"oase-meloneras-aedas":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["none","The developer page shows the sales and works status but prints no delivery date; the date on record (Q2 2027) comes from press.","https://www.aedashomes.com/en/new-homes-for-sale-oase-las-palmas-gran-canaria"],"co":null,"sq":{"handover":"press","permit":"developer","price":"developer","developer":"portal"},"miss":null}}},"oasia-french-riviera":{"set":{"rvw":null}},"oasis-iii":{"set":{"rvw":null}},"oasis-sumba-pma-oasis-holding":{"set":{"rvw":null}},"obsidian-greengate-salboy-domis":{"set":{"rvw":null}},"ocean-drive-beachfront-residences-four-seasons-puerto-rico":{"set":{"rvw":null}},"ocean-hills-los-cristianos-esferica-inversiones":{"set":{"rvw":null}},"ocean-pearl-swakopmund-pha-property":{"set":{"rvw":null}},"ocean-tulum-grupo-vinsa":{"set":{"rvw":null}},"oceana-wellness-residences-los-cabos":{"set":{"rvw":null}},"oceaniq-nusa-dua-ii-oceaniq":{"set":{"rvw":null}},"oceano-villas-madeira":{"set":{"rvw":null}},"oceanz-by-danube-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/danube-properties/oceanz"],["DLD project register: project 2755, status Active, no completion date on the register, 50.04% built at the DLD inspection of 25 Aug 2026, escrow account bank The National Bank Of Fujairah P S C, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/oceanz-1-by-danube"]],"ev":{"permit":"Registered as DLD project 2755, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank The National Bank Of Fujairah P S C (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 25 Aug 2026: 50.04% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Danube Properties Development L.L.C (DLD developer 1009)"},"pn":"DLD project registration 2755","rvw":null,"src":["https://danubeproperties.com/portfolio/oceanz/","https://www.propertyfinder.ae/en/new-projects/danube-properties/oceanz","https://dubairealestateiq.com/project/oceanz-1-by-danube"]}},"octasun":{"set":{"rvw":null}},"odom-living-urban-living-solutions":{"set":{"rvw":null}},"ogami-nobu-ras-el-hekma":{"set":{"rvw":null}},"okan-tower-miami":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR76808 \"OKAN TOWER MIAMI RESIDENTIAL CONDO\", developer entity MIAMI 6TH ST LLC","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["50 of 72 floors complete, about 75% structural completion (Apr 2026)","verified","independent","https://floridayimby.com/2026/04/construction-reaches-50th-floor-on-okan-tower-at-555-north-miami-avenue-in-downtown-miami.html"],["Top-off expected August 2026","unverified","none","https://own.miami/downtown/news/okan-tower-status-october-2026"],["Completion 2026 (2022 release) vs 2027 vs 2028 (2026 reports)","contradicted","independent","https://thedailycheckout.org/post/okan-tower-hilton-downtown-miami-2028"],["USD 200m C-PACE loan from Bayview PACE closed Jan 2026","verified","independent","https://joshsteinrealtor.com/new-construction/okan-tower/"],["About 62% presold (Jan 2026)","unverified","independent","https://own.miami/downtown/news/okan-tower-status-october-2026"],["Master construction permit approved (2025)","verified","independent","https://southfloridaagentmagazine.com/2025/08/18/okan-tower-master-construction-permit/"],["Storey count: 70 (2022 release) vs 72 (2026 reports)","contradicted","independent","https://thedailycheckout.org/post/okan-tower-hilton-downtown-miami-2028"],["Office space 56,000 vs 60,000 vs 64,000 sq ft","contradicted","independent","https://joshsteinrealtor.com/new-construction/okan-tower/"],["County still lists folio 01-0106-030-1060 as vacant commercial land (2026 roll)","verified","registry","https://joshsteinrealtor.com/new-construction/okan-tower/"],["Hilton rental programme participation voluntary","unverified","none","https://joshsteinrealtor.com/new-construction/okan-tower/"],["Fatal column collapse on 1 June 2026, OSHA investigating","verified","independent","https://southfloridaagentmagazine.com/2026/05/11/okan-tower-50-stories/"]],"ev":{"permit":"Florida DBPR developer summary (official CSV, read 13 Nov 2026): PR76808 OKAN TOWER MIAMI RESIDENTIAL CONDO by MIAMI 6TH ST LLC","escrow":"Florida law requires condo deposit escrow, but no escrow agent or terms are published","progress":"Independent press: 40th floor Jan 2026, about level 48 Mar 2026, 50th floor and 75% structure 22 Apr 2026","plans":"Developer unit matrix by floor and layouts on the sales site (as described by an agent page)","returns_ok":"Hilton rental programme described as entirely voluntary with rates set by the hotel; no yield or guarantee"},"pn":"Florida DBPR condominium filing PR76808","rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["not checked","date on record 2028 not re-checked on the review date",null],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"developer","permit":"registry","developer":"registry"},"miss":["handover status not resolved"]},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR76808","code":"PR76808","checked":"2026-11-13"},"src":["https://floridayimby.com/2026/04/construction-reaches-50th-floor-on-okan-tower-at-555-north-miami-avenue-in-downtown-miami.html","https://hotelpost.org/post/okan-tower-pours-50th-floor-downtown-miami","https://joshsteinrealtor.com/new-construction/okan-tower/","https://own.miami/downtown/news/okan-tower-status-october-2026","https://profilemiami.com/miamirealestate/2026/4/27/okan-tower-reaches-75-structural-completion-as-construction-passes-50th-floor-in-downtown-miami","https://southfloridaagentmagazine.com/2025/08/18/okan-tower-master-construction-permit/","https://southfloridaagentmagazine.com/2026/05/11/okan-tower-50-stories/","https://thedailycheckout.org/post/okan-tower-hilton-downtown-miami-2028","https://www.citybiz.co/article/835151/race-to-the-top-downtown-miamis-supertall-okan-tower-reaches-75-structural-completion/","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"]}},"olana-naples-residences":{"set":{"rvw":null}},"olara-palm-beach-county":{"set":{"rvw":null}},"oliu-capdepera-taylor-wimpey-espana":{"set":{"cl":[["23 apartments and 9 townhouses of 2 bedrooms","unverified","none","https://taylorwimpeyspain.com/es/casa/oliu-capdepera-mallorca/"],["Delivery 2 Nov 2027","unverified","none","https://taylorwimpeyspain.com/es/casa/oliu-capdepera-mallorca/"],["Under construction, progress video July 2026","unverified","none","https://taylorwimpeyspain.com/es/casa/oliu-capdepera-mallorca/"],["Prices from EUR 499,000 for an 89.2 m2 ground-floor apartment","unverified","none","https://taylorwimpeyspain.com/es/casa/oliu-capdepera-mallorca/"],["Payments on account by poliza or aval under the LOE","unverified","none","https://taylorwimpeyspain.com/es/guia-compra/"],["In Spain since 1958, part of Taylor Wimpey plc, over 7,000 customers","unverified","none","https://catalog.taylorwimpeyspain.com/wp-content/uploads/2025/07/TWE_OLIU_impres_ES.pdf"],["Taylor Wimpey's Spanish business completed 494 homes in 2025 (2024: 504), selling mainly second homes to international buyers","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["Initial energy certificate registered for the building (Can Moll)","unverified","none","https://taylorwimpeyspain.com/wp-content/uploads/2025/05/Justificante_de_certificacion_energetica_de_edificio-INICIAL-CAN-MOLL.pdf"],["Underground parking, communal pool, aerothermal heating, solar thermal panels","unverified","none","https://taylorwimpeyspain.com/wp-content/uploads/2025/05/OLIU-Memoria-calidades-ES_Sept2026_compressed.pdf"],["Building licence granted by Capdepera council","unverified","none","https://taylorwimpeyspain.com/es/casa/oliu-capdepera-mallorca/"],["Sold directly by the developer","unverified","none","https://taylorwimpeyspain.com/es/casa/oliu-capdepera-mallorca/"],["The developer page read on 13 Nov 2026 prints: \"Entrega prevista: Noviembre 2027\"","unverified","none","https://taylorwimpeyspain.com/es/casa/oliu-capdepera-mallorca/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Entrega prevista: Noviembre 2027\"","https://taylorwimpeyspain.com/es/casa/oliu-capdepera-mallorca/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"olive-farms-by-raya-jebel-sifah-muriya":{"set":{"rvw":null}},"olvera-bloom-living-zayed-city":{"set":{"rvw":null}},"omen-tulum-omen-tulum-development-s-c-de-p-de-b-y-s-de-r-l-de-c-v":{"set":{"rvw":null}},"once-wongamat-honour-thailand":{"set":{"rvw":null}},"one-and-only-private-homes-fiji":{"set":{"rvw":null}},"one-batumi-one-development":{"set":{"rvw":null}},"one-by-binghatti":{"set":{"cl":[["FAQ answer on the page: \"One by Binghatti is expected to be completed by Q4 2026.\"","unverified","none","https://www.binghatti.com/en/projects/one-by-binghatti"],["61 residential floors, 3 basement levels, 2 podium levels, 1 amenity floor and a roof","unverified","none","https://www.binghatti.com/en/projects/one-by-binghatti"],["Payment plan on the page ends with 30% on completion","unverified","none","https://www.binghatti.com/en/projects/one-by-binghatti"],["Location published: waterfront in Business Bay","unverified","none","https://www.binghatti.com/en/projects/one-by-binghatti"],["DLD project register: project 3107, status Active, completion date on the register 30 May 2026, 50.21% built at the DLD inspection of 14 May 2026, escrow account bank Sharjah Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/one-by-binghatti"],["The developer page read on 13 Nov 2026 prints: \"When is the completion date for One by Binghatti? One by Binghatti is expected to be completed by Q4 2026\"","unverified","none","https://www.binghatti.com/en/projects/one-by-binghatti"]],"ev":{"permit":"Registered as DLD project 3107, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Sharjah Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 14 May 2026: 50.21% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2026-Q4","unit_types":["apartment"]},"pn":"DLD project registration 3107","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/one-by-binghatti"],"ho":["passed-late","DLD register completion 30 May 2026; 50.21% built at the inspection of 14 May 2026; developer page: \"When is the completion date for One by Binghatti? One by Binghatti is expected to be completed by Q4 2026\"","https://dubairealestateiq.com/project/one-by-binghatti"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/one-by-binghatti"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.binghatti.com/en/projects/one-by-binghatti","https://dubairealestateiq.com/project/one-by-binghatti"]}},"one-central-saigon-ritz-carlton-residences-saigon-glory":{"set":{"rvw":null}},"one-city-osaka":{"set":{"rvw":null}},"one-delta-terraces":{"set":{"rvw":null}},"one-hanazono-villas-niseko":{"set":{"rvw":null}},"one-lady-bird-lake-related-texas":{"set":{"rvw":null}},"one-only-mandarina-private-homes-rlh-properties-s-a-b-de-c-v":{"set":{"rvw":null}},"one-pieta-malta":{"set":{"rvw":null}},"one-river-point-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/ellington/one-river-point"],["DLD project register: project 2929, status Active, completion date on the register 9 Jun 2027, 35.43% built at the DLD inspection of 21 Jul 2026, escrow account bank Emirates Nbd Bank, registered developer Dutco Ellington Canal Front Real Estate L.L.C (DLD developer 1647) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/one-river-point"]],"ev":{"permit":"Registered as DLD project 2929, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 21 Jul 2026: 35.43% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Dutco Ellington Canal Front Real Estate L.L.C (DLD developer 1647)","handover_promised":"2027-Q2"},"pn":"DLD project registration 2929","rvw":null,"src":["https://ellingtonproperties.ae/en/property-for-sale/one-river-point-business-bay","https://www.propertyfinder.ae/en/new-projects/ellington/one-river-point","https://dubairealestateiq.com/project/one-river-point"]}},"one-seputeh-residences-kl":{"set":{"rvw":null}},"one-tampa-kolter-urban":{"set":{"rvw":null}},"one-true-blue-beach-goldblat":{"set":{"rvw":null}},"onto-reforma-colon-sede-desarrollos":{"set":{"rvw":null}},"onto-residences-versalles-106-sede-desarrollos":{"set":{"rvw":null}},"opal-residence-muscat-hills-al-nama":{"set":{"rvw":null}},"opus-bankside-yards-native-land":{"set":{"rvw":null}},"ora-by-casa-tua-fortune":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77595 \"1210 BRICKELL CONDO\", developer entity 1210 BRICKELL DEVELOPMENT LLC (matched by the street address in the project name)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Construction to start 2025 (2024 statement), then by end Q1 2026","contradicted","independent","https://therealdeal.com/miami/2025/08/20/fortune-taps-eb-5-for-ora-by-casa-tua-brickell-tower/"],["Construction start Q4 2027 (same broker FAQ lists groundbreaking deposit at Q1 2027)","contradicted","none","https://orabycasatuavip.com/ora-by-casa-tua-faq/"],["Completion Q4 2030 (2024 press: delivery 2028)","contradicted","independent","https://www.hauteresidence.com/fortune-international-group-closes-on-36-08m-pre-development-financing-loan-for-their-latest-brickell-project/"],["Site acquired and USD 36.08m pre-development loan from Amerant Bank","verified","independent","https://therealdeal.com/miami/2024/07/10/fortune-scores-36m-loan-for-casa-tua-condo-tower-in-brickell/"],["About 45% presold (July 2024)","unverified","none","https://therealdeal.com/miami/2024/07/10/fortune-scores-36m-loan-for-casa-tua-condo-tower-in-brickell/"],["Construction permit application filed 19 Jun 2025","verified","independent","https://floridayimby.com/2025/07/new-construction-permit-application-filed-for-78-story-ora-by-casa-tua-in-brickell-miami.html"],["533 units on 77 floors (official site says 540; permit application 78 storeys)","contradicted","independent","https://www.hauteresidence.com/news/ora-by-casa-tua-540-residences-in-a-77-story-brickell-tower/"],["Deposits held in escrow with First American Title","unverified","none","https://orabycasatuavip.com/ora-by-casa-tua-faq/"],["EB-5 designation filed with USCIS","unverified","none","https://therealdeal.com/miami/2025/08/20/fortune-taps-eb-5-for-ora-by-casa-tua-brickell-tower/"],["Fortune completed Jade Signature (192 units) in 2018","verified","independent","https://therealdeal.com/miami/2018/02/01/fortune-international-group-and-premier-developers-complete-two-major-condo-projects/"],["Prices from USD 990k (TRD Aug 2025: from USD 900k; launch 2023: from 800k)","verified","independent","https://therealdeal.com/miami/2025/08/20/fortune-taps-eb-5-for-ora-by-casa-tua-brickell-tower/"],["Short-term rental allowed, 3-night minimum","verified","independent","https://therealdeal.com/miami/2025/08/20/fortune-taps-eb-5-for-ora-by-casa-tua-brickell-tower/"]],"ev":{"permit":"Florida DBPR developer summary (official CSV, read 13 Nov 2026): PR77595 1210 BRICKELL CONDO by 1210 BRICKELL DEVELOPMENT LLC","escrow":"Broker FAQ names First American Title as escrow and title agent, non-interest account","progress":"Not started: broker FAQ gives construction start Q4 2027; independent reports found no groundbreaking, contractor or construction loan as of Sep-Oct 2026","plans":"Broker site refers to floor plans page; not reviewed, none on developer pages seen","record":"The Real Deal (2018) confirms Jade Signature completed, Fortune's fourth Jade building","returns_ok":"Short-term rentals allowed with 3-night minimum; no return figures or guarantee"},"pn":"Florida DBPR condominium filing PR77595","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["future","date on record 2030-Q4; developer page read on 13 Nov 2026: \"When do you expect construction to be completed? Mid-2030\"","https://orabycasatuavip.com/ora-by-casa-tua-faq/"],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"press","permit":"registry","price":"press","developer":"registry"},"miss":null},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77595","code":"PR77595","checked":"2026-11-13"},"src":["https://floridayimby.com/2024/07/site-and-financing-secured-for-77-story-ora-by-casa-tua-in-miamis-brickell-financial-district.html","https://floridayimby.com/2025/07/new-construction-permit-application-filed-for-78-story-ora-by-casa-tua-in-brickell-miami.html","https://fortuneintlgroup.com/our-story/","https://joshsteinrealtor.com/new-construction/ora-by-casa-tua/","https://orabycasatuavip.com/ora-by-casa-tua-faq/","https://therealdeal.com/miami/2018/02/01/fortune-international-group-and-premier-developers-complete-two-major-condo-projects/","https://therealdeal.com/miami/2023/03/09/fortunes-ora-by-casa-tua-launches-sales-of-short-term-rental-condo-tower-in-brickell/","https://therealdeal.com/miami/2024/07/10/fortune-scores-36m-loan-for-casa-tua-condo-tower-in-brickell/","https://therealdeal.com/miami/2025/08/20/fortune-taps-eb-5-for-ora-by-casa-tua-brickell-tower/","https://www.hauteresidence.com/fortune-international-group-closes-on-36-08m-pre-development-financing-loan-for-their-latest-brickell-project/","https://www.hauteresidence.com/news/ora-by-casa-tua-540-residences-in-a-77-story-brickell-tower/","https://www.rehubmiami.com/blog/ora-casa-tua-brickell-guide","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"]}},"ora-residences-db-group":{"set":{"rvw":null}},"orchard-hill-sycamore":{"set":{"rvw":null}},"orchid-bahrain-bay-orchid-developers":{"set":{"rvw":null}},"oreade-french-alps":{"set":{"rvw":null}},"origin-place-centre-phuket":{"set":{"rvw":null}},"orion-apartments-observatory-leisure-group":{"set":{"rvw":null}},"orla-dorchester-collection-omniyat":{"set":{"cl":[["Registered with DLD (project 2455)","verified","registry","https://dubairealestateiq.com/project/orla-by-omniyat"],["Escrow account (Mashreq Bank)","verified","registry","https://dubairealestateiq.com/project/orla-by-omniyat"],["On track for originally projected completion in Q2 2026 (developer, Feb 2024)","contradicted","registry","https://dubairealestateiq.com/project/orla-by-omniyat"],["Handover Q4 2026 (agents), 70% built Aug 2026","verified","registry","https://dubairealestateiq.com/project/orla-by-omniyat"],["Construction progress 48% (Prop971) and 60% (JRE) shown on portals, behind the latest DLD figure","contradicted","registry","https://www.prop971.com/project/PRJ-OMN-GFSPL"],["Groundbreaking April 2023; register start date 31 Jan 2023","verified","registry","https://dubairealestateiq.com/project/orla-by-omniyat"],["90 units (register) vs 85 homes plus Sky Palaces and mansion (developer) vs 93 homes (agent)","verified","registry","https://dubairealestateiq.com/project/orla-by-omniyat"],["Omniyat has finished projects on the register","verified","registry","https://dubairealestateiq.com/developer/omniyat"],["Managed by Dorchester Collection","unverified","none","https://omniyat.com/news/the-commencement-of-main-works-on-orla-dorchester-collection-dubai"],["4BR from AED 57.23m (AED 7,726 per sq ft)","unverified","none","https://www.prop971.com/project/PRJ-OMN-GFSPL"],["DLD project register: project 2455, status Active, completion date on the register 31 Dec 2026, 70.01% built at the DLD inspection of 21 Aug 2026, escrow account bank Mashreq Bank Psc, registered developer Crescent 17 Real Estate Developments L.L.C (DLD developer 1459) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/orla-by-omniyat"]],"rvw":null}},"ornelas-legacy-madeira":{"set":{"rvw":null}},"osiedle-arkadia":{"set":{"rvw":null}},"osiedle-bokserska-71":{"set":{"rvw":null}},"osiedle-miedzyleska":{"set":{"rvw":null}},"osiedle-mysliborska":{"set":{"rvw":null}},"osiedle-palladium":{"set":{"rvw":null}},"osiedle-park-swietlikow":{"set":{"rvw":null}},"osiedle-przy-wielickiej":{"set":{"rvw":null}},"osiedle-urbino":{"set":{"rvw":null}},"osiedle-wilno":{"set":{"rvw":null}},"osiedle-zielna":{"set":{"rvw":null}},"osten-tower-ii-gnv-group":{"set":{"rvw":null}},"oxo-the-residences-nyanyi":{"set":{"rvw":null}},"oystra-richmind":{"set":{"cl":[["Project registered with RAK RERA (Richmind Development FZ-LLC), In progress","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["Construction started (groundbreaking late Nov 2025)","verified","independent","https://www.arabianbusiness.com/industries/construction/richmind-breaks-ground-on-landmark-oystra-after-phase-one-sellout"],["Construction started 22 Apr 2025 (Property Finder)","contradicted","independent","https://www.arabianbusiness.com/industries/construction/richmind-breaks-ground-on-landmark-oystra-after-phase-one-sellout"],["Shoring works complete (Oct 2026)","verified","independent","https://www.gulfconstructiononline.com/Article/488876/zha-designed-oystra-marks-milestone"],["850 residences","contradicted","independent","https://www.gulfconstructiononline.com/Article/488876/zha-designed-oystra-marks-milestone"],["Phase 1 sold out before groundbreaking","unverified","none","https://richmind.com/oystra-al-marjan-island-groundbreaking/"],["Handover 2029","unverified","none","https://www.propertyfinder.ae/en/new-projects/richmind/oystra"],["Developer has delivered projects in the UAE","contradicted","independent","https://www.zawya.com/en/press-release/companies-news/richmind-advances-oystra-construction-in-ras-al-khaimah-and-unveils-gensler-designed-luxury-experience-centre-in-dubai-1563893"],["Escrow account","unverified","none","https://www.propertyfinder.ae/en/new-projects/richmind/oystra"],["Starting price AED 2,586,888","unverified","none","https://www.propertyfinder.ae/en/new-projects/richmind/oystra"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Oystra\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["The developer page read on 13 Nov 2026 prints: \"Construction is on track for handover in 2029\"","unverified","none","https://richmind.com/oystra-al-marjan-island-groundbreaking/"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["listed","RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"ho":["future","developer page: \"Construction is on track for handover in 2029\"","https://richmind.com/oystra-al-marjan-island-groundbreaking/"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"portal","developer":"registry"},"miss":null},"url":"https://richmind.com/oystra-al-marjan-island-groundbreaking/"}},"ozalia-temozon-grupo-acber":{"set":{"rvw":null}},"p-tersala-buildings-fera-amia-valensis-selonija-riga":{"set":{"rvw":null}},"pafilia-plaza-pafilia":{"set":{"rvw":null}},"paje-square":{"set":{"rvw":null}},"palace-residences-marassi-al-bahrain-eagle-hills":{"set":{"rvw":null}},"palm-beach-residences-cap-cana-rdls":{"set":{"rvw":null}},"palm-jebel-ali-frond-a-villas":{"set":{"rvw":null}},"palm-square":{"set":{"rvw":null}},"palmares-signature-apartments-ii":{"set":{"rvw":null}},"palmera-residences-central-equity":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","official register for Gold Coast not looked up on the review date","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2029 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: official register for Gold Coast not looked up on the review date","handover status not resolved"]}}},"palmyra-siargao-wellbuild":{"set":{"rvw":null}},"palmyra-west":{"set":{"rvw":null}},"palo-alto-villas-palo-alto-marbella":{"set":{"rvw":null}},"panorama-by-elie-saab-baku":{"set":{"rvw":null}},"papyrus-north-kiara-kuala-lumpur":{"set":{"rvw":null}},"paradiso-place-spg-land":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","official register for Gold Coast not looked up on the review date","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2029-Q4 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: official register for Gold Coast not looked up on the review date","handover status not resolved"]}}},"paragon-lic":{"set":{"rvw":null}},"paramount-signature-nha-trang-vega-city-kdi":{"set":{"rvw":null}},"paravian-riviera-maya":{"set":{"rvw":null}},"parc-avignon":{"set":{"rvw":null}},"parc-de-sienne":{"set":{"rvw":null}},"parenthese":{"set":{"rvw":null}},"park-court-ochanomizu-the-tower":{"set":{"rvw":null}},"park-homes-funabashi":{"set":{"rvw":null}},"park-hyatt-los-cabos-residences-cabo-del-sol":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["passed-unconfirmed","date on record 2025-Q4 has passed; no source read on the review date confirms delivery",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)"]}}},"park-lane-apartments-cherrywood-evara":{"set":{"rvw":null}},"park-residences-nicosia":{"set":{"rvw":null}},"park-rise-ellinikon-lamda":{"set":{"cl":[["Park Rise under construction","verified","independent","https://hellinikimeletitiki.gr/en/park-rise.html"],["Estimated completion H1 2028","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/park-rise"],["88 residences","contradicted","independent","https://athens.euronext.com/sites/default/files/hermes_3/2026-07/en/20864c1b-c4fd-44f8-864c-1bc4fd04f8ce/274_5109_2026_English_2.pdf"],["81% of Little Athens launched units sold or reserved at 31 Aug 2026","verified","independent","https://www.economix.gr/2026/09/17/lamda-development-xepernoun-ta-18-dis-evro-oi-eispraxeis-apo-poliseis-akiniton-sto-elliniko-prochoroun-ta-2-malls/"],["Developer is a listed company with audited results","verified","registry","https://athens.euronext.com/sites/default/files/hermes_3/2026-09/en/eb0d0023-5afe-4177-8d00-235afec17706/274_6647_2026_English_2.pdf"],["Building permit issued","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/park-rise"],["LEED Gold certification","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/park-rise"],["No nationality restrictions on purchase","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/park-rise"],["Deposit protection","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/park-rise"],["Designed by Bjarke Ingels Group, 28,772 m2","verified","independent","https://big.dk/projects/ellinikon-park-rise-16186"],["The developer page read on 13 Nov 2026 prints: \"ESTIMATED COMPLETION DATE: H1 2028\"","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/park-rise"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Greece","https://kolaboro.com/registers/"],"ho":["future","developer page: \"ESTIMATED COMPLETION DATE: H1 2028\"","https://theellinikon.com.gr/en/residences/little-athens/park-rise"],"co":null,"sq":{"handover":"developer","permit":"developer","developer":"developer"},"miss":null}}},"park-tower-osaka-tenmabashi":{"set":{"rvw":null}},"park-ya-am-antalya-antalya":{"set":{"rvw":null}},"parkside-residences-at-brickell":{"set":{"rvw":null}},"parkside-residences-montenegro":{"set":{"rvw":null}},"parkstadt-portitz":{"set":{"rvw":null}},"parkview-residence-limar-homes":{"set":{"rvw":null}},"parq-blue-bali":{"set":{"rvw":null}},"parq-ubud-tegallalang":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["passed-unconfirmed","date on record 2025-Q3 has passed; no source read on the review date confirms delivery",null],"co":null,"sq":{"handover":"press","price":"developer","developer":"press"},"miss":null}}},"passage-amador-eleta-marjalizo":{"set":{"rvw":null}},"pavilion-damansara-heights-phase-2-imperial-residences-and-r":{"set":{"rvw":null}},"pavilion-damansara-heights-phase-2-jendela-mayang":{"set":{"rvw":null}},"pavilion-square-kuala-lumpur-armani-hartajaya":{"set":{"rvw":null}},"pavilion-terraces-the-ellinikon-little-athens":{"set":{"rvw":null}},"pearl-house-4-imtiaz-jvc":{"set":{"cl":[["Registered on the DLD project register as project no. 4129 on 11 Oct 2025","verified","registry","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],["Escrow account held at First Abu Dhabi Bank","verified","registry","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],["Construction stage: 17.93% built at DLD inspection on 7 Oct 2026","verified","registry","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],["Developer entity Imtiaz Luxury Real Estate Development L.L.C registered with DLD (developer no. 2259)","verified","registry","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],["Project has 211 units on the register","verified","registry","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],["Developer group track record on DLD: 10 finished projects (46 total, 36 active)","verified","registry","https://dubairealestateiq.com/developer/imtiaz"],["Construction progress 21% overall (developer)","contradicted","registry","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],["Estimated completion Q4 2027 (developer)","contradicted","registry","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],["Fully furnished units","unverified","none","https://imtiaz.ae/property/pearl-house-4-by-imtiaz"],["Price from AED 1.3M","unverified","none","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-imperial-garden"],["DLD project register: project 4129, status Active, completion date on the register 29 Feb 2028, 17.93% built at the DLD inspection of 7 Oct 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Luxury Real Estate Development L.L.C (DLD developer 2259) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],["The developer page read on 13 Nov 2026 prints: \"construction progress 23 overall ESTIMATED COMPLETION DATE Q4 2027\"","unverified","none","https://imtiaz.ae/property/pearl-house-4-by-imtiaz"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],"ho":["future","DLD register completion 29 Feb 2028; 17.93% built at the inspection of 7 Oct 2026; developer page: \"construction progress 23 overall ESTIMATED COMPLETION DATE Q4 2027\"","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/pearl-house-iv-by-imtiaz"],"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":null}}},"pedras-negras-house-ando-living":{"set":{"rvw":null}},"pelagia-al-marjan-bnw":{"set":{"cl":[["Pelagia listed on RAK RERA 2026 project list, In progress, developer Maya Real Estate Partners FZ LLC","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["Project developed by BNW Developments","contradicted","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["Launched Feb 2025, about 160 units, completion Dec 2027","verified","independent","https://meconstructionnews.com/62333/bnw-developments-unveils-pelagia-at-al-marjan-island"],["Foundations and basements complete, structure rising (Sep 2026)","unverified","none","https://www.tradingview.com/news/reuters.com,2026-09-01:newsml_Zaw34KtJl:0-bnw-developments-to-start-handing-over-first-ras-al-khaimah-units-in-2027/"],["MAN Construction (Masah Group) is main contractor across major BNW sites","verified","independent","https://www.constructionweekonline.com/news/bnw-man-construction-partner-for-the-waterfront-luxury-project-in-rak"],["BNW has no delivered project yet","verified","independent","https://propertynivesh.in/developers/bnw-developments"],["Starting price AED 2.3M","unverified","none","https://bnw.ae/en/projects"],["Escrow account","unverified","none","https://bnw.ae/en/projects/pelagia"],["All apartments fully furnished","unverified","none","https://meconstructionnews.com/62333/bnw-developments-unveils-pelagia-at-al-marjan-island"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"PELAGIA\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"PELAGIA\", In progress), read 13 Nov 2026","escrow":"Nothing published","progress":"Dated statements: Gulf News focus (31 Mar 2026) site preparation concluding; Zawya interview (1 Sep 2026) foundations and basements complete","plans":"Only minimum sizes per type published; no floor plans on pages opened (developer page renders only via script)","record":"No completed project; first handovers expected 2027 (developer statement)","returns_ok":"Developer projects page mentions 'strong ROI potential' for another project; no guaranteed returns for Pelagia"},"rvw":null}},"pendry-residences-barbados-port-ferdinand":{"set":{"rvw":null}},"pendry-residences-mexico-city-grupo-tgt-grupo-mrp-and-central-de-arqui":{"set":{"rvw":null}},"pendry-residences-nashville-someraroad":{"set":{"rvw":null}},"penha-living-bolder-addsolid":{"set":{"rvw":null}},"peninsula-rise-kelvin-heights":{"set":{"rvw":null}},"perlita-gardens-udc":{"set":{"rvw":null}},"peylaa-phuket-autograph-collection-capc":{"set":{"rvw":null}},"phoenix-rising-lagos":{"set":{"rvw":null}},"phu-my-hung-harmonie":{"set":{"rvw":null}},"piramal-revanta-rayansh-tower-mumbai":{"set":{"rvw":null}},"piyalepasa-istanbul-premium-polat":{"set":{"rvw":null}},"plathea-spain":{"set":{"rvw":null}},"playa-de-torres-villajoyosa-unnamed-developer":{"set":{"rvw":null}},"plover-park-namibia":{"set":{"rvw":null}},"poblado-central-ciudad-central":{"set":{"rvw":null}},"podstrana-modern-apartments-eurovilla":{"set":{"rvw":null}},"port-yves-palace-koh-rong":{"set":{"rvw":null}},"porters-palms-barbados":{"set":{"rvw":null}},"porto-algarve-beach-studios":{"set":{"rvw":null}},"portside-square-dubai":{"set":{"rvw":null}},"poseidonia-residences":{"set":{"rvw":null}},"prata-riverside-village-lisbon":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.pratariversidevillage.com/en/buildings/sunrise/"],"co":null,"sq":{"handover":"press","permit":"developer","price":"developer"},"miss":null}}},"premist-tower-senrioka":{"set":{"rvw":null}},"prima-residence-canggu":{"set":{"rvw":null}},"prime-accra-accra":{"set":{"rvw":null}},"prime-kadawatha":{"set":{"rvw":null}},"prime-melwa-port-city-marina":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Sri Lanka","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2030) comes from the sources listed on the page.","https://primemarina.lk/"],"co":null,"sq":{"handover":"developer","permit":"press","developer":"press"},"miss":null}}},"prime-villa-samui-supalai":{"set":{"rvw":null}},"priors-gate-birmingham-bunnywell-homes":{"set":{"rvw":null}},"prisma-grand-cayman-cayman-islands":{"set":{"rvw":null}},"prive-pererenan":{"set":{"rvw":null}},"proa-costa-del-sol":{"set":{"rvw":null}},"promenade-budva-minder":{"set":{"rvw":null}},"promenade-heights-ellinikon-lamda":{"set":{"rvw":null}},"prospect-place-south-battersea-power-station":{"set":{"rvw":null}},"proyecto-alejandria-inlevel":{"set":{"rvw":null}},"przystanek-pradnik":{"set":{"rvw":null}},"pty-residence-sai-1":{"set":{"cl":[["ONEP EIA register lists report 256704-35 for \"พีทีวาย 1 (PTY 1)\" with approval ทส 1009.5/21468 dated 29 Oct 2024 (register name \"PTY 1 (พีทีวาย 1)\", Chonburi, applicant company Sansiri PCL; matched by name and applicant, not by address)","verified","registry","https://eia.onep.go.th/services/web/open-api/eia-list?page=7"],["Developer construction-progress page (photos taken November 2026): overall progress 73%, expected completion May 2027; it states the EIA has been approved and a construction permit issued","verified","developer","https://www.sansiri.com/projectprogress/en/681"],["\"Expected completion date: May 2027\"","unverified","none","https://www.sansiri.com/projectprogress/en/681"],["Overall construction work 73% completed, updated 10 November 2026","unverified","none","https://www.sansiri.com/projectprogress/en/"],["The page states that the environmental impact assessment has been approved and a construction permit has been issued","unverified","none","https://www.sansiri.com/projectprogress/en/"]],"ev":{"permit":"Thailand ONEP EIA open register: report 256704-35, approval ทส 1009.5/21468 dated 29 Oct 2024 (read 13 Nov 2026)","progress":"Sansiri construction-progress page: 73% (photos November 2026, read 13 Nov 2026)"},"pn":"EIA report 256704-35, ONEP approval ทส 1009.5/21468 (29 Oct 2024)","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256704-35, approval ทส 1009.5/21468)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record May 2027; checked against: Developer construction-progress page (photos taken November 2026): overall progress 73%, expected completion May 2027; it states the EIA has been approved and a construction permit issued","https://www.sansiri.com/projectprogress/en/681"],"co":null,"sq":{"handover":"developer","permit":"registry","developer":"registry"},"miss":null},"rw":{"register":"Thailand ONEP EIA register","item":"environmental approval","status":"approved","detail":"approval ทส 1009.5/21468 dated 29/10/2567 (Thai calendar)","code":"256704-35","checked":"2026-11-13"},"src":["https://www.sansiri.com/projectprogress/en/","https://www.sansiri.com/projectprogress/en/681","https://eia.onep.go.th/services/web/open-api/eia-list?page=7"]}},"puna-accra":{"set":{"rvw":null}},"punta-norte-temozon-concoord":{"set":{"rvw":null}},"qapital-uribe-schwarzkopf":{"set":{"rvw":null}},"qflats-kurtkoy-mhr-gyo":{"set":{"rvw":null}},"quartier-am-alten-schlosspark":{"set":{"rvw":null}},"quartier-hugos":{"set":{"rvw":null}},"quattro-del-mar-rak-properties":{"set":{"cl":[["Project registered with RAK RERA","verified","registry","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list"],["Construction 25% complete","verified","independent","https://www.propertynewsint.com/news/rak-properties-releases-construction-update-on-8-projects"],["Handover Dec 2026 (portals) vs Jun 2027 (Property Finder)","contradicted","none","https://www.propertyfinder.ae/en/new-projects/rak-properties/quattro-del-mar"],["Sold out (Property Finder) vs 14 units available (offplan.ae)","contradicted","none","https://offplan.ae/projects/quattro-del-mar"],["Escrow account","unverified","none","https://offplan.ae/projects/quattro-del-mar"],["Freehold","unverified","none","https://www.propertyfinder.ae/en/new-projects/rak-properties/quattro-del-mar"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Quattro Del Mar\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"rvw":null,"src":["https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list","https://www.propertynewsint.com/news/rak-properties-releases-construction-update-on-8-projects","https://www.propertyfinder.ae/en/new-projects/rak-properties/quattro-del-mar","https://ezre.ae/projects/quattro-del-mar/floor-plans","https://offplan.ae/projects/quattro-del-mar","https://www.rakcapitals.ae/projects/quattro-del-mar","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"queen-church":{"set":{"rvw":null}},"queens-district-bucharest":{"set":{"rvw":null}},"querencia-dovec-group":{"set":{"cl":[["Delivery March 2027 (Döveç) vs 01.06.2027 (portal)","contradicted","none","https://www.emlakplatform.com.tr/tr/projects/querencia-long-beach"],["Construction 55% complete","unverified","none","https://www.emlakplatform.com.tr/tr/projects/querencia-long-beach"],["Over 5,000 homes delivered since 1989","unverified","none","https://www.dovecgroup.com/en/about"],["Prices from GBP 146,000 (portal shows from USD 209,001)","unverified","none","https://www.dovecgroup.com/en/projects/querencia"],["Expected 8% rental yield","unverified","none","https://www.emlakplatform.com.tr/tr/projects/querencia-long-beach"],["Title by contract (sözleşme), not a title deed","unverified","none","https://www.emlakplatform.com.tr/tr/projects/querencia-long-beach"],["Building permit issued","unverified","none","https://www.dovecgroup.com/en/projects/querencia"],["The developer page read on 13 Nov 2026 prints: \"Delivery Date March 2027\"","unverified","none","https://www.dovecgroup.com/en/projects/querencia"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Northern Cyprus","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Delivery Date March 2027\"","https://www.dovecgroup.com/en/projects/querencia"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null},"url":"https://www.dovecgroup.com/en/projects/querencia"}},"quill-resort-okinawa-nskre":{"set":{"rvw":null}},"r-sidence-oceana-achakkar-tangier":{"set":{"rvw":null}},"radisson-resort-maldives-thulusdhoo-teus-group":{"set":{"rvw":null}},"ramada-batumi-archi":{"set":{"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Georgia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://archi.ge/en/block/ramada-hotel-and-suites-by-wyndham"],"co":null,"sq":{"handover":"developer","price":"portal","developer":"press"},"miss":null},"url":"https://archi.ge/en/block/ramada-hotel-and-suites-by-wyndham"}},"ramada-nusa-dua-by-wyndham":{"set":{"rvw":null}},"ramhan-island-villas-phase-4-eagle-hills":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2028-Q3) was not re-checked.",null],"co":null,"sq":{"handover":"portal","permit":"registry","price":"portal","developer":"registry"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"raseljkina-pazdigrad-quatro-company":{"set":{"rvw":null}},"raw-district-dubai":{"set":{"rvw":null}},"raya-jebel-sifah-muriya":{"set":{"rvw":null}},"reference-ekkamai":{"set":{"rvw":null}},"reflet-des-monts":{"set":{"rvw":null}},"regalia-residence-imaani-homes":{"set":{"rvw":null}},"regency-works-kirkstall-road-leeds-glenbrook":{"set":{"rvw":null}},"regent-pool-club-residences":{"set":{"rvw":null}},"regina-ionian":{"set":{"rvw":null}},"reign-metrotown":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not checked","official register for Vancouver not looked up on the review date","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","developer":"developer"},"miss":["official register not looked up: official register for Vancouver not looked up on the review date"]}}},"renato-410":{"set":{"rvw":null}},"reportage-heights-baku":{"set":{"rvw":null}},"reportage-hills-reportage":{"set":{"cl":[["Registered with DLD under project 3465","verified","registry","https://dubairealestateiq.com/project/reportage-hills"],["Escrow account (Commercial Bank of Dubai)","verified","registry","https://dubairealestateiq.com/project/reportage-hills"],["Handover Q4 2028 (register: 30 Jun 2028)","verified","registry","https://dubairealestateiq.com/project/reportage-hills"],["Entered construction phase in 2025-2026","verified","registry","https://dubairealestateiq.com/project/reportage-hills"],["902 townhouses (register 905 units)","verified","registry","https://dubairealestateiq.com/project/reportage-hills"],["3BR from AED 2.59m","contradicted","registry","https://dubairealestateiq.com/project/reportage-hills"],["All buyers qualify for the Golden Visa because every unit is above AED 2m","contradicted","registry","https://dubairealestateiq.com/project/reportage-hills"],["Developer completed Rukan Tower (608 units) in Dubai","verified","independent","https://property.constructionweekonline.com/dubai-real-estate-reportage-properties-completes-rukan-tower-announces-new-projects/"],["Developer handed over Al Raha Lofts (274 units) in Abu Dhabi","verified","independent","https://www.khaleejtimes.com/business/uaes-reportage-properties-hands-over-al-raha-lofts-project"],["Only 1 of 26 Reportage projects on the DLD register is finished; Verdana phases passed their 31 Dec 2025 registered date at about 95%","verified","registry","https://dubairealestateiq.com/developer/reportage"],["Freehold for all nationalities","unverified","none","https://reportagehills.com/"],["DLD project register: project 3465, status Active, completion date on the register 30 Jun 2028, 0.39% built at the DLD inspection of 4 Jun 2026, escrow account bank Commercial Bank Of Dubai(Psc), registered developer Reportage Prime Properties L.L.C (DLD developer 1277) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/reportage-hills"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/reportage-hills"],"ho":["future","DLD register completion 30 Jun 2028; 0.39% built at the inspection of 4 Jun 2026","https://dubairealestateiq.com/project/reportage-hills"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/reportage-hills"],"sq":{"handover":"registry","permit":"registry","price":"registry","developer":"registry"},"miss":null}}},"reserva-natural-san-jose-natura-itagui":{"set":{"rvw":null}},"residence-mina-almadies-ilios-groupe":{"set":{"rvw":null}},"residences-1428-brickell-ytech":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77353 \"1428 BRICKELL CONDO\", developer entity YTECH 1428 BRICKELL LLC (matched by the street address in the project name)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Condominium filed with Florida DBPR by Ytech 1428 Brickell LLC (PR77353)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["USD 565M construction financing from J.P. Morgan and Sculptor Real Estate","verified","independent","https://floridayimby.com/2026/09/1428-brickell-continues-ascent-into-miamis-brickell-skyline.html"],["Mat foundation poured Sept 2025 (13,000 cubic yards, 33 hours)","verified","independent","https://floridayimby.com/2026/09/1428-brickell-continues-ascent-into-miamis-brickell-skyline.html"],["Structure at Level 25 of 70 (Sep 2026)","verified","independent","https://floridayimby.com/2026/09/1428-brickell-continues-ascent-into-miamis-brickell-skyline.html"],["Past Level 27 and 'delivering on time' (Oct 2026)","unverified","none","https://www.linkedin.com/posts/ytech-international_1428brickell-constructionupdate-uncompromisingquality-activity-7513232375393390594-x__X"],["Completion late 2028","unverified","none","https://www.groundbreak.city/miami/residences-1428-brickell-under-construction"],["More than 70% sold","unverified","none","https://www.oftmw.com/post/1428-brickell-s-sculptural-curves-are-taking-shape-as-ytech-s-tower-climbs-past-level-16/"],["195 residences of 2 to 4 bedrooms","verified","independent","https://floridayimby.com/2026/09/1428-brickell-continues-ascent-into-miamis-brickell-skyline.html"],["Coastal Construction is general contractor","verified","independent","https://own.miami/brickell/news/the-residences-at-1428-brickell-progresses-toward-2028-completion"],["Prices from USD 2.3M","unverified","none","https://luxurydade.com/blog/brickell-pre-construction-condos-complete-guide-2026"],["Deposits held in escrow","unverified","none","https://1428brickell.com/"]],"ev":{"permit":"Florida DBPR developer summary (official CSV, read 13 Nov 2026): PR77353 1428 BRICKELL CONDO by YTECH 1428 BRICKELL LLC","escrow":"Not stated on the official site","progress":"Developer LinkedIn: Level 25 (1 Sep 2026), past Level 27 (6 Oct 2026); Florida YIMBY 3 Sep 2026 confirms Level 25 with site photos","plans":"Official site shows no downloadable floor plans; oftmw.com cites sizes of 1,800 to 4,000 sq ft","record":"Ytech site says founded 2006 and lists landmarks but names no completed condo towers with units delivered","returns_ok":"No rental guarantee or yield language on the official site"},"pn":"Florida DBPR condominium filing PR77353","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q4) comes from the sources listed on the page.","https://1428brickell.com/"],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"press","permit":"registry","price":"press","developer":"registry"},"miss":null},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77353","code":"PR77353","checked":"2026-11-13"}}},"residences-at-zabeel":{"set":{"rvw":null}},"residences-by-the-fives-playa":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["passed-unconfirmed","date on record 2017 has passed; no source read on the review date confirms delivery",null],"co":null,"sq":{"handover":"press","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"residences-mandarin-oriental-da-nang-nam-khang":{"set":{"rvw":null}},"residences-melia-seychelles-seafront":{"set":{"rvw":null}},"residences-monsanto-gestilar":{"set":{"rvw":null}},"residencial-ancor-iii-metrovacesa":{"set":{"rvw":null}},"residensi-anggun-m-minori":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 30440-1/10-2027/0775(R)-(S) for Residensi Anggun (30440-1), valid 2026-10-02 to 2027-10-01","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30440-1"],["Developer company holds developer licence 30440/05-2028/0117(A) (valid 2023-05-03 to 2028-05-02); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30440-1"],["Register shows construction progress of 92.18% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30440-1"],["Vacant possession due 13 Oct 2026 under the first sale agreement (Jadual H, 36 months, first SPA 13 Oct 2023); the register records an approved extension of 12 months to 13 Oct 2027","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30440-1"],["Expected date of completion printed on the developer permits page: December 2027","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 30440/05-2028/0117(A) and advertising and sales permit 30440-1/10-2026/1099(A)-(S) (Tower A); approving authority: Majlis Bandaraya Johor Bahru; building plan reference MBJB/U/2022/14/BGN/150/RP(21)","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["1,526 units in three towers (421, 619 and 486); Towers B and C expected January and March 2028; freehold; selling price from RM379,000 to RM633,000 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Pin: 1.547244, 103.782030 (Jalan Austin Perdana 2, geocoded with OpenStreetMap Nominatim (street-level match: the pin is on the street the developer names, not on the plot)); the address is the one published by the developer","unverified","none","https://www.mahsing.com.my/projects/m-minori/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 30440-1/10-2027/0775(R)-(S) as valid 2026-10-02 to 2027-10-01 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 92.18% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"pn":"30440-1/10-2027/0775(R)-(S)","rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/30440-1"],"ho":["future","first SPA vacant possession date (13 Oct 2026) passed; the register records an approved extension to 13 Oct 2027 and 92.18% progress","https://teduh.kpkt.gov.my/api/projek-swasta/30440-1"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/30440-1"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 30440-1/10-2027/0775(R)-(S) valid to 2027-10-01; progress 92.18%","code":"30440-1","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/m-minori/","https://teduh.kpkt.gov.my/api/projek-swasta/30440-1"]}},"residensi-m-aria":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 31251-1/01-2029/0037(A)-(S) for Residensi M Aria (31251-1), valid 2026-01-14 to 2029-01-13","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/31251-1"],["Developer M Aria Sdn. Bhd. holds developer licence 31251/12-2030/0307(A) (valid 2025-12-29 to 2030-12-28); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/31251-1"],["Register shows construction progress of 1.24% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/31251-1"],["Vacant possession due 24 Jan 2029 under the first sale agreement (Jadual H, 36 months, first SPA 24 Jan 2026); the register records an approved extension of 12 months to 24 Jan 2030","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/31251-1"],["Expected date of completion printed on the developer permits page: January 2030","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 31251/12-2030/0307(N) and advertising and sales permit 31251-1/01-2029/0037(A)-(S); approving authority: Dewan Bandaraya Kuala Lumpur; building plan reference BP U1 OSC 2025 3414 (5)","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["606 units; freehold; selling price from RM635,000 to RM750,000 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Project address published on the project page: Lot No. 468 B(B), Block B, Rivercity, Jalan Sultan Azlan Shah, Jalan Ipoh, 51200 Kuala Lumpur; from RM483,000 onwards on the project page","unverified","none","https://www.mahsing.com.my/projects/m-aria-sentul/"],["Pin: 3.1798811, 101.6829472 (coordinates of the \"M Aria @ Sentul\" navigation link on the developer page); the address is the one published by the developer","unverified","none","https://www.mahsing.com.my/projects/m-aria-sentul/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 31251-1/01-2029/0037(A)-(S) as valid 2026-01-14 to 2029-01-13 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 1.24% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/31251-1"],"ho":["future","date on record January 2030; checked against: Vacant possession due 24 Jan 2029 under the first sale agreement (Jadual H, 36 months, first SPA 24 Jan 2026); the register records an approved extension of 12 months to 24 Jan 2030","https://teduh.kpkt.gov.my/api/projek-swasta/31251-1"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/31251-1"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 31251-1/01-2029/0037(A)-(S) valid to 2029-01-13; progress 1.24%","code":"31251-1","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/m-aria-sentul/","https://teduh.kpkt.gov.my/api/projek-swasta/31251-1"]}},"residensi-m-aspira":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 5911-33/08-2027/0768(A)-(S) for Residensi M Aspira (5911-33), valid 2024-08-27 to 2027-08-26","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/5911-33"],["Developer Mah Sing Properties Sdn. Bhd. holds developer licence 5911/09-2027/1524(A) (valid 2022-09-27 to 2027-09-26); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/5911-33"],["Register shows construction progress of 21.24 / 22.00% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/5911-33"],["Vacant possession due 20 Jan 2028 under the first sale agreement (Jadual H, 36 months, first SPA 20 Jan 2025); the register records an approved extension of 22 months to 20 Nov 2029","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/5911-33"],["Developer page states expected completion 2029","verified","developer","https://www.mahsing.com.my/projects/taman-desa-condo-m-aspira/"],["Expected date of completion printed on the developer permits page: June 2029","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 5911/09-2027/1524(A) and advertising and sales permit 5911-33/08-2027/0768(A)-(S); approving authority: DBKL; building plan reference DBKL.JKB.BP S1 OSC 2024 2824","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["1,618 serviced apartment units in Towers A and B; leasehold, 99 years to 13 August 2123; selling price from RM624,960 to RM983,760 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 5911-33/08-2027/0768(A)-(S) as valid 2024-08-27 to 2027-08-26 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 21.24/22% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/5911-33"],"ho":["future","date on record June 2029; checked against: Vacant possession due 20 Jan 2028 under the first sale agreement (Jadual H, 36 months, first SPA 20 Jan 2025); the register records an approved extension of 22 months to 20 Nov 2029","https://teduh.kpkt.gov.my/api/projek-swasta/5911-33"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/5911-33"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 5911-33/08-2027/0768(A)-(S) valid to 2027-08-26; progress 21.24/22.00%","code":"5911-33","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/taman-desa-condo-m-aspira/","https://teduh.kpkt.gov.my/api/projek-swasta/5911-33"]}},"residensi-m-aurora":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 13262-2/03-2029/0221(A)-(S) for Residensi M Aurora (13262-2), valid 2026-03-19 to 2029-03-18","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13262-2"],["Developer Major Land Development Sdn. Bhd. holds developer licence 13262/01-2028/0471(A) (valid 2023-01-17 to 2028-01-16); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13262-2"],["Register shows construction progress of 5.00 / 5.00% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13262-2"],["Vacant possession due 28 Mar 2029 under the first sale agreement (Jadual H, 36 months, first SPA 28 Mar 2026); the register records an approved extension of 18 months to 28 Sep 2030","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13262-2"],["Expected date of completion printed on the developer permits page: September 2030","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 13262/01-2028/0471(A) and advertising and sales permit 13262-2/03-2029/0221(N)-(S); approving authority: DBKL; building plan reference DBKL.JKB. BP S1 OSC 2026 0503(7)","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["1,544 suite apartment units (747 in Tower A, 797 in Tower B), built-up 556 to 1,019 sq ft; freehold; selling price from RM492,960 to RM856,560 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 13262-2/03-2029/0221(A)-(S) as valid 2026-03-19 to 2029-03-18 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 5/5% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"pn":"13262-2/03-2029/0221(A)-(S)","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/13262-2"],"ho":["future","date on record September 2030; checked against: Vacant possession due 28 Mar 2029 under the first sale agreement (Jadual H, 36 months, first SPA 28 Mar 2026); the register records an approved extension of 18 months to 28 Sep 2030","https://teduh.kpkt.gov.my/api/projek-swasta/13262-2"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/13262-2"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 13262-2/03-2029/0221(A)-(S) valid to 2029-03-18; progress 5.00/5.00%","code":"13262-2","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/old-klang-road-condo-m-aurora/","https://teduh.kpkt.gov.my/api/projek-swasta/13262-2"]}},"residensi-m-azura":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 30834-1/08-2027/0769(A)-(S) for Residensi M Azura (30834-1), valid 2024-08-27 to 2027-08-26","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30834-1"],["Developer M Azura Sdn. Bhd. holds developer licence 30834/08-2029/0176(A) (valid 2024-08-14 to 2029-08-13); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30834-1"],["Register shows construction progress of 24.00 / 23.50% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30834-1"],["Vacant possession due 14 Nov 2027 under the first sale agreement (Jadual H, 36 months, first SPA 14 Nov 2024); the register records an approved extension of 12 months to 14 Nov 2028","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30834-1"],["Developer page states expected completion Aug 2028","verified","developer","https://www.mahsing.com.my/projects/setapak-new-condo-m-azura/"],["Expected date of completion printed on the developer permits page: August 2028","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 30834/08-2029/0176(A) and advertising and sales permit 30834-1/08-2027/0769(A)-(S); approving authority: DBKL; building plan reference BP U2 OSC 2024 0172 (20)","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["1,140 serviced apartment units (570 per tower); leasehold, 99 years to December 2123; selling price from RM534,960 to RM800,160 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Project address published on the project page: No. 1, Jalan Wangsa Delima 1A, Pusat Bandar Wangsa Maju, 53300 Kuala Lumpur","unverified","none","https://www.mahsing.com.my/projects/setapak-new-condo-m-azura/"],["Pin: 3.199113, 101.744195 (Jalan Wangsa Delima 1A, geocoded with OpenStreetMap Nominatim (street-level match: the pin is on the street the developer names, not on the plot)); the address is the one published by the developer","unverified","none","https://www.mahsing.com.my/projects/setapak-new-condo-m-azura/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 30834-1/08-2027/0769(A)-(S) as valid 2024-08-27 to 2027-08-26 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 24/23.5% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/30834-1"],"ho":["future","date on record August 2028; checked against: Vacant possession due 14 Nov 2027 under the first sale agreement (Jadual H, 36 months, first SPA 14 Nov 2024); the register records an approved extension of 12 months to 14 Nov 2028","https://teduh.kpkt.gov.my/api/projek-swasta/30834-1"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/30834-1"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 30834-1/08-2027/0769(A)-(S) valid to 2027-08-26; progress 24.00/23.50%","code":"30834-1","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/setapak-new-condo-m-azura/","https://teduh.kpkt.gov.my/api/projek-swasta/30834-1"]}},"residensi-m-nova":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 11202-4/08-2027/0688(R)-(S) for Residensi M Nova (11202-4), valid 2026-08-08 to 2027-08-07","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11202-4"],["Developer Myvilla Development Sdn. Bhd. holds developer licence 11202/11-2031/0405(R) (valid 2026-11-10 to 2031-11-09); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11202-4"],["Register shows construction progress of 92.50 / 92.50% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11202-4"],["Vacant possession due 17 Aug 2026 under the first sale agreement (Jadual H, 36 months, first SPA 17 Aug 2023); the register records an approved extension of 18 months to 17 Feb 2028","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11202-4"],["KPKT TEDUH register lists advertising and sales permit 11202-5/10-2027/0915(A)-(S) for Residensi M Nova (11202-5), valid 2024-10-09 to 2027-10-08","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11202-5"],["Developer Myvilla Development Sdn. Bhd. holds developer licence 11202/11-2031/0405(R) (valid 2026-11-10 to 2031-11-09); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11202-5"],["Register shows construction progress of 92.50% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11202-5"],["Vacant possession due 25 Nov 2027 under the first sale agreement (Jadual H, 36 months, first SPA 25 Nov 2024); the register records an approved extension of 12 months to 25 Nov 2028","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11202-5"],["Expected date of completion printed on the developer permits page: February 2028","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 11202/11-2026/1503(A) and advertising and sales permit 11202-4/08-2026/0898(A)-(S); approving authority: DBKL; building plan reference BP U1 OSC 2022 2433","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["1,248 suite apartment units (624 per tower); leasehold, 99 years to 19 July 2122; selling price from RM466,560 to RM722,160 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Pin: 3.210323, 101.669512 (Jalan Sibu, Taman Wahyu, geocoded with OpenStreetMap Nominatim (street-level match: the pin is on the street the developer names, not on the plot)); the address is the one published by the developer","unverified","none","https://www.mahsing.com.my/projects/m-nova/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 11202-4/08-2027/0688(R)-(S) as valid 2026-08-08 to 2027-08-07 (read 13 Nov 2026); also 11202-5/10-2027/0915(A)-(S)","progress":"TEDUH register (latest 7(f) HIMS report): 92.5/92.5/92.5% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/11202-4"],"ho":["future","first SPA vacant possession date (17 Aug 2026) passed; the register records an approved extension to 17 Feb 2028 and 92.5% progress","https://teduh.kpkt.gov.my/api/projek-swasta/11202-4"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/11202-4"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 11202-4/08-2027/0688(R)-(S) valid to 2027-08-07; progress 92.50/92.50%","code":"11202-4","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/m-nova/","https://teduh.kpkt.gov.my/api/projek-swasta/11202-4","https://teduh.kpkt.gov.my/api/projek-swasta/11202-5"]}},"residensi-m-terra":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 30805-1/07-2027/0679(A)-(S) for Residensi M Terra (30805-1), valid 2024-07-25 to 2027-07-24","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30805-1"],["Developer Supreme Springs Sdn. Bhd. holds developer licence 30805/06-2029/0147(A) (valid 2024-06-26 to 2029-06-25); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30805-1"],["Register shows construction progress of 42.70 / 44.11% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30805-1"],["Vacant possession due 27 Jul 2027 under the first sale agreement (Jadual H, 36 months, first SPA 27 Jul 2024); the register records an approved extension of 12 months to 27 Jul 2028","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30805-1"],["Developer page states expected completion 2028","verified","developer","https://www.mahsing.com.my/projects/puchong-condo-m-terra/"],["Expected date of completion printed on the developer permits page: August 2027","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 30805/06-2029/0147(N) and advertising and sales permit 30805-1/07-2027/0679(A)-(S); approving authority: Majlis Bandaraya Subang Jaya; building plan reference MBSJ.BGN.BP5.600-1/10/4/4(28)","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["999 units in total (748 serviced apartments and 251 RMM units at RM250,000); leasehold, 74 years expiring 24 March 2098; selling price from RM546,250 to RM909,535 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 30805-1/07-2027/0679(A)-(S) as valid 2024-07-25 to 2027-07-24 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 42.7/44.11% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"fx":{"developer_company":"Supreme Springs Sdn Bhd","handover_promised":"2028","original_handover":"August 2027","unit_types":["serviced residence"],"price_min":546250,"price_max":909535,"currency":"MYR","permit_authority":"Majlis Bandaraya Subang Jaya"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/30805-1"],"ho":["changed","changed (the developer page read on 13 Nov 2026 says 2028; the register records the first SPA vacant possession date 27 Jul 2027 with an approved extension to 27 Jul 2028)","https://www.mahsing.com.my/projects/puchong-condo-m-terra/"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/30805-1"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 30805-1/07-2027/0679(A)-(S) valid to 2027-07-24; progress 42.70/44.11%","code":"30805-1","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/puchong-condo-m-terra/","https://teduh.kpkt.gov.my/api/projek-swasta/30805-1"]}},"residensi-m-zenya":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 11430-2/03-2027/0280(A)-(S) for Residensi M Zenya (11430-2), valid 2024-04-01 to 2027-03-31","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11430-2"],["Developer M Zenya Sdn. Bhd. holds developer licence 11430/12-2031/0550(R) (valid 2026-12-02 to 2031-12-01); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11430-2"],["Register shows construction progress of 72.12% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11430-2"],["Vacant possession due 06 Apr 2027 under the first sale agreement (Jadual H, 36 months, first SPA 06 Apr 2024); the register records an approved extension of 12 months to 06 Apr 2028","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/11430-2"],["Developer page states expected completion April 2028","verified","developer","https://www.mahsing.com.my/projects/kepong-new-condo-m-zenya/"],["Expected date of completion printed on the developer permits page: April 2028","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["Developer licence 11430/12-2026/1094(A) and advertising and sales permit 11430-2/03-2027/0280(N)-(S); approving authority: DBKL; building plan reference BP U1 OSC 2023 1734","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["619 units in Tower A, built-up 762 to 1,067 sq ft; leasehold, 99 years to 13 December 2120; selling price from RM598,560 to RM849,360 as listed on the permits page","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"],["The permits page says the development information and approved advertisement can be checked on the National Housing Department portal teduh.kpkt.gov.my","unverified","none","https://www.mahsing.com.my/advertising-permits-and-developer-license/"]],"ev":{"permit":"TEDUH (KPKT) lists permit 11430-2/03-2027/0280(A)-(S) as valid 2024-04-01 to 2027-03-31 (read 13 Nov 2026)","progress":"TEDUH register (latest 7(f) HIMS report): 72.12% (read 13 Nov 2026)","escrow":"TEDUH records a Jadual H sale agreement (statutory Housing Development Act stage payments into a Housing Development Account); no HDA bank or number on the developer page","plans":"Developer project page has a Floor Plan section (opened 13 Nov 2026)","returns_ok":"No guaranteed-return or rental-guarantee wording on the developer project page (opened 13 Nov 2026)"},"pn":"11430-2/03-2027/0280(A)-(S)","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/11430-2"],"ho":["future","date on record April 2028; checked against: Vacant possession due 06 Apr 2027 under the first sale agreement (Jadual H, 36 months, first SPA 06 Apr 2024); the register records an approved extension of 12 months to 06 Apr 2028","https://teduh.kpkt.gov.my/api/projek-swasta/11430-2"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/11430-2"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 11430-2/03-2027/0280(A)-(S) valid to 2027-03-31; progress 72.12%","code":"11430-2","checked":"2026-11-13"},"src":["https://www.mahsing.com.my/advertising-permits-and-developer-license/","https://www.mahsing.com.my/projects/kepong-new-condo-m-zenya/","https://teduh.kpkt.gov.my/api/projek-swasta/11430-2"]}},"residensi-zig":{"set":{"rvw":null}},"residenze-magnolia-desenzano-fb-capital":{"set":{"rvw":null}},"rf-princess-cove-phase-3-new-casa-suites-rf-development":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 13578-8/07-2028/0621(A)-(S) for Mercu 3, R&f Tanjung Puteri (13578-8), valid 2025-07-31 to 2028-07-30","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],["Developer R & F Development Sdn Bhd holds developer licence 13578/05-2027/0392(A) (valid 2022-04-26 to 2027-05-05); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],["Register shows construction progress of 45.50% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],["Vacant possession due 30 Aug 2028 under the first sale agreement (Jadual H, 36 months, first SPA 30 Aug 2025); the register records an approved extension of 16 months to 30 Dec 2029","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],["Block 3A sales permit 13578-8/07-2028/0621(A)-(S) active","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],["Block 3B sales permit 13578-7/07-2028/0622(A)-(S) active","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-7"],["Block 3C sales permit 13578-6/07-2028/0623(A)-(S) active","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-6"],["Phase 3 has 4,385 units","contradicted","registry","https://teduh.kpkt.gov.my/api/projek-swasta?q=R%26F&search_type=projek&page=1"],["Phases 1 and 2 completed","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta?q=R%26F&search_type=projek&page=1"],["Delivery 36 months from SPA extended by 16 months with approval (to Dec 2029)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-7"],["Construction about 45% complete and on track","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],["Developer is a wholly owned subsidiary of China's R&F Group","verified","independent","https://theedgemalaysia.com/node/735831"],["Development company R&F Development Sdn. Bhd. (1069248-H)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],["Freehold tenure","unverified","none","https://www.rfprincesscove.com.my/"],["No guaranteed rental return offered","unverified","none","https://rfmalaysia.com/our-development/phase-3/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],"ho":["future","date on record 2029-Q4; checked against: Vacant possession due 30 Aug 2028 under the first sale agreement (Jadual H, 36 months, first SPA 30 Aug 2025); the register records an approved extension of 16 months to 30 Dec 2029","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/13578-8"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 13578-8/07-2028/0621(A)-(S) valid to 2028-07-30; progress 45.50%","code":"13578-8","checked":"2026-11-13"}}},"rhea-by-sansiri":{"set":{"cl":[["Developer construction-progress page (photos taken November 2026): overall progress 11%, expected completion September 2027; it states the EIA has been approved and a construction permit issued","verified","developer","https://www.sansiri.com/projectprogress/en/726"],["295 units in a low-rise format","verified","independent","https://www.infoquest.co.th/?p=565153"],["Prices from THB 3.99 million","verified","independent","https://www.infoquest.co.th/?p=565153"],["Project value THB 1.5 billion","verified","independent","https://www.infoquest.co.th/?p=565153"],["Developer Sansiri PCL is a registered company (0107538000665) listed on the SET since 1996","unverified","none","https://www.sansiri.com/eng/corporate-info"],["EIA approved 30 Mar 2026","unverified","none","https://app.hawook.com/projects/rhea-by-sansiri"],["Construction started May 2026","unverified","none","https://app.hawook.com/projects/rhea-by-sansiri"],["Completion Q4 2027 (Nov 2027); other portal says Jan 2028","unverified","none","https://app.hawook.com/projects/rhea-by-sansiri"],["Freehold available to foreigners within the foreign quota","unverified","none","https://app.hawook.com/projects/rhea-by-sansiri"],["Chanote land title","unverified","none","https://app.hawook.com/projects/rhea-by-sansiri"],["No guaranteed rental return offered","unverified","none","https://www.sansiri.com/condominium/rhea-by-sansiri/en/"],["Sansiri has delivered 305 projects and 106,086 units","unverified","none","https://thaigerproperty.com/projects/thailand/prachuap-khiri-khan/hua-hin/nong-kae/the-standard-residences-hua-hin?eq=rent"]],"ev":{"permit":"Hawook portal says EIA approved 30 Mar 2026, no number; developer page and InfoQuest article give no EIA or permit data","progress":"Sansiri construction-progress page: 11% (photos November 2026, read 13 Nov 2026)","plans":"sansiri.com project page shows master plan, floor plans and unit layouts","record":"Thaiger Property developer panel: 305 projects, 106,086 units (portal figure, not from Sansiri filings)","returns_ok":"No guaranteed return found; portal estimates are its own"},"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2027-Q4; checked against: Developer construction-progress page (photos taken November 2026): overall progress 11%, expected completion September 2027; it states the EIA has been approved and a construction permit issued","https://www.sansiri.com/projectprogress/en/726"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"developer"},"miss":null},"src":["https://app.hawook.com/projects/rhea-by-sansiri","https://en.wikipedia.org/wiki/Sansiri","https://thaigerproperty.com/projects/thailand/prachuap-khiri-khan/hua-hin/nong-kae/the-standard-residences-hua-hin?eq=rent","https://www.fazwaz.co.th/en/projects/thailand/phuket/thalang/choeng-thale/rhea-by-sansiri","https://www.infoquest.co.th/?p=565153","https://www.sansiri.com/condominium/rhea-by-sansiri/en/","https://www.sansiri.com/eng/corporate-info","https://www.sansiri.com/projectprogress/en/726"],"url":"https://www.sansiri.com/projectprogress/en/726"}},"ribamar-aedas-homes-landco":{"set":{"rvw":null}},"rise-blanco-thornton":{"set":{"rvw":null}},"ritz-carlton-reserve-residences-cotton-bay":{"set":{"rvw":null}},"rivage-bal-harbour-miami":{"set":{"rvw":null}},"river-cove-residences-sobha":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2029-Q4) was not re-checked.","https://thesobhacity.com/"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"portal","developer":"registry"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"riverbank-residences-finbar":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not checked","official register for Perth not looked up on the review date","https://kolaboro.com/registers/"],"ho":["future","date on record 2027-Q2; developer page read on 13 Nov 2026: \"dale Road, Rivervale WA, Australia NOW SELLING Est construction commencement October 2025 Completion est mid 2027 Surrender to a life of resplendence at\"","https://www.finbar.com.au/developments/riverbank-residences"],"co":null,"sq":{"handover":"developer","permit":"press","developer":"press"},"miss":["official register not looked up: official register for Perth not looked up on the review date"]}}},"riviera-beverly-hills-residences":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256807-41, approval ทส 1009.5/23677)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2028-Q2; developer page read on 13 Nov 2026: \"om Parking Spaces: 124 Ownership: Freehold Construction Start: February 2026 Construction Completion: June 2028 Find Out More About The Riviera Beverly\"","https://therivieragroupthailand.com/beverly-hills-residences-in-pattaya/"],"co":null,"sq":{"handover":"registry","permit":"registry","price":"press","developer":"registry"},"miss":null}}},"riviera-malibu-residences":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256504-39, approval ทส 1010.5/16617)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2026-Q4; developer page read on 13 Nov 2026: \"oors Total Units: 275 units Ownership: Freehold Construction Start: October 2023 Expected Completion: December 2026 Residence Details 1 Bedroom: 230 units,\"","https://therivieragroupthailand.com/the-riviera-malibu-residences/"],"co":null,"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null}}},"riviera-santa-monica":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256806-6, approval ทส 1009.5/17814)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2028-Q4; developer page read on 13 Nov 2026: \"king Spaces: 124 Spaces Ownership: Freehold Construction Start: October 2025 Construction Finish: November 2028 Penthouse (4 Bedroom + Maid) Total Unit\"","https://therivieragroupthailand.com/santa-monica-in-jomtien/"],"co":null,"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null}}},"riviera-tower-ellinikon":{"set":{"cl":[["Building permit issued in August 2022","verified","independent","https://www.iefimerida.gr/english/greeces-tallest-residential-tower-reaches-full-200-meter-height-shifts-interior"],["Building permit number published","unverified","none","https://www.iefimerida.gr/english/greeces-tallest-residential-tower-reaches-full-200-meter-height-shifts-interior"],["Structure reached 50 floors / 200 m","verified","independent","https://exa.ai/library/markets/stocks/LAMDA/earnings/FY2026/Q1/transcript"],["44th floor milestone in March 2026 triggered a c. EUR 60m contractual payment","verified","independent","https://www.lamdadev.com/sites/default/files/2026-06/ld-annual-report-2025-1.pdf"],["All apartments sold out before construction","verified","independent","https://www.naftemporiki.gr/english/1974054/the-ellinikon-delivery-of-important-projects-will-begin-in-2027/"],["Number of apartments: 170","contradicted","independent","https://www.naftemporiki.gr/english/1974054/the-ellinikon-delivery-of-important-projects-will-begin-in-2027/"],["Average price about EUR 3.66m per unit and EUR 14,036/m2 (Axia data, 171 units, EUR 626m)","verified","independent","https://instanews.gr/103253/ellada/meso-megethos-261-t-m-poso-kostizoyn-oi-polyteleis-katoikies-ston-oyranoxysti-toy-ellinikoy-poy-einai-sold-out.html"],["Delivery to owners in summer 2027","unverified","independent","https://www.ot.gr/2026/03/07/english-edition/lamda-development-riviera-galleria-ready-in-spring-2027/"],["Contractor Bouygues Batiment International / AKTOR JV, design Foster + Partners","verified","independent","https://www.iefimerida.gr/english/greeces-tallest-residential-tower-reaches-full-200-meter-height-shifts-interior"],["Developer is a listed company with audited accounts","verified","independent","https://www.lamdadev.com/sites/default/files/2026-06/ld-annual-report-2025-1.pdf"],["Building costs rose after units were sold, margin below target (developer risk, not buyer)","unverified","none","https://www.greekprops.com/areas/riviera-tower-athens/"],["Contractor page earlier showed 2026 delivery, now summer or end 2027","contradicted","none","https://www.greekprops.com/areas/riviera-tower-athens/"],["The developer annual report 2025 read on 13 Nov 2026 prints: \"Riviera Tower’s reaching of the 44th floor marks a key construction milestone\"","unverified","none","https://www.lamdadev.com/sites/default/files/2026-06/ld-annual-report-2025-1.pdf"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Greece","https://kolaboro.com/registers/"],"ho":["future","Developer annual report 2025: the tower reached the 44th floor; the date on record (summer 2027) comes from press.","https://www.lamdadev.com/sites/default/files/2026-06/ld-annual-report-2025-1.pdf"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"developer"},"miss":null}}},"roma-platja-daro-unnamed-developer":{"set":{"rvw":null}},"romeo-applecross":{"set":{"rvw":null}},"rosae-france":{"set":{"rvw":null}},"rove-home-dubai-marina-irth":{"set":{"cl":[["Project registered with DLD (project 3393)","verified","registry","https://dubairealestateiq.com/project/rove-home-dubai-marina"],["Escrow account (Commercial Bank of Dubai)","verified","registry","https://dubairealestateiq.com/project/rove-home-dubai-marina"],["Anticipated handover Q4 2027","contradicted","registry","https://dubairealestateiq.com/project/rove-home-dubai-marina"],["Under construction (7.8% built, almost flat from 7.14% in Dec 2025)","verified","registry","https://dubairealestateiq.com/project/rove-home-dubai-marina"],["679 apartments (register lists 682 units)","verified","registry","https://dubairealestateiq.com/project/rove-home-dubai-marina"],["Studios from AED 1.35m (registered studio median AED 1.6m, AED 3,637 per sq ft)","verified","registry","https://dubairealestateiq.com/project/rove-home-dubai-marina"],["IRTH has no completed residential project yet; first due 2026","verified","independent","https://www.cbnme.com/power-hour-2026/37-osman-celiker-group-ceo-irth-group/"],["6.7% average rental yield and up to 20% resale gain","unverified","none","https://rove-home-dubai-marina.ae/"],["Branded with Rove Hotels (Emaar and Dubai Holding JV)","unverified","none","https://www.rovehotels.com/en/rove-home/rove-home-dubai-marina/"],["DLD project register: project 3393, status Active, completion date on the register 31 Mar 2028, 7.8% built at the DLD inspection of 6 Jul 2026, escrow account bank Commercial Bank Of Dubai(Psc), registered developer Irth Elite Development L.L.C (DLD developer 1845) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/rove-home-dubai-marina"]],"rvw":null}},"royal-lexis-klcc":{"set":{"rvw":null}},"rua-de-flores-by-horizon-goa":{"set":{"rvw":null}},"rum-residencias-universitarias-mb-signature":{"set":{"rvw":null}},"runwal-raaya-mumbai":{"set":{"rvw":null}},"ryowha-hirafu-luxury-resort-villas":{"set":{"rvw":null}},"sabah-towers-baku":{"set":{"rvw":null}},"sadasi-almazara-playa":{"set":{"rvw":null}},"sadasi-via-verde-playa":{"set":{"rvw":null}},"safa-one-de-grisogono":{"set":{"rvw":null}},"safa-two-de-grisogono-tower-b":{"set":{"rvw":null}},"sage-residences":{"set":{"rvw":null}},"sahara-residence-kigali":{"set":{"rvw":null}},"salib-residences-g3":{"set":{"rvw":null}},"salinas-residence-oasis-atlantico":{"set":{"rvw":null}},"salvia-san-pedro-grupo-abu-nvoga":{"set":{"rvw":null}},"samana-barari-heights":{"set":{"cl":[["The page says the project \"is expected to be handed over in Q4 2028\"","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-heights"],["Studios, 1 to 3-bedroom apartments and 2 and 4-bedroom duplexes; shown as \"Sold Out\" and fully reserved","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-heights"],["Was offered from AED 943,333","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-heights"],["Payment plan published (now closed): 15% on booking, 1% monthly for 42 months, 10% in month 12, 5% in month 18, then 0.5% monthly for 56 months","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-heights"],["Map link on the developer page points to 25°05'39.7\"N 55°19'30.1\"E (25.094361, 55.325028)","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-heights"],["DLD project register: project 3871, status Active, completion date on the register 31 Oct 2028, 4.04% built at the DLD inspection of 1 Jun 2026, escrow account bank Dubai Islamic Bank, registered developer Samana International Real Estate Development L.L.C (DLD developer 1229) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-barari-heights"],["The developer page read on 13 Nov 2026 prints: \"When is the handover date for SAMANA Barari Heights? SAMANA Barari Heights is expected to be handed over in Q4 2028\"","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-heights"]],"ev":{"permit":"Registered as DLD project 3871, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 1 Jun 2026: 4.04% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana International Real Estate Development L.L.C (DLD developer 1229)","handover_promised":"2028-Q4","unit_types":["studio","1 to 3-bedroom apartment","duplex"],"price_min":943333,"currency":"AED","deposit_pct":15,"payment_plan":"15% on booking; 1% monthly for 42 months; 10% in month 12; 5% in month 18; 0.5% monthly for 56 months","lat":25.094361,"lng":55.325028},"pn":"DLD project registration 3871","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/samana-barari-heights"],"ho":["future","DLD register completion 31 Oct 2028; 4.04% built at the inspection of 1 Jun 2026; developer page: \"When is the handover date for SAMANA Barari Heights? SAMANA Barari Heights is expected to be handed over in Q4 2028\"","https://dubairealestateiq.com/project/samana-barari-heights"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/samana-barari-heights"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"src":["https://www.samanadevelopers.com/projects/samana-barari-heights","https://dubairealestateiq.com/project/samana-barari-heights"],"st":"under construction"}},"samana-barari-lagoons":{"set":{"cl":[["\"The anticipated handover date is Q3 2028.\"","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-lagoons"],["Studios, 1 BHK, 2 BHK, 2 BHK duplex and 3 BHK apartments; selected units include a private pool","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-lagoons"],["Prices from AED 809,474; payment options with 15% or 20% on booking","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-lagoons"],["Map embedded on the developer page points to 25.09295, 55.320968","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-lagoons"],["Pin: coordinates of the map embedded on the developer page; the address is the one published by the developer","unverified","none","https://www.samanadevelopers.com/projects/samana-barari-lagoons"],["DLD project register: project 3422, status Active, completion date on the register 31 Mar 2028, 11.84% built at the DLD inspection of 2 Jun 2026, escrow account bank The National Bank Of Fujairah P S C, registered developer Samana Signature Real Estate Developments L.L.C (DLD developer 1598) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-barari-lagoons"]],"ev":{"permit":"Registered as DLD project 3422, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank The National Bank Of Fujairah P S C (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 2 Jun 2026: 11.84% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Signature Real Estate Developments L.L.C (DLD developer 1598)","handover_promised":"2028-Q3","unit_types":["studio","1-bedroom apartment","2-bedroom apartment","2-bedroom duplex","3-bedroom apartment"],"price_min":809474,"currency":"AED","lat":25.09295,"lng":55.320968},"pn":"DLD project registration 3422","rvw":null,"src":["https://www.samanadevelopers.com/projects/samana-barari-lagoons","https://dubairealestateiq.com/project/samana-barari-lagoons"],"st":"under construction"}},"samana-barari-twin-towers-dubai":{"set":{"rvw":null}},"samana-boulevard-heights-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-boulevard-heights"],["DLD project register: project 3205, status Active, completion date on the register 31 Dec 2028, 2.5% built at the DLD inspection of 1 Jun 2026, escrow account bank National Bank Of Ras Al- Khaimah (P.S.C), registered developer Samana International Real Estate Development L.L.C (DLD developer 1229) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-boulevard-heights"],["The developer page read on 13 Nov 2026 prints: \"When is the handover date for SAMANA Boulevard Heights? Handover is anticipated in Q2 2029\"","unverified","none","https://www.samanadevelopers.com/projects/samana-boulevard-heights"]],"ev":{"permit":"Registered as DLD project 3205, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank National Bank Of Ras Al- Khaimah (P.S.C) (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 1 Jun 2026: 2.5% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana International Real Estate Development L.L.C (DLD developer 1229)","handover_promised":"2028-Q4"},"pn":"DLD project registration 3205","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/samana-boulevard-heights"],"ho":["future","DLD register completion 31 Dec 2028; 2.5% built at the inspection of 1 Jun 2026; developer page: \"When is the handover date for SAMANA Boulevard Heights? Handover is anticipated in Q2 2029\"","https://dubairealestateiq.com/project/samana-boulevard-heights"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/samana-boulevard-heights"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-boulevard-heights","https://www.samanadevelopers.com/projects/samana-boulevard-heights","https://dubairealestateiq.com/project/samana-boulevard-heights"],"st":"under construction"}},"samana-downtown-one-dubai":{"set":{"rvw":null}},"samana-greenfield-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/samana-developers/greenfield-by-samana"],["DLD project register: project 4159, status Active, completion date on the register 31 Oct 2028, 1.48% built at the DLD inspection of 11 Jun 2026, escrow account bank Emirates Nbd Bank, registered developer Samana Platinum Real Estate Development L.L.C (DLD developer 2072) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/greenfield-by-samana-developers"],["The developer page read on 13 Nov 2026 prints: \"When is the handover date for SAMANA Greenfield? The project handover is anticipated in Q2, 2029\"","unverified","none","https://www.samanadevelopers.com/projects/samana-greenfield"]],"ev":{"permit":"Registered as DLD project 4159, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 11 Jun 2026: 1.48% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Platinum Real Estate Development L.L.C (DLD developer 2072)","handover_promised":"2028-Q4"},"pn":"DLD project registration 4159","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/greenfield-by-samana-developers"],"ho":["future","DLD register completion 31 Oct 2028; 1.48% built at the inspection of 11 Jun 2026; developer page: \"When is the handover date for SAMANA Greenfield? The project handover is anticipated in Q2, 2029\"","https://dubairealestateiq.com/project/greenfield-by-samana-developers"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/greenfield-by-samana-developers"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.propertyfinder.ae/en/new-projects/samana-developers/greenfield-by-samana","https://www.samanadevelopers.com/projects/samana-greenfield","https://dubairealestateiq.com/project/greenfield-by-samana-developers"],"st":"under construction"}},"samana-hills-south-3":{"set":{"cl":[["The page says the project is \"expected to be handed over in Q4 2028\"","unverified","none","https://www.samanadevelopers.com/projects/samana-hills-south-3"],["Studios, 1-bedroom and 2-bedroom apartments; the page says \"All units are sold out.\"","unverified","none","https://www.samanadevelopers.com/projects/samana-hills-south-3"],["Price shown from AED 998,889","unverified","none","https://www.samanadevelopers.com/projects/samana-hills-south-3"],["Payment plan published (post-dated cheques): 15% on booking, 10% in month 12, 1% monthly for 75 months","unverified","none","https://www.samanadevelopers.com/projects/samana-hills-south-3"],["Map embedded on the developer page points to 24.872001, 55.036179","unverified","none","https://www.samanadevelopers.com/projects/samana-hills-south-3"],["DLD project register: project 4074, status Active, completion date on the register 31 Aug 2028, 4.6% built at the DLD inspection of 22 Jun 2026, escrow account bank Emirates Nbd Bank, registered developer Samana Signature Real Estate Developments L.L.C (DLD developer 1598) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-hills-south-3"],["The developer page read on 13 Nov 2026 prints: \"When is the handover date for SAMANA Hills South 3? SAMANA Hills South 3 is expected to be handed over in Q4 2028\"","unverified","none","https://www.samanadevelopers.com/projects/samana-hills-south-3"]],"ev":{"permit":"Registered as DLD project 4074, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 22 Jun 2026: 4.6% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Signature Real Estate Developments L.L.C (DLD developer 1598)","handover_promised":"2028-Q4","unit_types":["studio","1-bedroom apartment","2-bedroom apartment"],"price_min":998889,"currency":"AED","deposit_pct":15,"payment_plan":"With post-dated cheques: 15% on booking, 10% in month 12, 1% monthly for 75 months. Without: 20% on booking, 10% in month 12, 1% monthly for 70 months","lat":24.872001,"lng":55.036179},"pn":"DLD project registration 4074","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/samana-hills-south-3"],"ho":["future","DLD register completion 31 Aug 2028; 4.6% built at the inspection of 22 Jun 2026; developer page: \"When is the handover date for SAMANA Hills South 3? SAMANA Hills South 3 is expected to be handed over in Q4 2028\"","https://dubairealestateiq.com/project/samana-hills-south-3"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/samana-hills-south-3"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"src":["https://www.samanadevelopers.com/projects/samana-hills-south-3","https://dubairealestateiq.com/project/samana-hills-south-3"],"st":"under construction"}},"samana-hills-south-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-hills-south-4-and-5"],["DLD project register: project 3796, status Active, completion date on the register 15 May 2028, 12.12% built at the DLD inspection of 28 Sep 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Samana Signature Real Estate Developments L.L.C (DLD developer 1598) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-hills-south"]],"ev":{"permit":"Registered as DLD project 3796, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Abu Dhabi Commercial Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 28 Sep 2026: 12.12% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Signature Real Estate Developments L.L.C (DLD developer 1598)","handover_promised":"2028-Q2"},"pn":"DLD project registration 3796","rvw":null,"src":["https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-hills-south-4-and-5","https://www.samanadevelopers.com/projects/samana-hills-south","https://dubairealestateiq.com/project/samana-hills-south"],"st":"under construction"}},"samana-imperial-garden-arjan":{"set":{"cl":[["Registered on the DLD project register as project no. 3797 on 17 Sep 2025","verified","registry","https://dubairealestateiq.com/project/samana-imperial-garden"],["Escrow account held at Abu Dhabi Commercial Bank","verified","registry","https://dubairealestateiq.com/project/samana-imperial-garden"],["Construction stage: 3.76% built at DLD inspection on 19 Jun 2026","verified","registry","https://dubairealestateiq.com/project/samana-imperial-garden"],["Developer entity Samana Signature Real Estate Developments L.L.C registered with DLD (developer no. 1598)","verified","registry","https://dubairealestateiq.com/project/samana-imperial-garden"],["Project has 344 units on the register","verified","registry","https://dubairealestateiq.com/project/samana-imperial-garden"],["Developer group track record on DLD: 6 finished projects (55 total, 49 active)","verified","registry","https://dubairealestateiq.com/developer/samana"],["Handover Q1 2029 (developer FAQ)","contradicted","registry","https://dubairealestateiq.com/project/samana-imperial-garden"],["Starting price AED 980,000","unverified","none","https://www.samanadevelopers.com/projects/samana-imperial-garden"],["Selected units with private pool","unverified","none","https://www.samanadevelopers.com/projects/samana-imperial-garden"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-imperial-garden"],["DLD project register: project 3797, status Active, completion date on the register 31 Dec 2028, 3.76% built at the DLD inspection of 19 Jun 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Samana Signature Real Estate Developments L.L.C (DLD developer 1598) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-imperial-garden"],["The developer page read on 13 Nov 2026 prints: \"When is the handover date for SAMANA Imperial Garden? The anticipated completion date for SAMANA Imperial Garden is Q1 2029\"","unverified","none","https://www.samanadevelopers.com/projects/samana-imperial-garden"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/samana-imperial-garden"],"ho":["future","DLD register completion 31 Dec 2028; 3.76% built at the inspection of 19 Jun 2026; developer page: \"When is the handover date for SAMANA Imperial Garden? The anticipated completion date for SAMANA Imperial Garden is Q1 2029\"","https://dubairealestateiq.com/project/samana-imperial-garden"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/samana-imperial-garden"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"st":"under construction","url":"https://www.samanadevelopers.com/projects/samana-imperial-garden"}},"samana-ivy-gardens-2":{"set":{"cl":[["\"Handover is scheduled for Q4 2028.\"","unverified","none","https://www.samanadevelopers.com/projects/samana-ivy-gardens-2"],["Studios, 1-bedroom and 2-bedroom apartments (one type with a maid's room), each with a private pool; from 384 sq ft","unverified","none","https://www.samanadevelopers.com/projects/samana-ivy-gardens-2"],["Prices from AED 694,000","unverified","none","https://www.samanadevelopers.com/projects/samana-ivy-gardens-2"],["Payment plan published (post-dated cheques): 15% on booking, 1% monthly for 42 months, 10% at month 12, 5% at month 18, then 0.5% monthly for 56 months","unverified","none","https://www.samanadevelopers.com/projects/samana-ivy-gardens-2"],["Map embedded on the developer page points to 25.100575, 55.3771","unverified","none","https://www.samanadevelopers.com/projects/samana-ivy-gardens-2"],["DLD project register: project 2909, status Active, completion date on the register 31 Dec 2027, 15.19% built at the DLD inspection of 18 Jun 2026, escrow account bank Dubai Islamic Bank, registered developer Samana International Real Estate Development L.L.C (DLD developer 1229) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-ivy-gardens-2"]],"ev":{"permit":"Registered as DLD project 2909, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 18 Jun 2026: 15.19% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana International Real Estate Development L.L.C (DLD developer 1229)","handover_promised":"2028-Q4","unit_types":["studio","1-bedroom apartment","2-bedroom apartment"],"price_min":694000,"currency":"AED","deposit_pct":15,"payment_plan":"With post-dated cheques: 15% on booking, 1% monthly for 42 months, 10% at month 12, 5% at month 18, 0.5% monthly for 56 months. Without: 20% on booking, same schedule, 0.5% monthly for 46 months","lat":25.100575,"lng":55.3771},"pn":"DLD project registration 2909","rvw":null,"src":["https://www.samanadevelopers.com/projects/samana-ivy-gardens-2","https://dubairealestateiq.com/project/samana-ivy-gardens-2"],"st":"under construction"}},"samana-lake-views-2":{"set":{"cl":[["The page says the project is \"expected to be handed over in Q3 2028\"","unverified","none","https://www.samanadevelopers.com/projects/samana-lake-views-2"],["Studios, 1-bedroom and 2-bedroom apartments with pool; from 398 sq ft; shown as \"Sold Out\"","unverified","none","https://www.samanadevelopers.com/projects/samana-lake-views-2"],["Payment plan published (post-dated cheques): 15% on booking, 1% monthly for 42 months, 6.5% at months 12 and 18, then 0.5% monthly for 60 months","unverified","none","https://www.samanadevelopers.com/projects/samana-lake-views-2"],["DLD project register: project 3087, status Active, no completion date on the register, 8.91% built at the DLD inspection of 10 Jun 2026, escrow account bank Ajman Bank /, registered developer Samana Signature Real Estate Developments L.L.C (DLD developer 1598) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-lake-views-2"]],"ev":{"permit":"Registered as DLD project 3087, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Ajman Bank / (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 10 Jun 2026: 8.91% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Signature Real Estate Developments L.L.C (DLD developer 1598)","handover_promised":"2028-Q3","unit_types":["studio","1-bedroom apartment","2-bedroom apartment"],"deposit_pct":15,"payment_plan":"With post-dated cheques: 15% on booking, 1% monthly for 42 months, 6.5% at month 12 and at month 18, 0.5% monthly for 60 months"},"pn":"DLD project registration 3087","rvw":null,"src":["https://www.samanadevelopers.com/projects/samana-lake-views-2","https://dubairealestateiq.com/project/samana-lake-views-2"],"st":"under construction"}},"samana-manhattan-2":{"set":{"cl":[["\"Anticipated handover is scheduled for Q4 2027.\"","unverified","none","https://www.samanadevelopers.com/projects/samana-manhattan-2"],["Studios, 1-bedroom and 2-bedroom apartments, most with a pool; from 391 sq ft; shown as \"Sold Out\"","unverified","none","https://www.samanadevelopers.com/projects/samana-manhattan-2"],["Payment plan published (post-dated cheques): 15% on booking, 1% for 35 months, 10% at month 6, 5% at month 12, 5% at month 18, then 0.5% for 60 months","unverified","none","https://www.samanadevelopers.com/projects/samana-manhattan-2"],["DLD project register: project 2802, status Active, completion date on the register 1 Nov 2026, 21.24% built at the DLD inspection of 17 Sep 2026, escrow account bank Dubai Islamic Bank, registered developer Samana Star Real Estate Development L.L.C (DLD developer 1688) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/manhattan-2-by-sd"]],"ev":{"permit":"Registered as DLD project 2802, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 17 Sep 2026: 21.24% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Star Real Estate Development L.L.C (DLD developer 1688)","handover_promised":"2027-Q4","unit_types":["studio","1-bedroom apartment","2-bedroom apartment"],"deposit_pct":15,"payment_plan":"With post-dated cheques: 15% on booking, 1% monthly for 35 months, 10% at month 6, 5% at month 12, 5% at month 18, 0.5% monthly for 60 months"},"pn":"DLD project registration 2802","rvw":null,"src":["https://www.samanadevelopers.com/projects/samana-manhattan-2","https://dubairealestateiq.com/project/manhattan-2-by-sd"],"st":"under construction"}},"samana-ocean-bay":{"set":{"cl":[["\"The anticipated handover date for SAMANA Ocean Bay is Q2, 2028.\"","unverified","none","https://www.samanadevelopers.com/projects/samana-ocean-bay"],["Six floors; 1 to 4-bedroom apartments from 808 sq ft","unverified","none","https://www.samanadevelopers.com/projects/samana-ocean-bay"],["Price from AED 2,887,000","unverified","none","https://www.samanadevelopers.com/projects/samana-ocean-bay"],["Two different payment plans are printed on the same page (a 50/50 plan with post-handover instalments, and a plan with 20% down)","unverified","none","https://www.samanadevelopers.com/projects/samana-ocean-bay"],["Map embedded on the developer page points to 25.29774, 55.32043","unverified","none","https://www.samanadevelopers.com/projects/samana-ocean-bay"],["DLD project register: project 3881, status Active, completion date on the register 30 Jun 2028, 3.17% built at the DLD inspection of 22 Sep 2026, escrow account bank Emirates Nbd Bank, registered developer Samana Platinum Real Estate Development L.L.C (DLD developer 2072) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/ocean-bay-by-samana-developers"]],"ev":{"permit":"Registered as DLD project 3881, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 22 Sep 2026: 3.17% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Platinum Real Estate Development L.L.C (DLD developer 2072)","handover_promised":"2028-Q2","unit_types":["1 to 4-bedroom apartment"],"price_min":2887000,"currency":"AED","lat":25.297735,"lng":55.320434},"pn":"DLD project registration 3881","rvw":null,"src":["https://www.samanadevelopers.com/projects/samana-ocean-bay","https://dubairealestateiq.com/project/ocean-bay-by-samana-developers"],"st":"under construction"}},"samana-ocean-crest-dubai-islands":{"set":{"cl":[["Registered with DLD (project 3878)","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/ocean-crest-by-sd"],["Escrow account at ADCB","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/ocean-crest-by-sd"],["Construction started Sep 2025","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/ocean-crest-by-sd"],["Delivery December 2028 (Property Finder)","contradicted","registry","https://www.mitchellscommercialrealty.com/off-plan/ocean-crest-by-sd"],["Construction progressing (1.35% built)","verified","registry","https://continentalclub.ae/project/ocean-crest-by-sd-dubai-islands/"],["Starting price AED 2.2M","contradicted","none","https://www.prop971.com/project/PRJ-SAM-XFHLM"],["Payment plan 20/70/10","contradicted","none","https://takweenaldar.ae/en/off-plan/project/ocean-crest"],["Single building","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/ocean-crest-by-sd"],["Developer stock sold out","unverified","none","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-ocean-crest"],["Samana has delivered more than 1,300 units","verified","independent","https://www.khaleejtimes.com/business/property/rising-construction-material-prices-due-to-conflict-cost-us-dh100-million-more-says-samana-chief"],["Samana delivers all projects on time","contradicted","registry","https://certifiedpoor.com/insights/samana-projects-dubai-2026"],["Freehold title","unverified","none","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-ocean-crest"],["DLD project register: project 3878, status Active, completion date on the register 30 Jun 2028, 1.35% built at the DLD inspection of 22 Sep 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Samana Platinum Real Estate Development L.L.C (DLD developer 2072) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/ocean-crest-by-sd"]],"rvw":null,"src":["https://certifiedpoor.com/insights/samana-projects-dubai-2026","https://continentalclub.ae/project/ocean-crest-by-sd-dubai-islands/","https://doment.ai/projects/ocean-crest-by-sd-by-samana","https://dubairealestateiq.com/developer/samana","https://takweenaldar.ae/en/off-plan/project/ocean-crest","https://www.khaleejtimes.com/business/property/rising-construction-material-prices-due-to-conflict-cost-us-dh100-million-more-says-samana-chief","https://www.mitchellscommercialrealty.com/off-plan/ocean-crest-by-sd","https://www.prop971.com/project/PRJ-SAM-XFHLM","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-ocean-crest","https://www.zawya.com/en/projects/construction/samana-hands-over-157-unit-santorini-project-in-dubai-studio-city-347947","https://dubairealestateiq.com/project/ocean-crest-by-sd"],"st":"under construction"}},"samana-ocean-views-elie-saab-maldives":{"set":{"rvw":null}},"samana-parkville":{"set":{"cl":[["\"Handover is scheduled for Q3 2028.\"","unverified","none","https://www.samanadevelopers.com/projects/samana-parkville"],["Studios, 1 and 2-bedroom apartments, with sizes starting from 415 sq ft","unverified","none","https://www.samanadevelopers.com/projects/samana-parkville"],["Prices from AED 1,309,244; the payment options include 1% monthly over 80 months","unverified","none","https://www.samanadevelopers.com/projects/samana-parkville"],["DLD project register: project 3791, status Active, completion date on the register 30 Sep 2028, 5.12% built at the DLD inspection of 18 Jun 2026, escrow account bank Dubai Islamic Bank, registered developer Samana Signature Real Estate Developments L.L.C (DLD developer 1598) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-parkville"],["The developer page read on 13 Nov 2026 prints: \"When is the handover date for SAMANA ParkVille? Handover is scheduled for Q3 2028\"","unverified","none","https://www.samanadevelopers.com/projects/samana-parkville"]],"ev":{"permit":"Registered as DLD project 3791, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 18 Jun 2026: 5.12% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Signature Real Estate Developments L.L.C (DLD developer 1598)","handover_promised":"2028-Q3","unit_types":["studio","1-bedroom apartment","2-bedroom apartment"],"price_min":1309244,"currency":"AED"},"pn":"DLD project registration 3791","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/samana-parkville"],"ho":["future","DLD register completion 30 Sep 2028; 5.12% built at the inspection of 18 Jun 2026; developer page: \"When is the handover date for SAMANA ParkVille? Handover is scheduled for Q3 2028\"","https://dubairealestateiq.com/project/samana-parkville"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/samana-parkville"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"src":["https://www.samanadevelopers.com/projects/samana-parkville","https://dubairealestateiq.com/project/samana-parkville"],"st":"under construction"}},"samana-portside-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-portside"],["DLD project register: project 4505, status Active, completion date on the register 30 Jun 2029, 0% built at the DLD inspection of 7 Jul 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Samana Islands Real Estate Development L.L.C (DLD developer 2070) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/portside-by-samana-developers"]],"ev":{"permit":"Registered as DLD project 4505, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Abu Dhabi Commercial Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 7 Jul 2026: 0% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Islands Real Estate Development L.L.C (DLD developer 2070)","handover_promised":"2029-Q2"},"pn":"DLD project registration 4505","rvw":null,"src":["https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-portside","https://www.samanadevelopers.com/projects/samana-portside","https://dubairealestateiq.com/project/portside-by-samana-developers"]}},"samana-resorts":{"set":{"cl":[["\"Handover at SAMANA Resorts is anticipated for Q3, 2028.\"","unverified","none","https://www.samanadevelopers.com/projects/samana-resorts"],["Studios, 1-bedroom and 2-bedroom apartments with private pools, from 428 sq ft; listed as sold out","unverified","none","https://www.samanadevelopers.com/projects/samana-resorts"],["Previously offered from AED 1.3 million","unverified","none","https://www.samanadevelopers.com/projects/samana-resorts"],["Map embedded on the developer page points to 25.03924, 55.19304","unverified","none","https://www.samanadevelopers.com/projects/samana-resorts"],["DLD project register: project 2895, status Active, completion date on the register 30 May 2028, 5.85% built at the DLD inspection of 23 Jun 2026, escrow account bank Dubai Islamic Bank, registered developer Samana International Real Estate Development L.L.C (DLD developer 1229) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-resorts"],["The developer page read on 13 Nov 2026 prints: \"When is the handover date for SAMANA Resorts? Handover at SAMANA Resorts is anticipated for Q3, 2028\"","unverified","none","https://www.samanadevelopers.com/projects/samana-resorts"]],"ev":{"permit":"Registered as DLD project 2895, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 23 Jun 2026: 5.85% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana International Real Estate Development L.L.C (DLD developer 1229)","handover_promised":"2028-Q3","unit_types":["studio","1-bedroom apartment","2-bedroom apartment"],"price_min":1300000,"currency":"AED","payment_plan":"As previously offered: 15% or 20% booking, 1% per month during construction, further instalments after handover","lat":25.039238,"lng":55.19304},"pn":"DLD project registration 2895","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/samana-resorts"],"ho":["future","DLD register completion 30 May 2028; 5.85% built at the inspection of 23 Jun 2026; developer page: \"When is the handover date for SAMANA Resorts? Handover at SAMANA Resorts is anticipated for Q3, 2028\"","https://dubairealestateiq.com/project/samana-resorts"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/samana-resorts"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"src":["https://www.samanadevelopers.com/projects/samana-resorts","https://dubairealestateiq.com/project/samana-resorts"],"st":"under construction"}},"samana-rome-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/samana-developers/rome-2"],["DLD project register: project 3218, status Active, completion date on the register 31 Dec 2027, 38.71% built at the DLD inspection of 16 Sep 2026, escrow account bank First Abu Dhabi Bank, registered developer Samana Star Real Estate Development L.L.C (DLD developer 1688) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/rome-by-sd"]],"ev":{"permit":"Registered as DLD project 3218, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 16 Sep 2026: 38.71% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Samana Star Real Estate Development L.L.C (DLD developer 1688)","handover_promised":"2027-Q4"},"pn":"DLD project registration 3218","rvw":null,"src":["https://www.propertyfinder.ae/en/new-projects/samana-developers/rome-2","https://www.samanadevelopers.com/projects/samana-rome","https://dubairealestateiq.com/project/rome-by-sd"]}},"samana-sky-views-dpc":{"set":{"cl":[["Registered with DLD (project 3855)","verified","registry","https://dubairealestateiq.com/project/samana-sky-views"],["Escrow account at ADCB","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/samana-sky-views"],["Delivery July 2028","verified","registry","https://dubairealestateiq.com/project/samana-sky-views"],["Construction progress 0% (Property Finder, Jul 2025)","contradicted","registry","https://dubairealestateiq.com/project/samana-sky-views"],["Construction started Sep 2025","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/samana-sky-views"],["Launch price AED 941,007","unverified","none","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-sky-views"],["Registered sales median about AED 972k","verified","registry","https://dubairealestateiq.com/project/samana-sky-views"],["Sold out","unverified","none","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-sky-views"],["556 units in one building","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/samana-sky-views"],["Private pool in every unit","unverified","none","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-sky-views"],["Samana has delivered more than 1,300 units","verified","independent","https://www.khaleejtimes.com/business/property/rising-construction-material-prices-due-to-conflict-cost-us-dh100-million-more-says-samana-chief"],["Samana delivers all projects on time","contradicted","registry","https://certifiedpoor.com/insights/samana-projects-dubai-2026"],["Freehold title","unverified","none","https://www.propertyfinder.ae/en/new-projects/samana-developers/samana-sky-views"],["DLD project register: project 3855, status Active, completion date on the register 31 Jul 2028, 2.23% built at the DLD inspection of 16 Jun 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Samana World Real Estate Development L.L.C (DLD developer 1933) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/samana-sky-views"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/samana-sky-views"],"ho":["future","DLD register completion 31 Jul 2028; 2.23% built at the inspection of 16 Jun 2026","https://dubairealestateiq.com/project/samana-sky-views"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/samana-sky-views"],"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":null},"st":"under construction"}},"samani-villa-pecatu-phase-2":{"set":{"rvw":null}},"samara-lombok-villas-pt-lombok-torok-developments":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2028-Q1; developer page read on 13 Nov 2026: \"TH LOMBOK CAPITAL PARTNER SECURED, FAST TRACKING OPENING TO Q1 2028 30 MINUTES FROM LOMBOK INTERNATIONAL AIRPORT FIRST DESTINAT\"","https://samaralombok.com/"],"co":null,"sq":{"permit":"developer","developer":"press"},"miss":null}}},"samudra-villas":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2028-Q1; developer page read on 13 Nov 2026: \"ate Well Drilling Target: December 2026 Villa Construction Start Target: January 2027 Finishes & Handover Target: Early 2028 Follow Our Progress Live updates as each milestone is compl\"","https://samudravillas.com/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"sanara-residential-phase-ii-reserva-conchal-reserva-conchal":{"set":{"rvw":null}},"sands-residences":{"set":{"rvw":null}},"santorini-residences-westlands-nairobi":{"set":{"rvw":null}},"sanur-cassandra-4-vibe-development":{"set":{"rvw":null}},"sanuuri-riverside-residences":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://investlandbali.com/listing/sanuuri"],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"developer"},"miss":null}}},"saona-studios-malasama-development":{"set":{"rvw":null}},"sapana-the-rainforest-goa":{"set":{"rvw":null}},"saraya-al-ruba":{"set":{"rvw":null}},"saraya-beach-lombok":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q2) comes from the sources listed on the page.","https://sarayalombok.com/"],"co":null,"sq":{"handover":"developer","permit":"press","price":"developer","developer":"developer"},"miss":null}}},"sasa-hua-hin":{"set":{"rvw":null}},"savoy-hotel-palawan-megaworld":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","official register for Philippines not looked up on the review date","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2028-Q2 not re-checked on the review date",null],"co":null,"sq":{"permit":"press","developer":"press"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: official register for Philippines not looked up on the review date","handover status not resolved"]}}},"scala-french-alps":{"set":{"rvw":null}},"scirocco-heights-residences-birzebbuga":{"set":{"rvw":null}},"se-ruma-eco-sanctuary":{"set":{"rvw":null}},"sea-cliff-imtiaz":{"set":{"rvw":null}},"sea-la-vie-qatar-dar-global":{"set":{"rvw":null}},"sealine-residence-al-zorah":{"set":{"rvw":null}},"seascape-auckland-shundi":{"set":{"rvw":null}},"seaview-heights-cybarco":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Cyprus","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.cybarco.com/project/seaview-heights-limassol/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"press"},"miss":null}}},"secret-inshi":{"set":{"rvw":null}},"seef-residences-alef":{"set":{"rvw":null}},"segara":{"set":{"rvw":null}},"seget-ii-residential-development-building-e":{"set":{"rvw":null}},"sei-saadiyat-aldar":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2030-Q4) was not re-checked.","https://www.aldar.com/properties/en/seisaadiyat"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"registry"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"selo-suites":{"set":{"rvw":null}},"selton-skye-accra":{"set":{"rvw":null}},"senfoni-etiler-emlak-konut-yigit-kubba-dbh":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Turkey","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q3) comes from the sources listed on the page.","https://www.emlakkonut.com.tr/tr-TR/senfoni%CC%87-eti%CC%87ler"],"co":null,"sq":{"handover":"registry","permit":"press","price":"press","developer":"press"},"miss":null}}},"senja-sumba-imvest-land-indonesia":{"set":{"rvw":null}},"senna-tower-fg-empreendimentos":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Brazil","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)"]}}},"sense8-samui-villas-koh-samui":{"set":{"rvw":null}},"sensi-saadiyat-reportage":{"set":{"rvw":null}},"seraphina-isles-villa-trawaya":{"set":{"rvw":null}},"seren-house-pererenan":{"set":{"rvw":null}},"serenae-french-alps":{"set":{"rvw":null}},"serenity-estates-ubud":{"set":{"rvw":null}},"serenity-view":{"set":{"cl":[["\"Livraison à partir du 4ème trimestre 2028\"","unverified","none","https://www.cogedim.com/provence-alpes-cote-d-azur/alpes-maritimes-06/nice/serenity-view-29427-1851483.html"],["Status \"EN COMMERCIALISATION\"; apartments from 2 to 4 rooms","unverified","none","https://www.cogedim.com/provence-alpes-cote-d-azur/alpes-maritimes-06/nice/serenity-view-29427-1851483.html"],["Prices from EUR 325,000","unverified","none","https://www.cogedim.com/provence-alpes-cote-d-azur/alpes-maritimes-06/nice/serenity-view-29427-1851483.html"],["Address published: 234 Avenue de Sainte-Marguerite, 06200 Nice, with map coordinates","unverified","none","https://www.cogedim.com/provence-alpes-cote-d-azur/alpes-maritimes-06/nice/serenity-view-29427-1851483.html"],["The developer page read on 13 Nov 2026 prints: \"Livraison à partir du 4 ème trimestre 2028\"","unverified","none","https://www.cogedim.com/provence-alpes-cote-d-azur/alpes-maritimes-06/nice/serenity-view-29427-1851483.html"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for France","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Livraison à partir du 4 ème trimestre 2028\"","https://www.cogedim.com/provence-alpes-cote-d-azur/alpes-maritimes-06/nice/serenity-view-29427-1851483.html"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"serenity-village":{"set":{"cl":[["Developer page (marked last updated May 2026): 25 villas, Q3 2027 handover, entry price Rp 2.3 billion","verified","developer","https://www.globalbalihome.com/project-serenity-village.html"],["Handover Q3 2027","unverified","none","https://www.globalbalihome.com/project-serenity-village.html"],["Notarized 30-year leasehold with extension rights","unverified","none","https://www.globalbalihome.com/project-serenity-village.html"],["Construction insured with Allianz (contractors all-risk)","unverified","none","https://www.globalbalihome.com/about.html"],["Developer has delivered a completed project","contradicted","none","https://www.globalbalihome.com/about.html"],["First project Serenity Villas handover Q2 2026 (homepage) vs construction completion September 2026 (agent listing)","contradicted","none","https://bali.realestate/property/o17216/"],["43 villas in portfolio (homepage) vs 42 villas designed and under development (About page)","contradicted","none","https://www.globalbalihome.com/about.html"],["10-15% annual yield, ~80% occupancy","unverified","none","https://www.globalbalihome.com"],["Land zoned Orange R-4 for tourism (agent listing)","unverified","none","https://bali.realestate/property/o17245/"],["Building permit (PBG) issued","unverified","none","https://www.globalbalihome.com/project-serenity-village.html"]],"ev":{"escrow":"Allianz construction insurance (contractors all-risk, property, liability) stated; no escrow, bank guarantee or deposit insurance","progress":"Only 'Last updated: May 2026' page stamp; no construction updates","plans":"Developer page has a Layouts and Interiors section and a unit table (opened 13 Nov 2026)","record":"About page: 'three years on the ground', '42 villas designed & under development'; partner contractors' past resorts listed, no completed Global Bali Home project","returns_ok":"No guaranteed-return wording on the developer page (opened 13 Nov 2026)"},"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2027-Q3; checked against: Developer page (marked last updated May 2026): 25 villas, Q3 2027 handover, entry price Rp 2.3 billion","https://www.globalbalihome.com/project-serenity-village.html"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"serenity-villas-ubud":{"set":{"cl":[["Developer page (marked last updated May 2026) still shows \"Q2 2026 Handover\" when read on 13 Nov 2026, after that date; it announces no completion and no new date","unverified","developer","https://www.globalbalihome.com/project-serenity-villas.html"],["12 villas, 3 available, Rp 6.15B-6.87B","unverified","none","https://www.globalbalihome.com/project-serenity-villas.html"],["Starting price (page title 'from Rp 5.77B' vs homepage Rp 6.03B vs table Rp 6.15B)","contradicted","none","https://www.globalbalihome.com"],["Handover Q2 2026","contradicted","none","https://bali.realestate/property/o17216/"],["PBG building permit obtained","unverified","none","https://bali.realestate/property/o17216/"],["Lease term (30-year leasehold on developer site vs 28+30 on agent listing)","contradicted","none","https://bali.realestate/property/o17216/"],["Land zoning orange R-4, tourism use permitted","unverified","none","https://bali.realestate/property/o17216/"],["10-15% projected yield based on manager's real data","unverified","none","https://www.globalbalihome.com/project-serenity-villas.html"],["Construction insured with Allianz","unverified","none","https://www.globalbalihome.com/about.html"],["Deposit protection or escrow","unverified","none","https://www.globalbalihome.com/project-serenity-villas.html"],["Developer has completed earlier projects","unverified","none","https://www.globalbalihome.com/about.html"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["passed-unconfirmed","late (date on record Q2 2026 has passed; the developer page still shows it and announces no completion; no satellite series because there is no plot pin)","https://www.globalbalihome.com/project-serenity-villas.html"],"co":null,"sq":{"handover":"developer","permit":"portal","price":"developer","developer":"developer"},"miss":null}}},"sereno-fort-lauderdale-integra-flying-point":{"set":{"rvw":null}},"serestar-javea-talvion":{"set":{"rvw":null}},"serra-villas-phase-2-serra-villas":{"set":{"rvw":null}},"seventeen-gables":{"set":{"rvw":null}},"shahrukhz-residences-danube":{"set":{"cl":[["Registered with DLD as project 4548","verified","registry","https://uaepropertychecker.com/projects/shahrukhz-residences-by-danube"],["Escrow account exists","verified","registry","https://uaepropertychecker.com/projects/shahrukhz-residences-by-danube"],["Completion Q4 2029 / December 2029","contradicted","registry","https://wizipremium.com/projects/shahrukhz-residences-danube-maritime-city.html"],["Construction not started (0% at 12 Aug 2026; start filed 1 Jan 2027)","verified","registry","https://uaepropertychecker.com/projects/shahrukhz-residences-by-danube"],["1,143 units (1,126 apartments, 17 retail)","verified","registry","https://uaepropertychecker.com/projects/shahrukhz-residences-by-danube"],["Studios from AED 1.65m (news says AED 1.7m)","unverified","none","https://danubeproperties.com/portfolio/shahrukhz-residences/"],["Declared value AED 617.7m","verified","registry","https://uaepropertychecker.com/projects/shahrukhz-residences-by-danube"],["Danube has 19 finished projects on the register","verified","registry","https://dubairealestateiq.com/developer/danube"],["Fully furnished with penthouses designed by Gauri Khan","unverified","none","https://offplaninsider.com/news/danube-shahrukhz-residences-launch-dubai-maritime-city/"],["Freehold, open to all nationalities","unverified","none","https://shahrukhzresidencesbydanube.com/about/"],["DLD project register: project 4166, status Active, completion date on the register 30 Jun 2029, 1.86% built at the DLD inspection of 13 Aug 2026, escrow account bank First Abu Dhabi Bank, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/shahrukhz-by-danube"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/shahrukhz-by-danube"],"ho":["future","DLD register completion 30 Jun 2029; 1.86% built at the inspection of 13 Aug 2026","https://dubairealestateiq.com/project/shahrukhz-by-danube"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/shahrukhz-by-danube"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"src":["https://danubeproperties.com/portfolio/shahrukhz-residences/","https://dubairealestateiq.com/developer/danube","https://foundgroup.ae/new-launches/shahrukhz-residences-by-danube-ref-op-2166","https://offplaninsider.com/news/danube-shahrukhz-residences-launch-dubai-maritime-city/","https://shahrukhzresidencesbydanube.com/about/","https://sms-realty.com/blogs/shahrukhz-residences-danube-maritime-city","https://uaepropertychecker.com/projects/shahrukhz-residences-by-danube","https://wizipremium.com/projects/shahrukhz-residences-danube-maritime-city.html","https://www.danubeshahrukz.com/residences.html","https://dubairealestateiq.com/project/shahrukhz-by-danube"],"st":"under construction","url":"https://danubeproperties.com/portfolio/shahrukhz-residences/"}},"sharjah-sustainable-city-ii-shurooq-see-holding":{"set":{"rvw":null}},"shift-esperanza-los-nidos-blesso":{"set":{"rvw":null}},"shivo-towers-shivo":{"set":{"rvw":null}},"shoma-bay-miami":{"set":{"rvw":null}},"shoreline-al-marjan-damac":{"set":{"cl":[["Project registered in RAK as 'Shoreline by Damac', developer Damac Vertex Real Estate Development LLC OPC, status In progress","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],["Construction started 9 Sep 2024","unverified","none","https://www.propertyfinder.ae/en/new-projects/damac-properties/damac-shoreline"],["Construction 0% complete","contradicted","none","https://jre.ae/zh/projects/shoreline"],["Completion July 2028 (now Q3 2028)","unverified","none","https://rakcompare.ae/project/shoreline"],["Unit count 384 (DAMAC article) vs 411 (agents)","contradicted","none","https://www.damacproperties.com/en/blog/why-invest-shoreline-damac-marjan-island-rak-2378/"],["Launch price from AED 1.83M; current developer stock from AED 4.515M","unverified","none","https://impalarealestate.com/projects/shoreline/"],["Escrow account for buyer payments","unverified","none","https://impalarealestate.com/projects/shoreline/"],["DAMAC group publishes audited accounts and has listed sukuk","verified","independent","https://docs.publicnow.com/viewDoc.aspx?filename=134461%5CEXT%5C3D617F4AED98F11E15DBB9D831E3E4E62D41E996_AE7355028D458ABCC7DA3B880D193B69FE322E34.PDF"],["Freehold for foreign buyers on Al Marjan Island","unverified","none","https://rakcompare.ae/project/shoreline"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Shoreline by Damac\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"du":null,"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"Shoreline by Damac\", In progress), read 13 Nov 2026","escrow":"Agent Impala states escrow account 'not published by the developer'","progress":"Only a construction start date (9 Sep 2024) on Property Finder; one agent shows 0% readiness, another 'not reported'","plans":"Floor plans for the remaining 2BR and 3BR units on agent pages from the developer stock list","record":"No delivered-units figure on the pages opened; DAMAC audited accounts (DIFC entity) show completed properties but not unit counts","returns_ok":"No guaranteed returns stated"},"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["listed","RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"ho":["none","The developer page read is a blog post with no date; the date on record comes from agencies.","https://www.damacproperties.com/en/blog/why-invest-shoreline-damac-marjan-island-rak-2378/"],"co":null,"sq":{"handover":"portal","permit":"registry","price":"press","developer":"registry"},"miss":null},"url":"https://www.damacproperties.com/en/blog/why-invest-shoreline-damac-marjan-island-rak-2378/"}},"siamese-bangtao":{"set":{"rvw":null}},"sidi-villas-by-tm-phase-3-costa-blanca":{"set":{"rvw":null}},"siena-la-manga-club-taylor-wimpey":{"set":{"rvw":null}},"signature-zemun-belgrade":{"set":{"rvw":null}},"six-senses-residences-belize-crdg":{"set":{"rvw":null}},"six-senses-residences-dubai-marina-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/select-group/six-senses-residences-dubai-marina"],["DLD project register: project 3006, status Active, no completion date on the register, 26.66% built at the DLD inspection of 25 Sep 2026, escrow account bank Emirates Nbd Bank, registered developer Select Global Development L.L.C (DLD developer 972) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/six-senses-residences-dubai-marina"]],"ev":{"permit":"Registered as DLD project 3006, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Emirates Nbd Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 25 Sep 2026: 26.66% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Select Global Development L.L.C (DLD developer 972)"},"pn":"DLD project registration 3006","rvw":null,"src":["https://www.propertyfinder.ae/en/new-projects/select-group/six-senses-residences-dubai-marina","https://www.select-group.ae/developments/six-senses-residences-dubai-marina","https://dubairealestateiq.com/project/six-senses-residences-dubai-marina"],"st":"under construction"}},"six-senses-residences-porto-heli-costa-perla":{"set":{"rvw":null}},"siyal-makadi-heights-orascom":{"set":{"cl":[["Siyal launched in Q1 2026","verified","independent","https://odh-space.fra1.digitaloceanspaces.com/b5dfcf79fae7b5a88f866128ef1af4ff.pdf"],["Developer is EGX-listed Orascom Development Egypt","verified","independent","https://english.mubasher.info/news/4612308/Orascom-Development-Egypt-ORHD-CA-Reports-Its-Financial-Results-Standalone-for-the-Period-from-01-01-2026-to-31-03-2026/"],["205 villas in the phase","contradicted","none","https://realestate.eg/en/200-vacation-in-ain-al-sokhna-makadi-heights-resort-compound/5063341-siyal"],["Completion in 3.5 years","unverified","none","https://www.makadiheights.com/home-at-makadi/siyal"],["About 2,900 units delivered at Makadi Heights","verified","independent","https://odh-space.fra1.digitaloceanspaces.com/1828ba1cd7c4b74f2764e1ff46deec7e.pdf"],["63% of Makadi Heights 1H 2026 sales to international buyers","verified","independent","https://odh-space.fra1.digitaloceanspaces.com/b5dfcf79fae7b5a88f866128ef1af4ff.pdf"],["On track to deliver 500 Makadi Heights units in 2026","unverified","none","https://odh-space.fra1.digitaloceanspaces.com/b5dfcf79fae7b5a88f866128ef1af4ff.pdf"],["Makadi Heights expanded by a 1.021M m2 government seafront plot (50% in-kind to government)","verified","independent","https://www.arabfinance.com/en/news/newdetails/makadi-heights-signs-agreement-to-develop-seafront-plot-on-Red-Sea"],["Prices from EGP 22.7M","unverified","none","https://realestate.eg/en/200-vacation-in-ain-al-sokhna-makadi-heights-resort-compound/5063341-siyal"],["Building permit issued for the phase","unverified","none","https://www.makadiheights.com/home-at-makadi/siyal"],["Buyer payments held in escrow","unverified","none","https://www.makadiheights.com/home-at-makadi/siyal"],["The developer page read on 13 Nov 2026 prints: \"Completion Date 3.5 Years\"","unverified","none","https://www.makadiheights.com/home-at-makadi/siyal"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Egypt","https://kolaboro.com/registers/"],"ho":["none","The developer page gives a duration (3.5 years), not a date.","https://www.makadiheights.com/home-at-makadi/siyal"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"developer"},"miss":null}}},"skai-ras-al-khaimah":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/rak-properties/skai"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"SKAI\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"SKAI\", In progress), read 13 Nov 2026"},"rvw":null,"src":["https://www.albawaba.com/business/pr/rak-properties-launches-skai-%E2%80%93-new-1600481","https://www.propertyfinder.ae/en/new-projects/rak-properties/skai","https://www.rakproperties.ae/our-properties/skai/","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"skala-villas-north-ariane-real-estate":{"set":{"rvw":null}},"sky-gardens-tower-gj-properties":{"set":{"rvw":null}},"sky-gate-tower-tiger":{"set":{"cl":[["Project registered with DLD (no. 4120) on 9 Oct 2025","verified","registry","https://www.homesearch.ae/for-sale/off-plan/tiger/sky-gate-tower-4120"],["Escrow account at ADCB","verified","registry","https://uaepropertychecker.com/projects/sky-gate-tower"],["Tiger Properties is DLD registered developer no. 581","verified","registry","https://uaepropertychecker.com/projects/sky-gate-tower"],["431 units in one building","verified","registry","https://www.homesearch.ae/for-sale/off-plan/tiger/sky-gate-tower-4120"],["Construction started (4.68% at 7 Oct 2026 DLD inspection)","verified","registry","https://uaepropertychecker.com/projects/sky-gate-tower"],["Handover Q1 2028","unverified","none","https://www.prop971.com/project/PRJ-TIG-YLQYF"],["Units sold on the register from about AED 490K","verified","registry","https://www.homesearch.ae/for-sale/off-plan/tiger/sky-gate-tower-4120"],["Tiger handed over Nobles Tower (549 units) in Oct 2024","verified","independent","https://meconstructionnews.com/61065/tiger-properties-completes-handover-of-nobles-tower/amp"],["Tiger has 15 completed projects","unverified","none","https://www.prop971.com/project/PRJ-TIG-YLQYF"],["Fully furnished units","unverified","none","https://d13c6n7sgaw7ah.cloudfront.net/projects/brochures/skygate-tower-brochure-doc.pdf"],["DLD project register: project 4120, status Active, completion date on the register 29 Feb 2028, 4.68% built at the DLD inspection of 7 Oct 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Tiger Properties (DLD developer 581) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sky-gate-tower"]],"rvw":null}},"sky-stars-ocean-view-phase-2-magnum-estate":{"set":{"rvw":null}},"sky-tower-first-projects":{"set":{"rvw":null}},"skye-blossom-kottawa":{"set":{"rvw":null}},"skyhaus-colombo-crystal-property-group":{"set":{"rvw":null}},"skyline-havens-ellinikon-hellenic-estates":{"set":{"rvw":null}},"skyline-yerevan":{"set":{"rvw":null}},"skymare-ecuador":{"set":{"rvw":null}},"skypark-kepler-tropicana":{"set":{"rvw":null}},"skypark-lucean-jomtien-lunique":{"set":{"rvw":null}},"skywater-cape-town":{"set":{"rvw":null}},"sls-ocean-beach-residences":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"sls-residences-bangkok-sukhumvit-24-valanti":{"set":{"rvw":null}},"so-lagoon-cherngtalay-origin":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Thailand ONEP EIA register (report 256808-8, approval ทส 1009.5/1981)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["not checked","date on record 2027-Q4 not re-checked on the review date",null],"co":null,"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":["handover status not resolved"]}}},"sobha-aquacrest-downtown-uaq":{"set":{"rvw":null}},"sobha-central-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/sobha-realty/sobha-central"],["DLD project register: project 4328, status Active, completion date on the register 31 Dec 2031, 2.38% built at the DLD inspection of 29 Sep 2026, escrow account bank Dubai Islamic Bank, registered developer Sobha L.L.C (DLD developer 966) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sobha-central"]],"ev":{"permit":"Registered as DLD project 4328, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 29 Sep 2026: 2.38% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Sobha L.L.C (DLD developer 966)","handover_promised":"2031-Q4"},"pn":"DLD project registration 4328","rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/sobha-central"],"ho":["future","DLD register completion 31 Dec 2031; 2.38% built at the inspection of 29 Sep 2026","https://dubairealestateiq.com/project/sobha-central"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/sobha-central"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://elevatorworld.com/news/daily-news/sobha-realty-launches-major-new-dubai-development/","https://gulfconstructiononline.com/Article/387553/Six-tower_Sobha_Central_to_rise_on_Sheikh_Zayed_Road","https://sobharealty.com/media-center/press-releases/introducing-sobha-central-sobha-realtys-new-mixed-use-icon-sheikh-zayed/","https://www.propertyfinder.ae/en/new-projects/sobha-realty/sobha-central","https://dubairealestateiq.com/project/sobha-central"],"st":"under construction"}},"sobha-siniya-island-villas-sobha-realty":{"set":{"rvw":null}},"sobha-skyscape":{"set":{"cl":[["Project registered with DLD (project 3160, Active)","verified","registry","https://dubairealestateiq.com/project/skyscape"],["Escrow account (Dubai Islamic Bank)","verified","registry","https://dubairealestateiq.com/project/skyscape"],["Construction at 38.27% (DLD inspection 21 Sep 2026)","verified","registry","https://dubairealestateiq.com/project/skyscape"],["Developer entity registered: Sobha L.L.C (DLD developer 966)","verified","registry","https://dubairealestateiq.com/project/skyscape"],["Developer track record: 21 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/sobha"],["Handover Dec 2028 for each tower (Sobha page) [DLD registered completion 31 Dec 2029; A1 also lists Q4 2029]","contradicted","registry","https://dubairealestateiq.com/project/skyscape"],["Starting price AED 1,710,000 (A1) [Sobha page ranges start at AED 1.95M (Avenue); DLD registered sales median AED 2.1m, AED 2,425 per sq ft (366 sales)]","unverified","none","https://a1properties.ae/project-details/skyscape-sobha-hartland-2-dubai"],["Construction progressing (38.27% at 21 Sep 2026, up from 23.22% in Mar 2026)","verified","registry","https://dubairealestateiq.com/project/skyscape"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/skyscape-sobha-hartland-2-dubai"],["No guaranteed returns advertised","unverified","none","https://sobharealty.com/properties-in-dubai/sobha-hartland-2/skyscape"],["DLD project register: project 3160, status Active, completion date on the register 31 Dec 2029, 38.27% built at the DLD inspection of 21 Sep 2026, escrow account bank Dubai Islamic Bank, registered developer Sobha L.L.C (DLD developer 966) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/skyscape"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/skyscape"],"ho":["future","DLD register completion 31 Dec 2029; 38.27% built at the inspection of 21 Sep 2026","https://dubairealestateiq.com/project/skyscape"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/skyscape"],"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":null}}},"sobha-solis":{"set":{"cl":[["Project registered with DLD (project 3334, Active)","verified","registry","https://dubairealestateiq.com/project/sobha-solis"],["Escrow account (Abu Dhabi Commercial Bank)","verified","registry","https://dubairealestateiq.com/project/sobha-solis"],["Construction at 13.22% (DLD inspection 5 May 2026)","verified","registry","https://dubairealestateiq.com/project/sobha-solis"],["Developer entity registered: Sobha L.L.C (DLD developer 966)","verified","registry","https://dubairealestateiq.com/project/sobha-solis"],["Developer track record: 21 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/sobha"],["Handover Q4 2028","verified","registry","https://dubairealestateiq.com/project/sobha-solis"],["Starting price AED 1,040,000 (A1) versus AED 2.00M (Sobha, subject to inventory) [DLD registered sales median AED 1.1m, AED 2,020 per sq ft (563 sales), so the A1 figure likely reflects launch or resale pricing]","contradicted","none","https://sobharealty.com/properties-in-dubai/sobha-solis"],["Pace: 13.22% built 19 months after the registered start, with completion due Dec 2028 [Kolaboro observation from the register]","unverified","none","https://dubairealestateiq.com/project/sobha-solis"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/sobha-solis-motor-city-dubai"],["No guaranteed returns advertised","unverified","none","https://sobharealty.com/properties-in-dubai/sobha-solis"],["DLD project register: project 3334, status Active, completion date on the register 31 Dec 2028, 13.22% built at the DLD inspection of 5 May 2026, escrow account bank Abu Dhabi Commercial Bank, registered developer Sobha L.L.C (DLD developer 966) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sobha-solis"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/sobha-solis"],"ho":["future","DLD register completion 31 Dec 2028; 13.22% built at the inspection of 5 May 2026","https://dubairealestateiq.com/project/sobha-solis"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/sobha-solis"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"sobha-the-brooks":{"set":{"cl":[["Project registered with DLD (project 4532, Active)","verified","registry","https://dubairealestateiq.com/project/the-brooks-at-sobha-sanctuary"],["Escrow account (Dubai Islamic Bank)","verified","registry","https://dubairealestateiq.com/project/the-brooks-at-sobha-sanctuary"],["Construction at 0% (DLD inspection 15 Jul 2026)","verified","registry","https://dubairealestateiq.com/project/the-brooks-at-sobha-sanctuary"],["Developer entity registered: Sobha L.L.C (DLD developer 966)","verified","registry","https://dubairealestateiq.com/project/the-brooks-at-sobha-sanctuary"],["Developer track record: 21 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/sobha"],["Handover 2029 (Sobha investor update) / Q3 2029 (A1) [DLD registered completion 31 Aug 2030]","contradicted","registry","https://dubairealestateiq.com/project/the-brooks-at-sobha-sanctuary"],["147 launch units (investor update) [DLD lists 185 units; later releases may explain the gap]","contradicted","registry","https://dubairealestateiq.com/project/the-brooks-at-sobha-sanctuary"],["Starting price AED 4,160,000 (A1) versus AED 7.35M (Sobha) [no registered sales median published yet]","contradicted","none","https://sobharealty.com/properties-in-dubai/sobha-sanctuary/the-brooks"],["Construction not yet started (registered start 1 Jan 2027)","verified","registry","https://dubairealestateiq.com/project/the-brooks-at-sobha-sanctuary"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/the-brooks-at-sobha-sanctuary-dubailand-dubai"],["No guaranteed returns advertised","unverified","none","https://sobharealty.com/properties-in-dubai/sobha-sanctuary/the-brooks"],["DLD project register: project 4532, status Active, completion date on the register 31 Aug 2030, 0% built at the DLD inspection of 15 Jul 2026, escrow account bank Dubai Islamic Bank, registered developer Sobha L.L.C (DLD developer 966) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/the-brooks-at-sobha-sanctuary"]],"rvw":null}},"sola-residences-centurion-al-furjan":{"set":{"cl":[["Registered on the DLD project register as project no. 3513 on 5 Feb 2025","verified","registry","https://dubairealestateiq.com/project/sola-residences"],["Escrow account held at Emirates Islamic Bank","verified","registry","https://dubairealestateiq.com/project/sola-residences"],["Construction stage: 23.58% built at DLD inspection on 28 Jul 2026","verified","registry","https://dubairealestateiq.com/project/sola-residences"],["Developer entity Sola Residences Real Estate Development L.L.C registered with DLD (developer no. 2135)","verified","registry","https://dubairealestateiq.com/project/sola-residences"],["Project has 260 units on the register","verified","registry","https://dubairealestateiq.com/project/sola-residences"],["Developer group track record on DLD: 2 finished projects (7 total, 5 active)","verified","registry","https://dubairealestateiq.com/developer/royal-centurion"],["Handover Q4 2027 (developer)","unverified","none","https://www.centurionproperties.ae/?p=300"],["Unit mix 10 studios, 95 1BR, 133 2BR, 22 3BR (total 260)","verified","registry","https://dubairealestateiq.com/project/sola-residences"],["Price from AED 1.1M","unverified","none","https://www.propertyfinder.ae/en/new-projects/taraf-holding/cello"],["DLD project register: project 3513, status Active, completion date on the register 15 Sep 2027, 23.58% built at the DLD inspection of 28 Jul 2026, escrow account bank Emirates Islamic Bank, registered developer Sola Residences Real Estate Development L.L.C (DLD developer 2135) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sola-residences"]],"rvw":null}},"solara-del-mar-los-cabos":{"set":{"rvw":null}},"solaria-los-cabos-los-cabos":{"set":{"rvw":null}},"solea-jaco-beach-kapital-group":{"set":{"rvw":null}},"solea-saadiyat-taraf":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q2) comes from the sources listed on the page.","https://www.tarafholding.com/en/project/solea"],"co":null,"sq":{"handover":"registry","price":"registry","developer":"registry"},"miss":null}}},"solea-zabela-beach-terra-partner":{"set":{"rvw":null}},"solera-ras-al-khaimah":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/rak-properties/solera-downtown-mina"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Solera\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"Solera\", In progress), read 13 Nov 2026"},"rvw":null,"src":["https://meconstructionnews.com/63626/rak-properties-unveils-solera","https://www.engelvoelkers.com/ae/de/off-plan/solera-by-rak-properties","https://www.propertyfinder.ae/en/new-projects/rak-properties/solera-downtown-mina","https://www.rakproperties.ae/our-properties/solera/","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"solmera-coast":{"set":{"rvw":null}},"son-cladera-palma-new-development":{"set":{"rvw":null}},"sondris-arthaland":{"set":{"rvw":null}},"sonne-finestrat-sonne-investments":{"set":{"rvw":null}},"soondri-wongamat-craftwork":{"set":{"rvw":null}},"sora-beach-residences-aark":{"set":{"cl":[["Registered with RAK RERA","verified","registry","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list"],["Handover Q4 2026 (portals) vs Q4 2027 (brochure)","contradicted","none","https://storage.propick.ae/projects/1181/brochure/sora-beach-residences-brochure17779423223546.pdf"],["109 units (Propick) vs 663 units (brochure)","contradicted","none","https://propick.ae/en/project/sora_beach_residences"],["Escrow account","unverified","none","https://www.directdxb.com/projects/aark-developers-sora-beach-residences"],["Freehold","unverified","none","https://www.directdxb.com/projects/aark-developers-sora-beach-residences"],["600 m of beach frontage","unverified","none","https://www.directdxb.com/projects/aark-developers-sora-beach-residences"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Sora Beach Residences By AARK, Al Marjan Island\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"rvw":null,"src":["https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list","https://www.directdxb.com/projects/aark-developers-sora-beach-residences","https://www.seafront.ae/project/sora-beach-residences-1001272","https://propick.ae/en/project/sora_beach_residences","https://storage.propick.ae/projects/1181/brochure/sora-beach-residences-brochure17779423223546.pdf","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"sora-denia-taylor-wimpey":{"set":{"cl":[["86 apartments in six buildings, two phases","verified","independent","https://www.rightmove.co.uk/properties/169260455"],["Investment EUR 23 million","verified","independent","https://brainsre.news/taylor-wimpey-espana-32-millones-viviendas-alicante/"],["Handover September 2027 (launch article)","contradicted","none","https://taylorwimpeyspain.com/?p=211903"],["Delivery February 2028 (current project page and Rightmove)","unverified","none","https://taylorwimpeyspain.com/property/sora-denia/"],["Prices from EUR 315,000 plus VAT at launch","contradicted","none","https://taylorwimpeyspain.com/property/sora-denia/"],["Construction under way (July 2026 video)","unverified","none","https://taylorwimpeyspain.com/property/sora-denia/"],["Taylor Wimpey España delivered 504 homes in 2024","verified","independent","https://alicanteplaza.es/taylor-wimpey-entregas-viviendas-2024"],["Building licence granted","unverified","none","https://taylorwimpeyspain.com/property/sora-denia/"],["Deposits protected by bank guarantee","unverified","none","https://taylorwimpeyspain.com/property/sora-denia/"],["Energy rating A","verified","independent","https://brainsre.news/taylor-wimpey-espana-32-millones-viviendas-alicante/"],["The developer page read on 13 Nov 2026 prints: \"Estimated completion date: February 2028\"","unverified","none","https://taylorwimpeyspain.com/property/sora-denia/"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Estimated completion date: February 2028\"","https://taylorwimpeyspain.com/property/sora-denia/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null},"url":"https://taylorwimpeyspain.com/property/sora-denia/"}},"soto-grande-ras-al-khaimah":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not listed","RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"ho":["none","no date published","https://ellingtonproperties.ae/en/property-for-sale/soto-grande-ras-al-khaimah"],"co":null,"sq":{},"miss":["not found on the official register: RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)"]}}},"soul-fumba-cps-africa":{"set":{"rvw":null}},"soul-north-coast-emaar-misr":{"set":{"rvw":null}},"soul-tulum-surreal-developments":{"set":{"rvw":null}},"south-bay-puerto-vallarta-verde-vallarta":{"set":{"rvw":null}},"south-beach-surfers-paradise-andrews":{"set":{"rvw":null}},"southmed-talaat-moustafa-group":{"set":{"rvw":null}},"sovereign-bay-at-gulf-of-goa-estate-villas-goa":{"set":{"rvw":null}},"sparklz-danube-al-furjan":{"set":{"cl":[["Registered on the DLD project register as project no. 3611 on 14 Apr 2025","verified","registry","https://dubairealestateiq.com/project/sparklz-by-danube"],["Escrow account held at Ajman Bank","verified","registry","https://dubairealestateiq.com/project/sparklz-by-danube"],["Construction stage: 7.75% built at DLD inspection on 25 Aug 2026","verified","registry","https://dubairealestateiq.com/project/sparklz-by-danube"],["Developer entity Danube Properties Development L.L.C registered with DLD (developer no. 1009)","verified","registry","https://dubairealestateiq.com/project/sparklz-by-danube"],["Project has 358 units on the register","verified","registry","https://dubairealestateiq.com/project/sparklz-by-danube"],["Developer group track record on DLD: 19 finished projects (42 total, 23 active)","verified","registry","https://dubairealestateiq.com/developer/danube"],["Completion Q2 2028","verified","registry","https://dubairealestateiq.com/project/sparklz-by-danube"],["356 apartments (developer) vs 358 units on register","contradicted","registry","https://dubairealestateiq.com/project/sparklz-by-danube"],["Starting price AED 900,000","unverified","none","https://danubeproperties.com/portfolio/sparklz/"],["Danube known for timely delivery","unverified","none","https://danubeproperties.com/portfolio/sparklz/"],["DLD project register: project 3611, status Active, completion date on the register 31 May 2028, 7.75% built at the DLD inspection of 25 Aug 2026, escrow account bank Ajman Bank /, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sparklz-by-danube"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/sparklz-by-danube"],"ho":["future","DLD register completion 31 May 2028; 7.75% built at the inspection of 25 Aug 2026","https://dubairealestateiq.com/project/sparklz-by-danube"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/sparklz-by-danube"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"st":"under construction","url":"https://danubeproperties.com/portfolio/sparklz/"}},"spatia-melides-eurosuez":{"set":{"rvw":null}},"spyglass-jamaica":{"set":{"rvw":null}},"st-paul-s-quarter":{"set":{"rvw":null}},"st-regis-residences-houston-satya":{"set":{"rvw":null}},"st-regis-residences-miami-brickell-related-integra":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77417 \"1809 BRICKELL, A CONDO\", developer entity named in the filing (matched by the street address in the project name)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["USD 527M construction loan from TYKO Capital (Sep 2024)","verified","independent","https://theamericandeveloper.com/news/related-integra-st-regis-brickell-80-percent-sold/"],["Groundbreaking 21 Nov 2024","verified","independent","https://www.oftmw.com/projects/the-st-regis-residences-miami/"],["Over 80% sold, about USD 900M in contracts","unverified","none","https://theamericandeveloper.com/news/related-integra-st-regis-brickell-80-percent-sold/"],["USD 47M penthouse contract","unverified","none","https://www.brgintl.com/st-regis-brickell-marina/"],["Marina approved","contradicted","independent","https://traded.co/blog/st-regis-brickell-eyes-waterfront-marina-as-tower-nears-completion/"],["Completion December 2027","unverified","none","https://www.oftmw.com/projects/the-st-regis-residences-miami/"],["Tequesta archaeological site found during construction (Jul 2025)","verified","independent","https://www.oftmw.com/projects/the-st-regis-residences-miami/"],["152 residences over 50 storeys","verified","independent","https://theamericandeveloper.com/news/related-integra-st-regis-brickell-80-percent-sold/"],["Prices above USD 4.6M","unverified","none","https://luxurydade.com/blog/brickell-pre-construction-condos-complete-guide-2026"],["Deposits held in escrow","unverified","none","https://www.oftmw.com/projects/the-st-regis-residences-miami/"]],"ev":{"permit":"Florida DBPR developer summary (official CSV, read 13 Nov 2026): PR77417 1809 BRICKELL, A CONDO by named in the filing","escrow":"Not stated","progress":"oftmw.com: going vertical mid-2025 with two tower cranes; American Developer (Aug 2026): tower to top out later in 2026","plans":"No floor plans found","record":"Related Group record stated by agencies only","returns_ok":"No rental guarantee; pure residential with no hotel component"},"pn":"Florida DBPR condominium filing PR77417","rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["not checked","date on record 2027-Q4 not re-checked on the review date",null],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"developer","permit":"registry","price":"press","developer":"registry"},"miss":["handover status not resolved"]},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77417","code":"PR77417","checked":"2026-11-13"}}},"station-m-new-zealand":{"set":{"rvw":null}},"stellar-bay-nairobi":{"set":{"rvw":null}},"stellar-by-elie-saab-emirates-developments":{"set":{"rvw":null}},"still-sukhumvit-20-sc-asset":{"set":{"cl":[["ONEP EIA register lists report 256810-25 for \"โครงการ สติลล์ สุขุมวิท 20 (STILL Sukhumvit 20)\" with no approval number (filed, not approved at the time of reading)","unverified","registry","https://eia.onep.go.th/services/web/open-api/eia-list?page=138"],["EIA report filed for STILL Sukhumvit 20 by SC CD5 Co., Ltd.","verified","registry","https://eia.onep.go.th/eia/detail?id=15426"],["EIA approved","unverified","independent","https://prop2morrow.com/863525/"],["Project value THB 6,000M, 124 units","verified","independent","https://www.forbesthailand.com/news/property/sc-asset-reinforces-its-leadership-in-luxury-condominiums-with-its-latest-project-still-sukhumvit-20-achieving-60-sales-before-official-launch"],["Over 60% sold, half to foreigners","verified","independent","https://www.prachachat.net/hilight-prachachat/news-1953043"],["Construction start April 2026","unverified","none","https://prop2morrow.com/863525/"],["Transfers from mid-2028","unverified","none","https://www.prachachat.net/hilight-prachachat/news-1953043"],["Freehold land","unverified","none","https://prop2morrow.com/863525/"],["Price from THB 30M","verified","independent","https://www.constructionthailand.net/property/sc-asset-still-sukhumvit-20/"],["JV with Tokyo Tatemono","unverified","none","https://prop2morrow.com/863525/"],["Construction status 'not yet built' at EIA filing","verified","registry","https://eia.onep.go.th/eia/detail?id=15426"]],"rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found, not approved","Thailand ONEP EIA register (report 256810-25, no approval number)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["not checked","date on record 2028-Q3 not re-checked on the review date",null],"co":null,"sq":{"permit":"registry","price":"press"},"miss":["handover status not resolved"]},"rw":{"register":"Thailand ONEP EIA register","item":"environmental approval","status":"filed, not approved","detail":null,"code":"256810-25","checked":"2026-11-13"},"src":["https://eia.onep.go.th/eia/detail?id=15426","https://nestopa.com/th-en/project/still-sukhumvit-20-17247","https://prop2morrow.com/863525/","https://www.constructionthailand.net/property/sc-asset-still-sukhumvit-20/","https://www.forbesthailand.com/news/property/sc-asset-reinforces-its-leadership-in-luxury-condominiums-with-its-latest-project-still-sukhumvit-20-achieving-60-sales-before-official-launch","https://www.prachachat.net/hilight-prachachat/news-1953043","https://www.scasset.com/th/condominium/still-sukhumvit-20/","https://www.siamrealestate.com/detail/bangkok/apartment-condo/foreign-freehold/still-sukhumvit-20","https://eia.onep.go.th/services/web/open-api/eia-list?page=138"]}},"stud-este-france":{"set":{"rvw":null}},"sukoon-by-sanzen":{"set":{"rvw":null}},"suku-residences":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2027-Q2; developer page read on 13 Nov 2026: \"0 Build Area 108 to 312 sqm Land Area 105 to 358 sqm Lease 30 + 30 years Start Early 2026 Completion Mid 2027 Choose Your Villa Villa Types 3 Bedroom\"","https://www.balitecture.com/developments/suku-residences"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer"},"miss":null}}},"sun-ponte-residence-da-nang":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Vietnam","https://kolaboro.com/registers/"],"ho":["completed","handed over (press report that handover started in March 2026, already on record); status completed","https://vietnamnet.vn/ban-giao-dung-le-hoi-phao-hoa-cu-dan-sun-ponte-residence-don-dac-quyen-hiem-co-2519604.html"],"co":null,"sq":{"handover":"developer","price":"press"},"miss":null},"st":"completed"}},"sunday-towers-yerevan":{"set":{"rvw":null}},"sunny-golf-costa-del-sol":{"set":{"rvw":null}},"sunpao-village-krabi":{"set":{"rvw":null}},"sunset-bay-2-by-imtiaz":{"set":{"cl":[["Estimated completion date published as \"Q1 2027\"; the FAQ says \"the expected completion timeline will be in Q1 2027\"","unverified","none","https://imtiaz.ae/property/sunset-bay-2-by-imtiaz"],["Construction progress shown as 90 overall: finishing works 88, MEP works 89, super-structure 100","unverified","none","https://imtiaz.ae/property/sunset-bay-2-by-imtiaz"],["1 and 2-bedroom apartments and limited 3-bedroom penthouses on Dubai Islands","unverified","none","https://imtiaz.ae/property/sunset-bay-2-by-imtiaz"],["The FAQ lists payment structures such as 50/50, 60/40 or 70/30 between construction and handover","unverified","none","https://imtiaz.ae/property/sunset-bay-2-by-imtiaz"],["Pin: coordinates of the map embedded on the developer page (labelled \"Sunset Bay 2 by Imtiaz\"); the address is the one published by the developer","unverified","none","https://imtiaz.ae/property/sunset-bay-2-by-imtiaz"],["DLD project register: project 3570, status Active, completion date on the register 20 Feb 2027, 70.2% built at the DLD inspection of 4 Aug 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Real Estate Investment & Development L.L.C (DLD developer 1129) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sunset-bay-two-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3570, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 4 Aug 2026: 70.2% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3570","rvw":null,"src":["https://imtiaz.ae/property/sunset-bay-2-by-imtiaz","https://dubairealestateiq.com/project/sunset-bay-two-by-imtiaz"]}},"sunset-bay-3-by-imtiaz":{"set":{"cl":[["Estimated completion date published as \"Q1 2027\"; the FAQ says \"The anticipated completion and handover are scheduled for Q1 2027.\"","unverified","none","https://imtiaz.ae/property/sunset-bay-3-by-imtiaz"],["The payment plan answer on the same page says \"40% on completion in June 2026\", a date earlier than the Q1 2027 handover the page shows","unverified","none","https://imtiaz.ae/property/sunset-bay-3-by-imtiaz"],["Construction progress shown as 81 overall: finishing works 79, MEP works 68, super-structure 100, sub-structure 100","unverified","none","https://imtiaz.ae/property/sunset-bay-3-by-imtiaz"],["1 and 2-bedroom apartments and 3-bedroom penthouses, delivered fully furnished (the FAQ names Miele, Gessi and Villeroy & Boch)","unverified","none","https://imtiaz.ae/property/sunset-bay-3-by-imtiaz"],["Pin: coordinates of the map embedded on the developer page (labelled \"Sunset Bay 3 by Imtiaz\"); the address is the one published by the developer","unverified","none","https://imtiaz.ae/property/sunset-bay-3-by-imtiaz"],["DLD project register: project 3604, status Active, completion date on the register 20 Mar 2027, 60.04% built at the DLD inspection of 17 Sep 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Sunset Real Estate Development L.L.C (DLD developer 2157) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sunset-bay-three-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3604, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 17 Sep 2026: 60.04% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3604","rvw":null,"src":["https://imtiaz.ae/property/sunset-bay-3-by-imtiaz","https://dubairealestateiq.com/project/sunset-bay-three-by-imtiaz"]}},"sunset-bay-4-by-imtiaz":{"set":{"cl":[["Estimated completion date published as \"Q2 2027\"","unverified","none","https://imtiaz.ae/property/sunset-bay-4-by-imtiaz"],["Construction progress shown as 78 overall: finishing works 75, MEP works 65, super-structure 100","unverified","none","https://imtiaz.ae/property/sunset-bay-4-by-imtiaz"],["30 one-bedroom and 32 two-bedroom apartments and 1 three-bedroom residence; Ground + 2 podium parking levels + 8 residential floors + rooftop","unverified","none","https://imtiaz.ae/property/sunset-bay-4-by-imtiaz"],["Payment plan published: 20% on booking (May 2025), 40% in instalments during construction, 40% on completion in June 2027","unverified","none","https://imtiaz.ae/property/sunset-bay-4-by-imtiaz"],["Pin: coordinates of the map embedded on the developer page (labelled \"Sunset Bay 4 by Imtiaz\"); the address is the one published by the developer","unverified","none","https://imtiaz.ae/property/sunset-bay-4-by-imtiaz"],["DLD project register: project 3714, status Active, completion date on the register 15 May 2027, 53% built at the DLD inspection of 29 Sep 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Sunset Real Estate Development L.L.C (DLD developer 2157) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sunset-bay-four-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3714, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 29 Sep 2026: 53% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3714","rvw":null,"src":["https://imtiaz.ae/property/sunset-bay-4-by-imtiaz","https://dubairealestateiq.com/project/sunset-bay-four-by-imtiaz"]}},"sunset-bay-5-by-imtiaz":{"set":{"cl":[["Estimated completion date published as \"Q4 2027\"; the FAQ says \"The anticipated completion and handover are scheduled for October 2027.\"","unverified","none","https://imtiaz.ae/property/sunset-bay-5-by-imtiaz"],["Construction progress shown as 58 overall: finishing works 46, MEP works 35, super-structure 100","unverified","none","https://imtiaz.ae/property/sunset-bay-5-by-imtiaz"],["1, 2 and 3-bedroom residences on Dubai Islands","unverified","none","https://imtiaz.ae/property/sunset-bay-5-by-imtiaz"],["Payment plan published: 20% on booking, instalments during construction, 40% on completion","unverified","none","https://imtiaz.ae/property/sunset-bay-5-by-imtiaz"],["Pin: coordinates of the map embedded on the developer page (labelled \"Sunset Bay 5 by Imtiaz\"); the address is the one published by the developer","unverified","none","https://imtiaz.ae/property/sunset-bay-5-by-imtiaz"],["DLD project register: project 3811, status Active, completion date on the register 15 Oct 2027, 44.53% built at the DLD inspection of 5 Oct 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Ug Real Estate Development L.L.C (DLD developer 2212) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sunset-bay-five-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3811, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 5 Oct 2026: 44.53% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3811","rvw":null,"src":["https://imtiaz.ae/property/sunset-bay-5-by-imtiaz","https://dubairealestateiq.com/project/sunset-bay-five-by-imtiaz"]}},"sunset-bay-by-imtiaz":{"set":{"rvw":null}},"sunset-bay-grand-by-imtiaz":{"set":{"cl":[["Estimated completion date published as \"Q4-2027\"","unverified","none","https://imtiaz.ae/property/sunset-bay-grand-by-imtiaz"],["Ground, 2 podium levels, 10 floors and rooftop: 51 one-bedroom and 43 two-bedroom apartments and 4 three-bedroom duplexes (98 units)","unverified","none","https://imtiaz.ae/property/sunset-bay-grand-by-imtiaz"],["Prices from AED 1.95 million (one-bedroom), AED 2.91 million (two-bedroom) and AED 4.71 million (three-bedroom)","unverified","none","https://imtiaz.ae/property/sunset-bay-grand-by-imtiaz"],["Construction progress shown as 23 overall: sub-structure 100, super-structure 60, MEP works 1, finishing works 0","unverified","none","https://imtiaz.ae/property/sunset-bay-grand-by-imtiaz"],["Payment plan published: 20% on booking, six instalments up to July 2027, 40% on completion","unverified","none","https://imtiaz.ae/property/sunset-bay-grand-by-imtiaz"],["Map embedded on the developer page points to 25.291485, 55.295704","unverified","none","https://imtiaz.ae/property/sunset-bay-grand-by-imtiaz"],["DLD project register: project 3868, status Active, completion date on the register 15 Feb 2028, 16.29% built at the DLD inspection of 17 Aug 2026, escrow account bank First Abu Dhabi Bank, registered developer Imtiaz Ghd Real Estate Development L.L.C (DLD developer 1641) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/sunset-bay-grand-by-imtiaz"],["The developer page read on 13 Nov 2026 prints: \"construction progress 23 overall ESTIMATED COMPLETION DATE Q4-2027\"","unverified","none","https://imtiaz.ae/property/sunset-bay-grand-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 3868, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 17 Aug 2026: 16.29% built (DLD project register, mirrored on dubairealestateiq.com)"},"pn":"DLD project registration 3868","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/sunset-bay-grand-by-imtiaz"],"ho":["future","DLD register completion 15 Feb 2028; 16.29% built at the inspection of 17 Aug 2026; developer page: \"construction progress 23 overall ESTIMATED COMPLETION DATE Q4-2027\"","https://dubairealestateiq.com/project/sunset-bay-grand-by-imtiaz"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/sunset-bay-grand-by-imtiaz"],"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"src":["https://imtiaz.ae/property/sunset-bay-grand-by-imtiaz","https://dubairealestateiq.com/project/sunset-bay-grand-by-imtiaz"]}},"sunset-cove":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mauritius","https://kolaboro.com/registers/"],"ho":["none","no date published","https://2futures.com/projects/sunset-cove"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"sunset-groves-the-ellinikon-little-athens":{"set":{"rvw":null}},"sunset-sailors-by-tm-costa-blanca":{"set":{"rvw":null}},"sunstone-imkan":{"set":{"rvw":null}},"sunway-cochrane-sunway-cochrane-residences":{"set":{"rvw":null}},"sunway-velocity-3-sunway-property":{"set":{"cl":[["KPKT TEDUH register lists advertising and sales permit 30685-1/04-2027/0328(A)-(S) for Sunway Velocity 3 (30685-1), valid 2024-04-19 to 2027-04-18","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Developer Sunway Velocity Three Sdn. Bhd. holds developer licence 30685/01-2029/0027(A) (valid 2024-01-24 to 2029-01-23); register status Aktif","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Register shows construction progress of 53.11 / 54.30% (latest 7(f) report in HIMS), overall status \"Lancar\" (Malay for on track)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Vacant possession due 24 May 2027 under the first sale agreement (Jadual H, 36 months, first SPA 24 May 2024); the register records an approved extension of 12 months to 24 May 2028","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Advertising permit 30685-1/04-2027/0328(A)-(S) is valid","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Developer licence 30685/01-2029/0027(A) held by Sunway Velocity Three Sdn Bhd","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Expected completion May 2028","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Original SPA delivery 36 months (May 2027) extended by 12 months","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Towers about 53-54% built and on track","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Tower A topped out","verified","independent","https://theedgemalaysia.com/node/821926"],["1,604 units (Tower A 1,036, Tower B 568)","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Prices RM761k to RM1.279M","verified","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Towers are 61 storeys","contradicted","registry","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],["Earlier Sunway Velocity phases fully sold","verified","independent","https://theedgemalaysia.com/node/710932"],["Leasehold to 2121","unverified","none","https://sunwayproperty.com/apdl/"],["No guaranteed rental return offered","unverified","none","https://www.sunwayvelocity3.com/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Malaysia KPKT TEDUH register","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],"ho":["future","date on record 2028-Q2; checked against: Vacant possession due 24 May 2027 under the first sale agreement (Jadual H, 36 months, first SPA 24 May 2024); the register records an approved extension of 12 months to 24 May 2028","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],"co":["found","KPKT developer licence (TEDUH)","https://teduh.kpkt.gov.my/api/projek-swasta/30685-1"],"sq":{"handover":"registry","permit":"registry","price":"registry","developer":"registry"},"miss":null},"rw":{"register":"Malaysia KPKT TEDUH register","item":"advertising and sales permit","status":"active","detail":"permit 30685-1/04-2027/0328(A)-(S) valid to 2027-04-18; progress 53.11/54.30%","code":"30685-1","checked":"2026-11-13"}}},"sunway-wellesley":{"set":{"rvw":null}},"sydney-house-first-sponsor-icd":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","official register for Sydney not looked up on the review date","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2027-Q4 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: official register for Sydney not looked up on the review date","handover status not resolved"]}}},"syncord-tower-lagos":{"set":{"rvw":null}},"tabua-tower-suva-frontier-investments":{"set":{"rvw":null}},"tait-pattaya-raimon-land":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["not checked","date on record 2029-Q3 not re-checked on the review date",null],"co":null,"sq":{"handover":"press","permit":"developer","price":"portal","developer":"press"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"takaya-union-properties":{"set":{"cl":[["Project registered with DLD (project 3112, Active)","verified","registry","https://dubairealestateiq.com/project/takaya"],["Escrow account (Dubai Islamic Bank)","verified","registry","https://dubairealestateiq.com/project/takaya"],["Handover Q4 2027","verified","registry","https://dubairealestateiq.com/project/takaya"],["Construction under way (15.62% at DLD inspection 5 Aug 2026)","verified","registry","https://dubairealestateiq.com/project/takaya"],["744 apartments, 39 townhouses and 5 villas (788 homes); DLD register lists 822 units, which may include retail units, so the counts do not match","contradicted","registry","https://dubairealestateiq.com/project/takaya"],["Developer is a DFM listed company (UPP)","unverified","none","https://up.ae/wp-content/uploads/2025/04/Press-Release-Oct-2024.pdf"],["Starting price AED 850,000","unverified","none","https://up.ae/takaya-by-up/"],["Registered sales occur at about AED 1,900 per sq ft, studios from about AED 754k median","verified","registry","https://dubairealestateiq.com/project/takaya"],["Freehold in Motor City master community","unverified","none","https://up.ae/wp-content/uploads/2024/09/TAKAYA-Brochure.pdf"],["Delivered A1 Loze Villas (1992), Al Mussalla Towers (1999), UP Tower","unverified","none","https://up.ae/about-us/"],["DLD project register: project 3112, status Active, completion date on the register 31 Dec 2027, 15.62% built at the DLD inspection of 5 Aug 2026, escrow account bank Dubai Islamic Bank, registered developer Takaya Real Estate Development L.L.C (DLD developer 1923) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/takaya"]],"rvw":null}},"talaia-residences-adeje-avantespacia":{"set":{"rvw":null}},"tanja-waterfront-tangier":{"set":{"rvw":null}},"tao-monte-rocella-tao-mexico":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["passed-unconfirmed","late (phase 2 date on record, July 2026, has passed; no delivery announcement found in a search on 13 Nov 2026; the developer progress page has moved)","https://www.taomonterocella.com/"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"portal","developer":"registry"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)"]}}},"tara-park-modon":{"set":{"rvw":null}},"tasvan-lombok-selong-belanak-tasvan":{"set":{"rvw":null}},"tbilisi-downtown-by-next-next-group":{"set":{"rvw":null}},"tcc-helices-tulum":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2026-Q4) comes from the sources listed on the page.","https://www.tulumcountryclub.com/es/propiedades/apartamento-helices"],"co":null,"sq":{"handover":"press","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"tcc-park-garden-tulum":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Mexico","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"permit":"registry","developer":"registry"},"miss":null}}},"tcrw-soho-london":{"set":{"cl":[["\"Estimated completion Q1 2026\"","unverified","none","https://www.galliardhomes.com/tcrw-soho"],["Status \"Off-plan\"; 81 studio, one, two and three-bedroom apartments and 12 penthouses","unverified","none","https://www.galliardhomes.com/tcrw-soho"],["Prices from GBP 1,600,000","unverified","none","https://www.galliardhomes.com/tcrw-soho"],["The page says the final penthouse is coming to the market soon","unverified","none","https://www.galliardhomes.com/tcrw-soho"],["Companies House: Galliard Homes Limited, company number 02158998, Active, incorporated 28 August 1987 (read 13 Nov 2026)","verified","registry","https://find-and-update.company-information.service.gov.uk/company/02158998"],["The developer page read on 13 Nov 2026 prints: \"Estimated completion Q1 2026\"","unverified","none","https://www.galliardhomes.com/tcrw-soho"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for United Kingdom","https://kolaboro.com/registers/"],"ho":["passed-unconfirmed","On 13 Nov 2026 the developer page still prints \"Estimated completion Q1 2026\" and \"Off-plan\"; no source we read confirms completion.","https://www.galliardhomes.com/tcrw-soho"],"co":["found","Companies House","https://find-and-update.company-information.service.gov.uk/company/02158998"],"sq":{"handover":"developer","price":"developer","developer":"registry"},"miss":null},"src":["https://www.galliardhomes.com/tcrw-soho","https://find-and-update.company-information.service.gov.uk/company/02158998"]}},"temple-heights":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["future","date on record 2027-Q1; developer page read on 13 Nov 2026: \"iverside, Sold, 15 100 2 Riverside, Sold, Project Timeline 40 % Start of Construction Handover in January 2027 Payment Plan 1 10% Booking Fee Due Dili\"","https://investlandbali.com/listing/temple-heights"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"teneriffe-banks-kokoda-property":{"set":{"rvw":null}},"terra-mare-beach-villas-maenam":{"set":{"rvw":null}},"terrace-heights":{"set":{"rvw":null}},"terracos-do-monte-vanguard-properties":{"set":{"rvw":null}},"terrakuta-kuta-lombok":{"set":{"rvw":null}},"terratamo-lombok":{"set":{"rvw":null}},"terrazas-do-porto":{"set":{"rvw":null}},"thalassa-residences-2":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Cyprus","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.cybarco.com/project/thalassa-residences-2/"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"the-anderson-chatswood-huirong-changfa":{"set":{"rvw":null}},"the-anti-galerie-hotel-trazos-urbanos":{"set":{"rvw":null}},"the-archive-by-imtiaz-dubai":{"set":{"rvw":null}},"the-arton-by-rockwell":{"set":{"rvw":null}},"the-ashwood-kuala-lumpur":{"set":{"rvw":null}},"the-astera-interiors-by-aston-martin":{"set":{"cl":[["The page says \"handover scheduled for December 2028\"","unverified","none","https://darglobal.co.uk/the-astera"],["Status shown as \"Under Development\"","unverified","none","https://darglobal.co.uk/the-astera"],["1 to 3-bedroom residences and 3-bedroom beach villas; the listing gives 682 to 12,277 sq ft and the FAQ gives 61 to 265 sqm","unverified","none","https://darglobal.co.uk/the-astera"],["No price and no permit number are printed on the developer page","unverified","none","https://darglobal.co.uk/the-astera"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"The Astera\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"The Astera\", In progress), read 13 Nov 2026"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["listed","RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"ho":["future","The developer page could not be read on 13 Nov 2026; RAK RERA lists the project as in progress and the date on record (December 2028) is still ahead.","https://darglobal.co.uk/the-astera"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"developer"},"miss":null},"src":["https://darglobal.co.uk/the-astera","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"the-base-cherngtalay":{"set":{"rvw":null}},"the-base-wongsawang":{"set":{"rvw":null}},"the-beach-vista-range":{"set":{"cl":[["Escrow account registered with the regulator","unverified","none","https://jre.ae/projects/the-beach-vista"],["JRE states the escrow is registered with the Dubai Land Department, although the project is in Ras Al Khaimah","contradicted","none","https://jre.ae/projects/the-beach-vista"],["Construction started 1 Oct 2024","unverified","none","https://jre.ae/projects/the-beach-vista"],["2% construction progress","unverified","none","https://jre.ae/projects/the-beach-vista"],["Completion Q4 2027","unverified","none","https://www.prop971.com/project/PRJ-RAN-HEQ06"],["151 units (14 studios, 120 1BR, 17 2BR)","unverified","none","https://gulfnews.com/business/property/range-developments-launches-the-beach-vista-at-al-marjan-island-1.1728978264940"],["Prices from AED 1.14M at launch","unverified","none","https://gulfnews.com/business/property/range-developments-launches-the-beach-vista-at-al-marjan-island-1.1728978264940"],["Range signed an agreement with master developer Marjan to launch three Al Marjan Island projects","verified","independent","https://www.arabianbusiness.com/industries/real-estate/ras-al-khaimah-real-estate-marjan-announces-3-luxury-beachside-property-developments-as-investors-eye-uae"],["Range has developed five-star hotels in Dominica, St Kitts and Grenada","verified","independent","https://www.arabianbusiness.com/industries/real-estate/ras-al-khaimah-real-estate-marjan-announces-3-luxury-beachside-property-developments-as-investors-eye-uae"],["Freehold for foreign buyers on Al Marjan Island","unverified","none","https://jre.ae/projects/the-beach-vista"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"The beach Vista Al Marjan Island\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"ev":{"permit":"Listed by RAK RERA on its 2026 list of registered projects (\"The beach Vista Al Marjan Island\", In progress), read 13 Nov 2026","escrow":"JRE: escrow account","progress":"JRE: 2% complete","plans":"JRE floor plan document","record":"Range launch material (Gulf News partner content) names Park Hyatt St Kitts, InterContinental Dominica Cabrits and Six Senses Grenada; Arabian Business (Feb 2024) reports Range develops five-star hotels in Dominica, St Kitts and Grenada and that Al Marjan is its UAE debut","returns_ok":"No guaranteed returns language found"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry","reg":["listed","RAK RERA \"List and Status of Projects\" 2026 (Ras Al Khaimah Municipality)","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"],"ho":["future","The developer page could not be read on 13 Nov 2026; RAK RERA lists the project as in progress and the date on record (2027-Q4) is still ahead.",null],"co":null,"sq":{"handover":"portal","permit":"registry","price":"press","developer":"press"},"miss":null},"src":["https://gulfnews.com/business/property/range-developments-launches-the-beach-vista-at-al-marjan-island-1.1728978264940","https://jre.ae/projects/the-beach-vista","https://victaura.com/en/insights/escrow-and-the-payment-plan/","https://www.arabianbusiness.com/industries/real-estate/ras-al-khaimah-real-estate-marjan-announces-3-luxury-beachside-property-developments-as-investors-eye-uae","https://www.prop971.com/project/PRJ-RAN-HEQ06","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"the-blossoms-blossoms-residence-accra":{"set":{"rvw":null}},"the-boon-condo-bophut-b2-development":{"set":{"rvw":null}},"the-brickell-tower-peru":{"set":{"rvw":null}},"the-bridges-east-bridge":{"set":{"rvw":null}},"the-bryson-of-chatswood-goldfields":{"set":{"rvw":null}},"the-calinea-tower":{"set":{"rvw":null}},"the-camden-place":{"set":{"rvw":null}},"the-carling":{"set":{"rvw":null}},"the-central-suites-swakopmund-aschenborn":{"set":{"rvw":null}},"the-chatt-huahin-pran":{"set":{"rvw":null}},"the-collections-vol-2-618-development":{"set":{"rvw":null}},"the-colombo-border":{"set":{"rvw":null}},"the-connaught-one":{"set":{"rvw":null}},"the-corner-inn-matola-corner-mozambique":{"set":{"rvw":null}},"the-court-carvoeiro-carvoeiro-branco":{"set":{"rvw":null}},"the-courtyards-the-ellinikon-little-athens":{"set":{"cl":[["\"ESTIMATED COMPLETION DATE: EAST & WEST PLOTS: H1 2030\"","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/the-courtyards"],["Eleven-building residential complex with 324 residences of 1 to 4 bedrooms, 350 metres from the sea","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/the-courtyards"],["Availability shown as \"ON THE MARKET\"; designed by AUDO","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/the-courtyards"],["The developer page read on 13 Nov 2026 prints: \"ESTIMATED COMPLETION DATE: EAST & WEST PLOTS: Η1 2030\"","unverified","none","https://theellinikon.com.gr/en/residences/little-athens/the-courtyards"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Greece","https://kolaboro.com/registers/"],"ho":["future","developer page: \"ESTIMATED COMPLETION DATE: EAST & WEST PLOTS: Η1 2030\"","https://theellinikon.com.gr/en/residences/little-athens/the-courtyards"],"co":null,"sq":{"handover":"developer","developer":"developer"},"miss":null}}},"the-crest-samui":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q4) comes from the sources listed on the page.","https://thewavegroupsamui.com/the-crest-residence-beachfront-villa/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"portal","developer":"developer"},"miss":null}}},"the-ease-canggu":{"set":{"rvw":null}},"the-elements-placencia-latitude-20":{"set":{"rvw":null}},"the-era-by-oxo":{"set":{"rvw":null}},"the-erin-heights":{"set":{"rvw":null}},"the-estates":{"set":{"cl":[["Progress update for the first half of 2025: \"Phases 3 and 4 core and shell construction have reached 98.4% completion.\"","unverified","none","https://www.sodic.com/our-developments/the-estates"],["Villas and townhouses of 353 to 631 m2","unverified","none","https://www.sodic.com/our-developments/the-estates"],["Prices from EGP 77,223,960","unverified","none","https://www.sodic.com/our-developments/the-estates"],["No delivery date is printed on the developer page","unverified","none","https://www.sodic.com/our-developments/the-estates"],["The developer page read on 13 Nov 2026 prints: \"H1 '25 Phases 1 and 2 are fully completed and delivered. Phases 3 and 4 core and shell construction have reached 98.4% completion\"","unverified","none","https://www.sodic.com/our-developments/the-estates"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Egypt","https://kolaboro.com/registers/"],"ho":["phased","Developer progress note for the first half of 2025: phases 1 and 2 delivered; no date for phases 3 and 4.","https://www.sodic.com/our-developments/the-estates"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"the-eveleigh-broadbeach":{"set":{"rvw":null}},"the-first-tower-ambassadori-island-batumi":{"set":{"rvw":null}},"the-fullton":{"set":{"rvw":null}},"the-garden-klabin":{"set":{"rvw":null}},"the-gardens-harbour-island-colwood":{"set":{"rvw":null}},"the-gate-6-aljada-arada":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.arada.com/en/latest-news/arada-launches-the-gate-6-a-new-premium-residential-hub-at-sharjah-megaproject-aljada/"],"co":null,"sq":{"handover":"portal","price":"developer"},"miss":null}}},"the-gateway-liverpool-legacie":{"set":{"rvw":null}},"the-gem-at-cap-cana":{"set":{"rvw":null}},"the-gio-riverside":{"set":{"rvw":null}},"the-golf-colombo-08-prime-residencies":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Sri Lanka","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"price":"developer","developer":"developer"},"miss":null}}},"the-grand-central-hivernage-horizon-morocco":{"set":{"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Morocco","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q4) comes from the sources listed on the page.","https://www.the-grand-central.com/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"portal","developer":"developer"},"miss":null},"url":"https://www.the-grand-central.com/"}},"the-gray-zone-gutierrez-group":{"set":{"rvw":null}},"the-great-escape-2-aida-dar-global":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Oman","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2029-Q2) was not re-checked.","https://darglobal.co.uk/the-great-escape-2-aida-oman"],"co":null,"sq":{"handover":"developer","price":"portal","developer":"developer"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"the-highgrove":{"set":{"cl":[["Completion date published as \"Q4 2027\"","unverified","none","https://thehighgrove.ellingtonproperties.ae/"],["Apartments, penthouses, duplexes and a sky villa; one, two and three-bedroom apartments","unverified","none","https://thehighgrove.ellingtonproperties.ae/"],["Payment plan as published: 20% at booking, staged instalments during construction, 30% on completion","unverified","none","https://thehighgrove.ellingtonproperties.ae/"],["DLD project register: project 4037, status Active, completion date on the register 31 Dec 2028, 7% built at the DLD inspection of 6 Aug 2026, escrow account bank First Abu Dhabi Bank, registered developer Ellington Properties Development L.L.C (DLD developer 1117) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/the-highgrove"]],"ev":{"permit":"Registered as DLD project 4037, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 6 Aug 2026: 7% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Ellington Properties Development L.L.C (DLD developer 1117)","handover_promised":"2027-Q4","unit_types":["1-bedroom apartment","2-bedroom apartment","3-bedroom apartment","penthouse","duplex","sky villa"],"deposit_pct":20,"payment_plan":"20% at booking; 10% at 60 days and 10% at 120 days after reservation; 5% at 240 and 5% at 360 days; 5% each at 20%, 30%, 40% and 50% construction progress; 30% on completion"},"pn":"DLD project registration 4037","rvw":null,"src":["https://thehighgrove.ellingtonproperties.ae/","https://dubairealestateiq.com/project/the-highgrove"],"st":"under construction"}},"the-hillgate-ellington":{"set":{"cl":[["Registered with DLD (project 3594)","verified","registry","https://www.homesearch.ae/for-sale/off-plan/ellington/the-hillgate-3594"],["Escrow at First Abu Dhabi Bank","verified","registry","https://www.homesearch.ae/for-sale/off-plan/ellington/the-hillgate-3594"],["Construction started Mar 2025, 3.12% by Jun 2026","verified","registry","https://dubairealestateiq.com/project/the-hillgate"],["Handover Q4 2027 (portals, HBS 1 Dec 2027)","contradicted","registry","https://dubairealestateiq.com/project/the-hillgate"],["356 units in two towers","verified","registry","https://www.mitchellscommercialrealty.com/projects/the-hillgate"],["Freehold","unverified","none","https://app.ellington.ae/the-hillgate/configuration.html"],["Ellington has 30 completed projects","unverified","none","https://www.prop971.com/project/PRJ-ELL-UIVN4"],["Permit number 0359314974","unverified","none","https://listings.hbsdubai.com/en/building/the-hillgate-by-ellington-properties-dubai/"],["DLD project register: project 3594, status Active, completion date on the register 30 Jun 2028, 3.12% built at the DLD inspection of 4 Jun 2026, escrow account bank First Abu Dhabi Bank, registered developer Ellington Properties Development L.L.C (DLD developer 1117) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/the-hillgate"],["The developer page read on 13 Nov 2026 prints: \"Anticipated Completion Date Q4 2027\"","unverified","none","https://app.ellington.ae/the-hillgate/configuration.html"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/the-hillgate"],"ho":["future","DLD register completion 30 Jun 2028; 3.12% built at the inspection of 4 Jun 2026; developer page: \"Anticipated Completion Date Q4 2027\"","https://dubairealestateiq.com/project/the-hillgate"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/the-hillgate"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"st":"under construction","url":"https://app.ellington.ae/the-hillgate/configuration.html"}},"the-hills-virtudes-funchal-interpatium":{"set":{"rvw":null}},"the-indeed-condo-pattaya-pattaya":{"set":{"rvw":null}},"the-ivory-chang-phueak-home-development-group":{"set":{"rvw":null}},"the-koro-fiji-nadi-bay-investments":{"set":{"rvw":null}},"the-kove-kronos-homes":{"set":{"rvw":null}},"the-kubrick-freemans-bay-ockham":{"set":{"rvw":null}},"the-landmark-mermaid-beach-aniko":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not checked","official register for Gold Coast not looked up on the review date","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028) comes from the sources listed on the page.","https://thelandmarkmermaidbeach.com.au/"],"co":null,"sq":{"handover":"press","price":"press","developer":"press"},"miss":["official register not looked up: official register for Gold Coast not looked up on the review date"]}}},"the-launiu-ward-village-howard-hughes":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not checked","official register for Hawaii not looked up on the review date","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"press","permit":"registry","price":"portal","developer":"press"},"miss":["official register not looked up: official register for Hawaii not looked up on the review date"]}}},"the-legend-city-danang-vipico":{"set":{"rvw":null}},"the-level-apartments-phase-iv-bucharest":{"set":{"rvw":null}},"the-lincoln-coconut-grove":{"set":{"rvw":null}},"the-lume-seri-tanjung-pinang":{"set":{"rvw":null}},"the-meadows-la-cala-golf-resort":{"set":{"cl":[["\"Fecha entrega prevista: Noviembre 2026 (Fase 1) y Agosto 2027 (Fase 2).\" (expected delivery November 2026 for phase 1 and August 2027 for phase 2)","unverified","none","https://taylorwimpeyspain.com/es/casa/the-meadows-la-cala-golf-resort-mijas-malaga/"],["26 townhouses on the golf course with 3 bedrooms; prices from EUR 630,000 (phase 1) and EUR 685,000 (phase 2)","unverified","none","https://taylorwimpeyspain.com/es/casa/the-meadows-la-cala-golf-resort-mijas-malaga/"],["Pin: GPS coordinates printed on the developer page; the address is the one published by the developer","unverified","none","https://taylorwimpeyspain.com/es/casa/the-meadows-la-cala-golf-resort-mijas-malaga/"],["The developer page read on 13 Nov 2026 prints: \"Fecha entrega prevista: Noviembre 2026 (Fase 1) y Agosto 2027 (Fase 2)\"","unverified","none","https://taylorwimpeyspain.com/es/casa/the-meadows-la-cala-golf-resort-mijas-malaga/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["phased","Phase 1 is dated November 2026 (unit table: 10-11-2026) and phase 2 August 2027.","https://taylorwimpeyspain.com/es/casa/the-meadows-la-cala-golf-resort-mijas-malaga/"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"the-minh-kuala-lumpur":{"set":{"rvw":null}},"the-modeva-bangtao":{"set":{"cl":[["ONEP EIA register lists report 256709-44 for \"โครงการอาคารชุด เดอะ ไทเทิล โมเดวา บางเทา\" with approval ทส 1009.5/896 dated 29 Jan 2025","verified","registry","https://eia.onep.go.th/services/web/open-api/eia-list?page=6"],["Developer group release: The Modeva, 859 units on 7.5 acres about 500 m from Bang Tao beach, valued at THB 6.2 billion","verified","developer","https://assetwise.co.th/?p=101046"],["Development profile lists status \"Under Construction\" and completion \"Q4 2026\"","unverified","none","https://rumavi.com/en/new-developments/thailand/bang-tao/the-modeva-bangtao"],["859 units in total, 7 floors as listed on the profile","unverified","none","https://rumavi.com/en/new-developments/thailand/bang-tao/the-modeva-bangtao"],["Ownership recorded on the profile: Foreign Freehold (condominium title under 49% quota)","unverified","none","https://rumavi.com/en/new-developments/thailand/bang-tao/the-modeva-bangtao"],["5 unit types are listed at The Modeva Bangtao, ranging from 1 to 3 bedrooms, between 29 and 148 sqm. Listed prices run from THB 4,275,000 to THB 22,190,000.","unverified","none","https://rumavi.com/en/new-developments/thailand/bang-tao/the-modeva-bangtao"]],"ev":{"permit":"Thailand ONEP EIA open register: report 256709-44, approval ทส 1009.5/896 dated 29 Jan 2025 (read 13 Nov 2026)"},"pn":"EIA report 256709-44, ONEP approval ทส 1009.5/896 (29 Jan 2025)","rvw":{"d":"2026-11-13","ok":false,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256709-44, approval ทส 1009.5/896)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["not checked","date on record 2026-Q4 not re-checked on the review date",null],"co":null,"sq":{"handover":"portal","permit":"registry","price":"portal","developer":"press"},"miss":["handover status not resolved"]},"rw":{"register":"Thailand ONEP EIA register","item":"environmental approval","status":"approved","detail":"approval ทส 1009.5/896 dated 29/01/2568 (Thai calendar)","code":"256709-44","checked":"2026-11-13"},"src":["https://rumavi.com/en/new-developments/thailand/bang-tao/the-modeva-bangtao","https://eia.onep.go.th/services/web/open-api/eia-list?page=6","https://assetwise.co.th/?p=101046"]}},"the-momentum-phuket":{"set":{"rvw":null}},"the-monument-sathon-sansiri":{"set":{"cl":[["Developer construction-progress page (photos taken November 2026): overall progress 2%, expected completion December 2029; it states the EIA has been approved and a construction permit issued","verified","developer","https://www.sansiri.com/projectprogress/en/712"],["Project has EIA approval","verified","registry","https://eia.onep.go.th/eia/detail?id=14566"],["Located on Soi Sathorn 10, Bang Rak","verified","registry","https://eia.onep.go.th/eia/detail?id=14566"],["Sansiri is SET-listed and delivered condominiums in 2025","verified","independent","https://lssmedia.setlink.set.or.th/2025/YE/SIRI-YE68-ListedCompanySnapshot-EN.html"],["185 units on 29 storeys","unverified","none","https://www.sansiri.com/condominium/the-monument-sathon/en/"],["Completion 31 January 2030","unverified","none","https://kellerhenson.com/project/the-monument-sathon"],["Prices from 10.2M THB","unverified","none","https://kellerhenson.com/project/the-monument-sathon"],["Freehold condominium","unverified","none","https://kellerhenson.com/project/the-monument-sathon"]],"ev":{"progress":"Sansiri construction-progress page: 2% (photos November 2026, read 13 Nov 2026)","plans":"Developer page publishes master plan, floor plans by level and 32 unit layouts","record":"SET FY2025 listed company snapshot: Sansiri launched 24 projects in 2025 and began transfers at 5 completed condominiums in 4Q2025","returns_ok":"No guaranteed return or yield on developer page"},"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256801-28, approval 1009.5/9979)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2030-Q1; checked against: Developer construction-progress page (photos taken November 2026): overall progress 2%, expected completion December 2029; it states the EIA has been approved and a construction permit issued","https://www.sansiri.com/projectprogress/en/712"],"co":null,"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":null},"src":["https://eia.onep.go.th/eia/detail?id=14566","https://eia.onep.go.th/eia/detail?id=16476","https://eia.onep.go.th/services/web/open-api/eia-list?page=5","https://kellerhenson.com/project/the-monument-sathon","https://lssmedia.setlink.set.or.th/2025/YE/SIRI-YE68-ListedCompanySnapshot-EN.html","https://www.sansiri.com/condominium/the-monument-sathon/en/","https://www.sansiri.com/projectprogress/en/712"],"url":"https://www.sansiri.com/projectprogress/en/712"}},"the-new-village-edinburgh-park-s1-developments":{"set":{"rvw":null}},"the-next-jedyod-4-ornsirin":{"set":{"rvw":null}},"the-ocean-club-four-seasons-residences-bahamas":{"set":{"rvw":null}},"the-olive-naiyang-rhom-bho":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256811-61, approval ทส 1009.5/9398)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2028-Q4; developer page read on 13 Nov 2026: \"04M ≈ $121,300, 1BR 32 m² 450 m walk to Nai Yang Beach 0% payment plan until handover in Q4 2028 Freehold full foreign ownership · inves\"","https://titleolivephuket.com/"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"registry"},"miss":null}}},"the-one-by-almal-nusa-dua":{"set":{"rvw":null}},"the-one-naiharn":{"set":{"rvw":null}},"the-one-residence-kigali":{"set":{"rvw":null}},"the-parkhouse-musashi-kosugi-towers":{"set":{"rvw":null}},"the-parkhouse-osaka-uehommachi-tower":{"set":{"rvw":null}},"the-peaks-lustica-bay":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Montenegro","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2028-Q4) was not re-checked.",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"portal","developer":"developer"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"the-penthouses-at-goldwynn":{"set":{"rvw":null}},"the-perigon-miami-beach":{"set":{"rvw":null}},"the-pierhead-phase-1-the-steel-building-barbados":{"set":{"rvw":null}},"the-pinnacle-montego-bay-lch":{"set":{"rvw":null}},"the-point-grace-bay-resorts":{"set":{"rvw":null}},"the-reflection-thalawathugoda":{"set":{"rvw":null}},"the-residences-at-mandarin-oriental-miami":{"set":{"rvw":null}},"the-residences-at-the-st-regis-los-cabos-quivira-olarena-hospitality-g":{"set":{"rvw":null}},"the-residences-intercontinental-phuket":{"set":{"rvw":null}},"the-residences-vale-do-lobo-kronos-homes":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2027-Q4) was not re-checked.","https://www.valedolobo.com/en/the-residences-vale-do-lobo/"],"co":null,"sq":{"handover":"press","price":"press"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"the-rider-at-wynwood":{"set":{"rvw":null}},"the-riviera-california-riviera-group":{"set":{"rvw":null}},"the-riviera-palm-beach-wongamat-riviera-group":{"set":{"rvw":null}},"the-sculptura-phu-my-hung":{"set":{"rvw":null}},"the-sea-point-aquacor-apollon":{"set":{"rvw":null}},"the-seasons-colombo-08":{"set":{"rvw":null}},"the-seasons-residences-fuyu-tower-federal-land-nomura":{"set":{"rvw":null}},"the-senique-hanoi-capitaland":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Vietnam","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2027-Q1 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","permit":"developer","developer":"press"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]}}},"the-sharp-first-world-seoul-officetel-phase-seoul":{"set":{"rvw":null}},"the-shoreline-residence-smartcity":{"set":{"rvw":null}},"the-source-terraces-saadiyat-grove":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for UAE","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2027-Q3) was not re-checked.",null],"co":null,"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"the-spring-anahita-beau-champ-alteo":{"set":{"rvw":null}},"the-st-regis-karya-cove-resort-bodrum-and-the-residences-bod":{"set":{"rvw":null}},"the-standard-residences-hua-hin-sansiri":{"set":{"cl":[["ONEP EIA register lists report 14399 for \"โครงการ The Standard Hua Hin (เดอะ สแตนดาร์ด หัวหิน)\" with approval ทส 1010.5/7296.1 dated 29 May 2020 (register name \"The Standard Hua Hin\", applicant company Siripat Five Co., Ltd.; matched by name)","verified","registry","https://eia.onep.go.th/services/web/open-api/eia-list?page=28"],["Developer construction-progress page (photos taken November 2026): overall progress 100%, completion date September 2026; it states the EIA has been approved and a construction permit issued","verified","developer","https://www.sansiri.com/projectprogress/en/589"],["Transfers began October 2026","verified","independent","https://www.prachachat.net/real-estate/news-2083002"],["About 40% sold, 90% Thai buyers","verified","independent","https://brandinside.asia/sansiri-the-standard-residences-hua-hin/"],["Project value THB 4,500M","verified","independent","https://www.prachachat.net/real-estate/news-2083002"],["251 units (agent says 245)","contradicted","independent","https://www.richmonts.com/our-properties/thailand/new-developments/the-standard-residences-hua-hin"],["98% complete, completion Sep 2026","verified","independent","https://embarkestate.com/en/coast/hua-hin/the-standard-residences-hua-hin"],["EIA approved and construction permit issued","unverified","none","https://www.sansiri.com/projectprogress/en/"],["Price from THB 9.59M / 10.65M / 10.99M","contradicted","independent","https://brandinside.asia/sansiri-the-standard-residences-hua-hin/"],["Freehold for foreigners within quota","unverified","none","https://www.richmonts.com/our-properties/thailand/new-developments/the-standard-residences-hua-hin"],["Two beachfront pool villas sold in first week at over THB 100M each","verified","independent","https://www.prachachat.net/real-estate/news-2083002"]],"ev":{"permit":"Thailand ONEP EIA open register: report 14399, approval ทส 1010.5/7296.1 dated 29 May 2020 (read 13 Nov 2026)","progress":"Sansiri monthly tracker: 98% (10 Aug 2026), expected completion Sep 2026","plans":"Brochure unit mix with sizes per type (agent copy)","record":"Prachachat and Brand Inside report on Sansiri's sales and transfers; Sansiri is a listed company","returns_ok":"No yield or guarantee"},"pn":"EIA report 14399, ONEP approval ทส 1010.5/7296.1 (29 May 2020)","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 14399, approval ทส 1010.5/7296.1)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["completed","completed (developer progress page: 100%, completion date September 2026)","https://www.sansiri.com/projectprogress/en/589"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"press","developer":"registry"},"miss":null},"rw":{"register":"Thailand ONEP EIA register","item":"environmental approval","status":"approved","detail":"approval ทส 1010.5/7296.1 dated 29/05/2563 (Thai calendar)","code":"14399","checked":"2026-11-13"},"src":["https://brandinside.asia/sansiri-the-standard-residences-hua-hin/","https://eia.onep.go.th/eia/owner-detail?owner_id=4869","https://embarkestate.com/en/coast/hua-hin/the-standard-residences-hua-hin","https://lionandland.com/projects/the-standard-residences-hua-hin/","https://www.prachachat.net/real-estate/news-2083002","https://www.richmonts.com/our-properties/thailand/new-developments/the-standard-residences-hua-hin","https://www.sansiri.com/%E0%B9%82%E0%B8%8B%E0%B8%99/%E0%B8%AB%E0%B8%B1%E0%B8%A7%E0%B8%AB%E0%B8%B4%E0%B8%99","https://www.sansiri.com/projectprogress/en/","https://eia.onep.go.th/services/web/open-api/eia-list?page=28","https://www.sansiri.com/projectprogress/en/589"],"st":"completed","url":"https://www.sansiri.com/projectprogress/en/589"}},"the-standard-residences-phuket-bang-tao":{"set":{"rvw":null}},"the-sustainable-city-yiti-diamond-developers-see-holding-through-the-j":{"set":{"rvw":null}},"the-symphony-imtiaz":{"set":{"cl":[["Project registered with DLD (project 4193, Active)","verified","registry","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],["Escrow account (United Bank Limited)","verified","registry","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],["Construction at 6.3% (DLD inspection 16 Sep 2026)","verified","registry","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],["Developer entity registered: Imtiaz Symphony Development L.L.C (DLD developer 2537)","verified","registry","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],["Developer track record: 10 finished projects on the DLD register","verified","registry","https://dubairealestateiq.com/developer/imtiaz"],["Construction progress 7% overall (Imtiaz page) [DLD 6.3% at 16 Sep 2026]","verified","registry","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],["Completion Q2 2029","verified","registry","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],["381 units (290 homes, 84 offices, 7 retail) [DLD register lists 369 units]","contradicted","registry","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],["Designed by Zaha Hadid Architects","unverified","none","https://imtiaz.ae/property/the-symphony-by-imtiaz"],["Freehold title available to foreign buyers","unverified","none","https://a1properties.ae/project-details/symphony-by-imtiaz-meydan-horizon-dubai"],["No guaranteed returns advertised","unverified","none","https://imtiaz.ae/property/the-symphony-by-imtiaz"],["DLD project register: project 4193, status Active, completion date on the register 15 Jun 2029, 6.3% built at the DLD inspection of 16 Sep 2026, escrow account bank United Bank Limited (Management Office), registered developer Imtiaz Symphony Development L.L.C (DLD developer 2537) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],["The developer page read on 13 Nov 2026 prints: \"construction progress 8 overall ESTIMATED COMPLETION DATE Q2, 2029\"","unverified","none","https://imtiaz.ae/property/the-symphony-by-imtiaz"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],"ho":["future","DLD register completion 15 Jun 2029; 6.3% built at the inspection of 16 Sep 2026; developer page: \"construction progress 8 overall ESTIMATED COMPLETION DATE Q2, 2029\"","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/imtiaz-symphony-tower"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"st":"under construction","url":"https://imtiaz.ae/property/the-symphony-by-imtiaz"}},"the-title-artrio-bang-tao":{"set":{"cl":[["Developer group release: The Title Artrio Bang-Tao, 435 units on about 3 acres next to Porto de Phuket, valued at THB 2.6 billion","verified","developer","https://assetwise.co.th/?p=101046"],["No record found in the ONEP EIA open register by project name or by the applicant company Rhom Bho Property PCL (searched 13 Nov 2026); a search miss is not proof that no report exists","unverified","registry","https://eia.onep.go.th/services/web/open-api/eia-list"],["Development profile lists status \"Under Construction\" and completion \"Q4 2026\"","unverified","none","https://rumavi.com/en/new-developments/thailand/bang-tao/the-title-artrio-bang-tao"],["435 units in total, 7 floors as listed on the profile","unverified","none","https://rumavi.com/en/new-developments/thailand/bang-tao/the-title-artrio-bang-tao"],["Ownership recorded on the profile: Foreign Freehold (condominium title under 49% quota)","unverified","none","https://rumavi.com/en/new-developments/thailand/bang-tao/the-title-artrio-bang-tao"],["6 unit types are listed at The Title Artrio Bang Tao, ranging from 1 to 2 bedrooms, between 29 and 132 sqm. Listed prices run from THB 4,321,000 to THB 19,668,000.","unverified","none","https://rumavi.com/en/new-developments/thailand/bang-tao/the-title-artrio-bang-tao"]],"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["not checked","date on record 2026-Q4 not re-checked on the review date",null],"co":null,"sq":{"handover":"portal","permit":"registry","price":"portal","developer":"registry"},"miss":["handover status not resolved"]},"src":["https://rumavi.com/en/new-developments/thailand/bang-tao/the-title-artrio-bang-tao","https://assetwise.co.th/?p=101046","https://eia.onep.go.th/services/web/open-api/eia-list"]}},"the-title-cielo-rawai-rhom-bho":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256709-68, approval ทส 1009.5/872)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["passed-unconfirmed","late (Q2 2026 on record has passed; the ONEP record read earlier shows 97.1% built in August 2026; no completion announcement found in a search on 13 Nov 2026)","https://kellerhenson.com/project/the-title-cielo-rawai"],"co":null,"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":null}}},"the-title-coralina-kamala":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2028-Q2; developer page read on 13 Nov 2026: \"e facilities and landscaping Pet-friendly: pets are welcome Q2 2026 Construction start Q2 2028 Completion 564 apartments 8 buil\"","https://coralinakamala.com/"],"co":null,"sq":{"handover":"registry","permit":"registry","price":"press","developer":"registry"},"miss":null}}},"the-title-sierra":{"set":{"cl":[["No record found in the ONEP EIA open register by project name or by the applicant company Rhom Bho Property PCL (searched 13 Nov 2026); a search miss is not proof that no report exists","unverified","registry","https://eia.onep.go.th/services/web/open-api/eia-list"],["Development profile lists status \"Off Plan\" and completion \"Q3 2028\"","unverified","none","https://rumavi.com/en/new-developments/thailand/cherng-talay/the-title-sierra"],["452 units in total, 8 floors as listed on the profile","unverified","none","https://rumavi.com/en/new-developments/thailand/cherng-talay/the-title-sierra"],["Ownership recorded on the profile: Foreign Freehold (condominium title under 49% quota) + ฿300K premium","unverified","none","https://rumavi.com/en/new-developments/thailand/cherng-talay/the-title-sierra"],["7 unit types are listed at The Title Sierra, ranging from 1 to 2 bedrooms, between 28 and 58 sqm. Listed prices run from THB 3,140,000 to THB 6,635,000.","unverified","none","https://rumavi.com/en/new-developments/thailand/cherng-talay/the-title-sierra"]],"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["not checked","date on record 2028-Q3 not re-checked on the review date",null],"co":null,"sq":{"handover":"portal","permit":"registry","price":"portal","developer":"registry"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","handover status not resolved"]},"src":["https://rumavi.com/en/new-developments/thailand/cherng-talay/the-title-sierra","https://eia.onep.go.th/services/web/open-api/eia-list"]}},"the-units-milano-abitarein":{"set":{"rvw":null}},"the-valeron-tower":{"set":{"rvw":null}},"the-valley-private-residences-marrakech":{"set":{"rvw":null}},"the-view-boa-vista-boavista2000":{"set":{"rvw":null}},"the-watercrest-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/ellington/the-watercrest"],["DLD project register: project 3444, status Active, completion date on the register 31 Mar 2028, 2.2% built at the DLD inspection of 24 Jul 2026, escrow account bank Commercial Bank Of Dubai(Psc), registered developer Ellington Properties Development L.L.C (DLD developer 1117) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/the-watercrest-by-ellington"]],"ev":{"permit":"Registered as DLD project 3444, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Commercial Bank Of Dubai(Psc) (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 24 Jul 2026: 2.2% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Ellington Properties Development L.L.C (DLD developer 1117)","handover_promised":"2028-Q1"},"pn":"DLD project registration 3444","rvw":null,"src":["https://ellingtonproperties.ae/en/property-for-sale/the-watercrest-mohammed-bin-rashid-city","https://www.propertyfinder.ae/en/new-projects/ellington/the-watercrest","https://dubairealestateiq.com/project/the-watercrest-by-ellington"]}},"the-well-coconut-grove":{"set":{"rvw":null}},"the-welnest-balaclava-valio-sur-mer":{"set":{"rvw":null}},"the-whitfield-toronto":{"set":{"rvw":null}},"the-windsor-23-ocean-parkway-aview":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","official register for New York not looked up on the review date","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2026-Q4 not re-checked on the review date",null],"co":null,"sq":{"permit":"press","price":"developer","developer":"press"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: official register for New York not looked up on the review date","handover status not resolved"]}}},"the-zero-nai-yang":{"set":{"rvw":null}},"ther-by-civis-paraguay":{"set":{"rvw":null}},"thompson-mexico-city-reforma-related":{"set":{"rvw":null}},"thompson-puerto-vallarta-residences-related":{"set":{"rvw":null}},"thomson-reserve-singapore":{"set":{"rvw":null}},"tierra-viva":{"set":{"rvw":null}},"tifawin-villas-swisspro360":{"set":{"rvw":null}},"tiger-downtown-ajman-orchid-towers-tiger-properties":{"set":{"rvw":null}},"tilal-binghatti":{"set":{"rvw":null}},"time-square-11":{"set":{"rvw":null}},"time-square-6":{"set":{"rvw":null}},"time-square-7":{"set":{"rvw":null}},"time-square-8-phnom-penh":{"set":{"rvw":null}},"timez-by-danube-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/danube-properties/timez"],["DLD project register: project 3559, status Active, completion date on the register 31 Jul 2028, 21.45% built at the DLD inspection of 9 Sep 2026, escrow account bank First Abu Dhabi Bank, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/timez-by-danube"]],"ev":{"permit":"Registered as DLD project 3559, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 9 Sep 2026: 21.45% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Danube Properties Development L.L.C (DLD developer 1009)","handover_promised":"2028-Q3"},"pn":"DLD project registration 3559","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/timez-by-danube"],"ho":["future","DLD register completion 31 Jul 2028; 21.45% built at the inspection of 9 Sep 2026","https://dubairealestateiq.com/project/timez-by-danube"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/timez-by-danube"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://danubeproperties.com/portfolio/timez/","https://gulfnews.com/gn-focus/danube-properties-unveils-convertible-1bhk-apartment-at-the-price-of-a-studio-1.500048160","https://meconstructionnews.com/62487/danube-properties-unveils-timez-in-dubai-silicon-oasis/amp","https://www.propertyfinder.ae/en/new-projects/danube-properties/timez","https://dubairealestateiq.com/project/timez-by-danube"],"st":"under construction"}},"tirana-boulevard-pajtoni-group":{"set":{"rvw":null}},"tm-tower-benidorm-tm":{"set":{"rvw":null}},"tomas-ribeiro-79-vanguard-properties":{"set":{"cl":[["Under construction (Nov 2025)","verified","independent","https://imobiliario.publico.pt/noticias/vanguard-properties-investe-35-milhoes-novo-projeto-reabilitacao-lisboa/"],["Completion end of 2026","unverified","none","https://imobiliario.publico.pt/noticias/vanguard-properties-investe-35-milhoes-novo-projeto-reabilitacao-lisboa/"],["Completion 2027 (portal)","contradicted","independent","https://construcaonova.pt/empreendimentos/tomas-ribeiro-79-apartamentos-de-luxo-em-lisboa/"],["21 apartments, T2 to T4, 110 to 302 m2","verified","independent","https://imobiliario.publico.pt/noticias/vanguard-properties-investe-35-milhoes-novo-projeto-reabilitacao-lisboa/"],["Investment EUR 35m (EUR 30m at launch)","verified","independent","https://imobiliario.publico.pt/noticias/vanguard-properties-investe-35-milhoes-novo-projeto-reabilitacao-lisboa/"],["Contractor DST, 18-month build","unverified","none","https://studio-jv.com/noticias/reportugal-destaca-lancamento-do-tomas-ribeiro-79-projeto-do-studio-jv-em-lisboa/"],["Lisbon municipal licensing case files exist for the site","verified","registry","https://flatin.pt/en/new-developments/developer/vanguard-properties/"],["Prices from EUR 1.65m","unverified","none","https://www.vangproperties.com/pt/lisboa-real-estate/tomas-ribeiro-79/"],["Neighbouring Rua Tomás Ribeiro 89 project being sold by Vanguard","verified","independent","https://jornaleconomico.sapo.pt/noticias/vanguard-properties-contrata-cbre-para-vender-tomas-ribeiro-a-mexto-property/"],["Developer has completed Castilho 203 and Infinity","unverified","none","https://www.vangproperties.com/pt/real-estate-portugal/"],["The developer page read on 13 Nov 2026 prints: \"Conclusão de obra | TBA\"","unverified","none","https://www.vangproperties.com/pt/lisboa-real-estate/tomas-ribeiro-79/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["changed","The developer page now prints the completion as \"TBA\"; the end-2026 date on record comes from press (2025).","https://www.vangproperties.com/pt/lisboa-real-estate/tomas-ribeiro-79/"],"co":null,"sq":{"handover":"developer","permit":"portal","price":"developer","developer":"developer"},"miss":null}}},"top-hill-residence-novigrad":{"set":{"rvw":null}},"torre-quo-brodyfriedman":{"set":{"rvw":null}},"tortuga-bay-phase-ii-schaible":{"set":{"rvw":null}},"toshi-france":{"set":{"rvw":null}},"tower-1888":{"set":{"rvw":null}},"townsquare-sliema-st-property-investments":{"set":{"rvw":null}},"treehouse-at-midtown-macpark":{"set":{"rvw":null}},"trellia-cove-at-mizuki-park":{"set":{"rvw":null}},"tridenta-towers-puerto-vallarta":{"set":{"rvw":null}},"trilogy-limassol-seafront":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Cyprus","https://kolaboro.com/registers/"],"ho":["none","No date in the project page text; the November 2026 date on record is from the developer projects list.","https://www.cybarco.com/project/trilogy-limassol-seafront/"],"co":null,"sq":{"handover":"developer","price":"developer","developer":"developer"},"miss":null}}},"trinity-gardens-the-ellinikon-little-athens":{"set":{"rvw":null}},"trivium-paraguay":{"set":{"rvw":null}},"tropical-beach-residences-punta-cana":{"set":{"rvw":null}},"trump-cliff-villas-aida":{"set":{"rvw":null}},"trump-golf-villas-aida":{"set":{"cl":[["Completion date published as \"December 2028\"","unverified","none","https://darglobal.co.uk/aida-trump-villas"],["Status shown as \"Under Development\"; the page says \"Construction is actively underway.\"","unverified","none","https://darglobal.co.uk/aida-trump-villas"],["Five-bedroom villas from 4,367 sq ft (the page also lists 405 sqm)","unverified","none","https://darglobal.co.uk/aida-trump-villas"],["No price and no permit number are printed on the developer page","unverified","none","https://darglobal.co.uk/aida-trump-villas"],["The developer page read on 13 Nov 2026 prints: \"Completion is scheduled for December 2028\"","unverified","none","https://darglobal.co.uk/aida-trump-villas"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Oman","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Completion is scheduled for December 2028\"","https://darglobal.co.uk/aida-trump-villas"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"trump-international-hotel-tower-dubai":{"set":{"rvw":null}},"trump-international-oman-aida":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Oman","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2028-Q4) was not re-checked.","https://darglobal.co.uk/press/Dar-Global-sets-a-new-benchmark-in-luxury-hospitality-with-the-launch-of-the-500ml-Trump-International-Oman-in-AIDA"],"co":null,"sq":{"handover":"portal","developer":"portal"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"trump-plaza-jeddah-dar-global":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Saudi Arabia","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (2030-Q4) was not re-checked.",null],"co":null,"sq":{"handover":"portal","permit":"portal","price":"portal","developer":"portal"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"trump-tower-jeddah":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["no public per-project search","see kolaboro.com/registers/ for Saudi Arabia","https://kolaboro.com/registers/"],"ho":["not checked","The developer page could not be read on 13 Nov 2026 (rendered by script, blocked or not found); the date on record (December 2029) was not re-checked.","https://darglobal.co.uk/trump-tower-jeddah"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":["primary source not readable (page rendered by script, blocked or not published)","handover status not resolved"]}}},"trump-tower-tbilisi":{"set":{"rvw":null}},"trump-villas-at-trump-international-golf-club-simaisma":{"set":{"rvw":null}},"tsano-french-riviera":{"set":{"rvw":null}},"tual-golyaka-dag-holding":{"set":{"rvw":null}},"tucidide14-unipol-investimenti-abitarein":{"set":{"rvw":null}},"tuscan-ridge-jamaica":{"set":{"rvw":null}},"tw-almazara-gardens-istan":{"set":{"cl":[["Developer is Taylor Wimpey de Espana S.A. Unipersonal (NIF A-07248206), part of Taylor Wimpey plc","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["Taylor Wimpey's Spanish business completed 494 homes in 2025","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["All instalments paid during construction are covered by a bank guarantee or insurance policy under the Building Regulations Law (LOE)","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["10-year structural defects insurance taken out on completion","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["Almazara Gardens is a EUR 21 million development in the Almazara Boutique Residences complex","verified","independent","https://www.iberian.property/news/residential/taylor-wimpey-invests-eur21m-in-its-residential-complex-in-malaga/"],["49 apartments in 3 blocks","unverified","none","https://taylorwimpeyspain.com/es/casa/almazara-gardens-apartamentos-istan-malaga/"],["Earlier phase Almazara Hills fully sold","verified","independent","https://www.iberian.property/news/residential/taylor-wimpey-invests-eur21m-in-its-residential-complex-in-malaga/"],["Delivery October 2027","unverified","none","https://taylorwimpeyspain.com/es/casa/almazara-gardens-apartamentos-istan-malaga/"],["Construction under way (progress video 09/2026)","unverified","none","https://taylorwimpeyspain.com/es/casa/almazara-gardens-apartamentos-istan-malaga/"],["Building licence granted","unverified","none","https://taylorwimpeyspain.com/es/casa/almazara-gardens-apartamentos-istan-malaga/"],["Prices from 555,000 EUR ex-VAT (launch press quoted from 460,000 EUR)","unverified","none","https://www.iberian.property/news/residential/taylor-wimpey-invests-eur21m-in-its-residential-complex-in-malaga/"],["72 homes sold across the complex, buyers from 25 countries","unverified","none","https://www.iberian.property/news/residential/taylor-wimpey-invests-eur21m-in-its-residential-complex-in-malaga/"],["The developer page read on 13 Nov 2026 prints: \"Entrega Prevista: Octubre 2027\"","unverified","none","https://taylorwimpeyspain.com/es/casa/almazara-gardens-apartamentos-istan-malaga/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Entrega Prevista: Octubre 2027\"","https://taylorwimpeyspain.com/es/casa/almazara-gardens-apartamentos-istan-malaga/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"developer"},"miss":null}}},"tw-fuente-lirios-benahavis":{"set":{"cl":[["Developer is Taylor Wimpey de Espana S.A. Unipersonal (NIF A-07248206), part of Taylor Wimpey plc","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["Taylor Wimpey's Spanish business completed 494 homes in 2025","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["All instalments paid during construction are covered by a bank guarantee or insurance policy under the Building Regulations Law (LOE)","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["10-year structural defects insurance taken out on completion","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["Project has a building licence (licencia de obras)","unverified","none","https://taylorwimpeyspain.com/es/casa/fuente-lirios-benahavis-marbella-malaga/"],["28 apartments in one building","verified","independent","https://brainsre.news/taylor-wimpey-11m-fuente-lirios-28-aptos-benahavis/"],["Delivery April 2027","verified","independent","https://brainsre.news/taylor-wimpey-11m-fuente-lirios-28-aptos-benahavis/"],["Construction of phase 1 to start May 2025; progress video dated 09/2026","unverified","none","https://taylorwimpeyspain.com/es/casa/fuente-lirios-benahavis-marbella-malaga/"],["Energy rating A","unverified","none","https://taylorwimpeyspain.com/wp-content/uploads/2025/04/Fuente-LIrios-Certificado-Energetico-min.pdf"],["Prices from 395,000 EUR ex-VAT (press at launch quoted 1-bed from 320,000 EUR + VAT)","unverified","none","https://brainsre.news/taylor-wimpey-11m-fuente-lirios-28-aptos-benahavis/"],["Freehold title available to foreign buyers","unverified","none","https://taylorwimpeyspain.com/es/casa/fuente-lirios-benahavis-marbella-malaga/"],["Investment of EUR 11 million","verified","independent","https://brainsre.news/taylor-wimpey-11m-fuente-lirios-28-aptos-benahavis/"],["The developer page read on 13 Nov 2026 prints: \"Entrega prevista en Abril 2027\"","unverified","none","https://taylorwimpeyspain.com/es/casa/fuente-lirios-benahavis-marbella-malaga/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Entrega prevista en Abril 2027\"","https://taylorwimpeyspain.com/es/casa/fuente-lirios-benahavis-marbella-malaga/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"developer"},"miss":null}}},"tw-grand-bay-manilva":{"set":{"cl":[["Developer is Taylor Wimpey de Espana S.A. Unipersonal (NIF A-07248206), part of Taylor Wimpey plc","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["Taylor Wimpey's Spanish business completed 494 homes in 2025","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["All instalments paid during construction are covered by a bank guarantee or insurance policy under the Building Regulations Law (LOE)","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["10-year structural defects insurance taken out on completion","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["153 homes in total, EUR 63 million investment","verified","independent","https://www.propertyinvestortoday.co.uk/breaking-news/2026/03/two-new-spanish-schemes-target-investors/"],["Developer bought two plots with 17,000 m2 buildable in Bahia de las Rocas for 153 homes","verified","independent","https://brainsre.news/taylor-wimpey-compra-2-solares-manilva-153-viviendas/"],["Phase 1 delivery November 2027","unverified","none","https://taylorwimpeyspain.com/es/casa/grand-bay-apartmentos-manilva-malaga/"],["Construction under way (time-lapse 10/2026)","unverified","none","https://taylorwimpeyspain.com/es/casa/grand-bay-apartmentos-manilva-malaga/"],["Building licence granted","unverified","none","https://taylorwimpeyspain.com/es/casa/grand-bay-apartmentos-manilva-malaga/"],["All homes energy rated A","unverified","none","https://www.propertyinvestortoday.co.uk/breaking-news/2026/03/two-new-spanish-schemes-target-investors/"],["Prices from 375,000 EUR ex-VAT","unverified","none","https://taylorwimpeyspain.com/es/casa/grand-bay-apartmentos-manilva-malaga/"],["Freehold title available to foreign buyers","unverified","none","https://taylorwimpeyspain.com/es/casa/grand-bay-apartmentos-manilva-malaga/"],["The developer page read on 13 Nov 2026 prints: \"Fecha de entrega prevista fase 1: Noviembre 2027\"","unverified","none","https://taylorwimpeyspain.com/es/casa/grand-bay-apartmentos-manilva-malaga/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Fecha de entrega prevista fase 1: Noviembre 2027\"","https://taylorwimpeyspain.com/es/casa/grand-bay-apartmentos-manilva-malaga/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"tw-solana-village-mijas":{"set":{"cl":[["Developer is Taylor Wimpey de Espana S.A. Unipersonal (NIF A-07248206), part of Taylor Wimpey plc","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["Taylor Wimpey's Spanish business completed 494 homes in 2025","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["All instalments paid during construction are covered by a bank guarantee or insurance policy under the Building Regulations Law (LOE)","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["10-year structural defects insurance taken out on completion","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["Phase 1 of 48 apartments, about EUR 16 million investment","verified","independent","https://brainsre.news/taylor-wimpey-invertira-24-millones-dos-nuevas-promociones-costa-del-sol/"],["Phase 1 delivered September 2024 and phase 2 May 2025 / May 2026","unverified","none","https://taylorwimpeyspain.com/es/casa/solana-village-la-cala-golf-resort-mijas-malaga/"],["195 apartments across two plots (105 and 90)","unverified","none","https://taylorwimpeyspain.com/es/casa/solana-village-la-cala-golf-resort-mijas-malaga/"],["Phase 3 delivery July 2026, October 2026 and September 2027","unverified","none","https://taylorwimpeyspain.com/es/casa/solana-village-la-cala-golf-resort-mijas-malaga/"],["Building licence granted","unverified","none","https://taylorwimpeyspain.com/es/casa/solana-village-la-cala-golf-resort-mijas-malaga/"],["Prices from 400,000 EUR ex-VAT","unverified","none","https://taylorwimpeyspain.com/es/casa/solana-village-la-cala-golf-resort-mijas-malaga/"],["Suitable for investors seeking holiday-rental income (no figure given)","unverified","none","https://taylorwimpeyspain.com/es/casa/solana-village-la-cala-golf-resort-mijas-malaga/"],["The developer page read on 13 Nov 2026 prints: \"Entrega prevista: Fase 1: Septiembre 2024 - Vendido. Fase 2: Mayo 2025 (Edificios 1 y 2) Mayo 2026 (Edificios 13 y 14) - Vendido. En venta ahora Fase 3: Julio 2026 (17 y 18), Octubre 2026 (Edificio 15 y 16) y Septiembre 2027 (Edificios 11 y 12)\"","unverified","none","https://taylorwimpeyspain.com/es/casa/solana-village-la-cala-golf-resort-mijas-malaga/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["phased","Phased delivery: the developer page still lists the September 2024, May 2025, May 2026, July 2026 and October 2026 phase dates; the last phase is dated September 2027. The page does not say whether the 2026 phases were handed over.","https://taylorwimpeyspain.com/es/casa/solana-village-la-cala-golf-resort-mijas-malaga/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"tw-valley-views-mijas":{"set":{"cl":[["Developer is Taylor Wimpey de Espana S.A. Unipersonal (NIF A-07248206), part of Taylor Wimpey plc","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["Taylor Wimpey's Spanish business completed 494 homes in 2025","verified","independent","https://www.investegate.co.uk/announcement/rns/taylor-wimpey--tw./taylor-wimpey-plc-full-year-results/9459165"],["All instalments paid during construction are covered by a bank guarantee or insurance policy under the Building Regulations Law (LOE)","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["10-year structural defects insurance taken out on completion","unverified","none","https://taylorwimpeyspain.com/buyers-guide/"],["Valley Views has 54 apartments","contradicted","independent","https://brainsre.news/taylor-wimpey-16-millones-viviendas-mijas-malaga/"],["Phase 1 delivery March 2027","verified","independent","https://brainsre.news/taylor-wimpey-16-millones-viviendas-mijas-malaga/"],["Phase 2 delivery October 2027","unverified","none","https://taylorwimpeyspain.com/es/casa/valley-views-mijas-malaga/"],["Construction under way (progress video 09/2026)","unverified","none","https://taylorwimpeyspain.com/es/casa/valley-views-mijas-malaga/"],["Building licence granted","unverified","none","https://taylorwimpeyspain.com/es/casa/valley-views-mijas-malaga/"],["Prices from 383,000 EUR ex-VAT (phase 1 launched from 339,000 EUR + VAT per press)","unverified","none","https://brainsre.news/taylor-wimpey-16-millones-viviendas-mijas-malaga/"],["Energy rating A for all homes","verified","independent","https://brainsre.news/taylor-wimpey-16-millones-viviendas-mijas-malaga/"],["Investment of more than EUR 16 million","verified","independent","https://brainsre.news/taylor-wimpey-16-millones-viviendas-mijas-malaga/"],["The developer page read on 13 Nov 2026 prints: \"Entrega prevista : Fase 1: Marzo 2027 Fase 2: Octubre 2027\"","unverified","none","https://taylorwimpeyspain.com/es/casa/valley-views-mijas-malaga/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Spain","https://kolaboro.com/registers/"],"ho":["future","developer page: \"Entrega prevista : Fase 1: Marzo 2027 Fase 2: Octubre 2027\"","https://taylorwimpeyspain.com/es/casa/valley-views-mijas-malaga/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"developer"},"miss":null}}},"twin-resort-radhime-regina-construction":{"set":{"rvw":null}},"twin-tower-sofia-glavbolgarstroy-smart-consultants":{"set":{"rvw":null}},"two-senopati-asiana-group":{"set":{"rvw":null}},"two-sudirman-private-residences-central-sudirman-development":{"set":{"rvw":null}},"uc88-wyndham-garden-bkk1-chhun-sambath":{"set":{"rvw":null}},"udaondo-buenos-aires-landmark-developments":{"set":{"rvw":null}},"ulu-villas-lamai":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"press"},"miss":null}}},"uluwatu-art-villas-art-villas-bali":{"set":{"rvw":null}},"umah-ubud-balitecture":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q2) comes from the sources listed on the page.","https://www.balitecture.com/development/umah-ubud/2-bedroom-b/"],"co":null,"sq":{"handover":"press","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"unika-costa-del-sol":{"set":{"rvw":null}},"unsere-flora-berlin":{"set":{"rvw":null}},"uptown-30-madeira":{"set":{"rvw":null}},"uptown-muscat-wujha":{"set":{"rvw":null}},"urbn-x-tower-ux":{"set":{"rvw":null}},"utopia-damac-hills":{"set":{"rvw":null}},"uus-kindrali-black-house-sammu-10-seebi-24a-kindrali-houses":{"set":{"rvw":null}},"v-a-broadbeach-victoria-albert":{"set":{"rvw":null}},"valencia-damac-lagoons-district":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q3, 2029\"","unverified","none","https://www.damacproperties.com/en/communities/damac-lagoons/projects/damac-lagoons-district-valencia/"],["Apartments in the DAMAC Lagoons District; the page lists 1-bedroom units","unverified","none","https://www.damacproperties.com/en/communities/damac-lagoons/projects/damac-lagoons-district-valencia/"],["DLD project register: project 3226, status Active, completion date on the register 28 Feb 2028, 5.21% built at the DLD inspection of 20 May 2026, escrow account bank First Abu Dhabi Bank, registered developer Island Oasis Properties (DLD developer 921) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-lagoons-valencia"],["The developer page read on 13 Nov 2026 prints: \"Project Handover Q3, 2029\"","unverified","none","https://www.damacproperties.com/en/communities/damac-lagoons/projects/damac-lagoons-district-valencia/"]],"ev":{"permit":"Registered as DLD project 3226, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank First Abu Dhabi Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 20 May 2026: 5.21% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Island Oasis Properties (DLD developer 921)","handover_promised":"2029-Q3","unit_types":["1-bedroom apartment"]},"pn":"DLD project registration 3226","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/damac-lagoons-valencia"],"ho":["future","DLD register completion 28 Feb 2028; 5.21% built at the inspection of 20 May 2026; developer page: \"Project Handover Q3, 2029\"","https://dubairealestateiq.com/project/damac-lagoons-valencia"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/damac-lagoons-valencia"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://www.damacproperties.com/en/communities/damac-lagoons/projects/damac-lagoons-district-valencia/","https://dubairealestateiq.com/project/damac-lagoons-valencia"],"st":"under construction"}},"valles-haus":{"set":{"rvw":null}},"valmer-french-riviera":{"set":{"rvw":null}},"valora-estate-namibia":{"set":{"rvw":null}},"vanderbilt-residences-condado-paulson":{"set":{"rvw":null}},"variation-france":{"set":{"rvw":null}},"varino-09-dubai-madeira-varino":{"set":{"cl":[["Scheme of 9 buildings and about 400 apartments, EUR 300m","verified","independent","https://www.dnoticias.pt/2022/7/7/318882-varino-investe-300-milhoes-de-euros-no-dubai-madeira/"],["Full completion 2028","unverified","none","https://www.nit.pt/fora-de-casa/na-cidade/o-empreendimento-de-luxo-com-400-apartamentos-que-esta-a-nascer-na-madeira"],["Varino 05 completed end 2023","verified","independent","https://www.nit.pt/fora-de-casa/na-cidade/o-empreendimento-de-luxo-com-400-apartamentos-que-esta-a-nascer-na-madeira"],["Varino 07 completion Q4 2024 / 2025","contradicted","none","https://www.imovirtual.com/pt/empreendimento/varino-7-dubai-madeira-ID1iB4Z"],["Varino 09 has 104 apartments in two blocks","verified","independent","https://www.nit.pt/fora-de-casa/na-cidade/o-empreendimento-de-luxo-com-400-apartamentos-que-esta-a-nascer-na-madeira"],["Prices from EUR 360,000 for a 91 m2 T1","verified","independent","https://www.nit.pt/fora-de-casa/na-cidade/o-empreendimento-de-luxo-com-400-apartamentos-que-esta-a-nascer-na-madeira"],["Largest private investment in Madeira","unverified","none","https://www.varino.pt/en/dubai-madeira"],["Building licence issued by Camara Municipal do Funchal","unverified","none","https://www.varino.pt/en/dubai-madeira"],["Deposit protection","unverified","none","https://www.varino.pt/en/dubai-madeira"],["The developer page read on 13 Nov 2026 prints: \"EXPECTED CONCLUSION 2029 | 2030\"","unverified","none","https://www.varino.pt/en/dubai-madeira"]],"fx":{"developer_founded":2016.0,"developer_hq":"Funchal, Madeira, Portugal","developer_company":"Varino (owned by AFA and Socicorreia groups); portal advertiser Terrace Benefit, Lda (Porto)","developer_projects_delivered":2.0,"handover_promised":"2029 | 2030","original_handover":"2028","unit_types":["T1","T2","T3"],"size_min_m2":91.0,"size_max_m2":317.0,"price_min":360000.0,"price_max":1715000.0,"currency":"EUR","foreign_ownership":"Freehold","permit_authority":"Camara Municipal do Funchal"},"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["changed","The developer page now prints the expected conclusion as 2029 to 2030; the 2028 on record came from press. Record updated to the developer wording.","https://www.varino.pt/en/dubai-madeira"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"press","developer":"developer"},"miss":null}}},"vasana-kedungu":{"set":{"rvw":null}},"vauxhall-dstrct":{"set":{"rvw":null}},"vaya-vaya-la-cruz-de-huanacaxtle":{"set":{"rvw":null}},"vega-condominium":{"set":{"rvw":null}},"vel-a-residences-puerto-vallarta":{"set":{"rvw":null}},"vela-viento-dubai":{"set":{"cl":[["Sold as under construction (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/omniyat/vela-viento"],["DLD project register: project 2885, status Active, completion date on the register 13 May 2027, 21.81% built at the DLD inspection of 18 May 2026, escrow account bank Commercial Bank Of Dubai(Psc), registered developer Royal Creek Real Estate Development Llc (DLD developer 1599) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/vela-viento-by-omniyat"]],"ev":{"permit":"Registered as DLD project 2885, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Commercial Bank Of Dubai(Psc) (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 18 May 2026: 21.81% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Royal Creek Real Estate Development Llc (DLD developer 1599)","handover_promised":"2027-Q2"},"pn":"DLD project registration 2885","rvw":null,"src":["https://omniyat.com/residential/vela-viento-dorchester-collection-dubai","https://www.propertyfinder.ae/en/new-projects/omniyat/vela-viento","https://dubairealestateiq.com/project/vela-viento-by-omniyat"]}},"venezia-negombo":{"set":{"rvw":null}},"venire-villamorra":{"set":{"rvw":null}},"veranova-park-arquitectura-y-concreto":{"set":{"rvw":null}},"verdant-residence-maenam-verdant-developments":{"set":{"rvw":null}},"vero-versa-residences-adriatic-marinas":{"set":{"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Montenegro","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2028-Q4) comes from the sources listed on the page.","https://www.portomontenegro.com/real-estate/vero-versa"],"co":null,"sq":{"handover":"portal","permit":"developer","price":"press","developer":"portal"},"miss":null},"url":"https://www.portomontenegro.com/real-estate/vero-versa"}},"vervana-playa-venao-frapan":{"set":{"rvw":null}},"vesa-little-mountain-phase-1-vancouver":{"set":{"rvw":null}},"via-doro-mazaya-real-estate":{"set":{"rvw":null}},"vibe-town-karon":{"set":{"rvw":null}},"viceroy-residences-austin-pearlstone":{"set":{"rvw":null}},"viceroy-residences-playa-del-carmen-related-simca":{"set":{"rvw":null}},"vientiane-life-center-laos":{"set":{"rvw":null}},"viewz-2-by-danube-jlt":{"set":{"cl":[["Registered with DLD as project 2560","verified","registry","https://www.cevitas.ae/en/projects/viewz-2-by-danube"],["Escrow account at First Abu Dhabi Bank","verified","registry","https://www.homesearch.ae/for-sale/off-plan/danube/viewz-2-by-danube-2560"],["Handover June 2026 (developer)","contradicted","registry","https://dxbpropy.ai/offplan/viewz-2-by-danube-jumeirah-lake-towers-b3799"],["Construction progress 65% (Oct 2026)","verified","registry","https://dubaihandover.com/projects/2560-viewz-2-by-danube"],["Developer internal progress 57% overall (30 Sep 2026)","contradicted","registry","https://danubeproperties.com/construction/viewz/"],["564 apartments","verified","registry","https://realestateclubdubai.com/handover-tracker/viewz-2-by-danube"],["Registered project value AED 262.5M","verified","registry","https://realestateclubdubai.com/handover-tracker/viewz-2-by-danube"],["Construction started Jul 2023","verified","registry","https://www.cevitas.ae/en/projects/viewz-2-by-danube"],["Starting price AED 950,000","unverified","none","https://dxbpropy.ai/offplan/viewz-2-by-danube-jumeirah-lake-towers-b3799"],["Danube delivers every project as promised (GN Focus, Jul 2026)","contradicted","registry","https://famproperties.com/completion-date/viewz-2-by-danube"],["Danube has delivered multiple completed projects (Pearlz and 12 others)","verified","independent","https://www.khaleejtimes.com/uae/dubai-danube-properties-hands-over-project-ahead-of-schedule"],["Freehold title in JLT","unverified","none","https://realestateclubdubai.com/handover-tracker/viewz-2-by-danube"],["DLD project register: project 2560, status Active, completion date on the register 30 Jun 2026, 50.02% built at the DLD inspection of 21 Jul 2026, escrow account bank First Abu Dhabi Bank, registered developer Danube Properties Development L.L.C (DLD developer 1009) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/viewz-2-by-danube"]],"rvw":null,"src":["https://danubeproperties.com/construction/viewz/","https://developersnewsmagazine.com/magazine/05-august-2026.pdf","https://dubaihandover.com/projects/2560-viewz-2-by-danube","https://dxbpropy.ai/offplan/viewz-2-by-danube-jumeirah-lake-towers-b3799","https://famproperties.com/completion-date/viewz-2-by-danube","https://gulfnews.com/gn-focus/company-news/danube-properties-to-deliver-11-dubai-projects-in-12-months-marking-major-milestone-1.500625819","https://mulki.ae/off-plan/jumeirah-lakes-towers/viewz-2-by-danube/photos","https://realestateclubdubai.com/handover-tracker/viewz-2-by-danube","https://www.cevitas.ae/en/projects/viewz-2-by-danube","https://www.homesearch.ae/for-sale/off-plan/danube/viewz-2-by-danube-2560","https://www.khaleejtimes.com/uae/dubai-danube-properties-hands-over-project-ahead-of-schedule","https://dubairealestateiq.com/project/viewz-2-by-danube"]}},"vila-gra-a-lisbon":{"set":{"rvw":null}},"vilamoura-terracota":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027-Q2) comes from the sources listed on the page.","https://www.vilamouraworld.com/real-estate/terracota/"],"co":null,"sq":{"handover":"portal","permit":"developer","price":"press","developer":"press"},"miss":null}}},"vilamoura-the-uncommon":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.vilamouraworld.com/real-estate/the-uncommon/"],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"press"},"miss":null}}},"villa-arteo":{"set":{"rvw":null}},"villa-botanica-nice-sully-immobilier":{"set":{"rvw":null}},"villa-magna-eco-resort-algarve":{"set":{"rvw":null}},"villa-miami":{"set":{"rvw":null}},"villa-peninsula-marrakech":{"set":{"rvw":null}},"villa-tambra-residence-cape-verde":{"set":{"rvw":null}},"villa-v-bali-fifth-avenue-royal-bali-group":{"set":{"rvw":null}},"villas-dunes-estate-costa-navarino":{"set":{"rvw":null}},"villas-mbuva-mozambique":{"set":{"rvw":null}},"vimae-palm-view-kuta-lombok":{"set":{"rvw":null}},"vincitore-aqua-flora":{"set":{"cl":[["Trakheesi permit 0013517309","unverified","none","https://a1properties.ae/project-details/vincitore-aqua-flora-dubai-science-park"],["Registered with DLD as project 3154","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/vincitore-aqua-flora"],["Escrow account at Mashreq Bank","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/vincitore-aqua-flora"],["Completion Q3 2027 (developer payment plan, 2024)","contradicted","registry","https://continentalclub.ae/project/aqua-flora-dubai-science-park/"],["Handover Q2 2028 (agency)","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/vincitore-aqua-flora"],["Construction under way","verified","registry","https://mulki.ae/off-plan/dubai-science-park/vincitore-aqua-flora"],["Construction pace consistent with the registered date","contradicted","registry","https://mulki.ae/off-plan/dubai-science-park/vincitore-aqua-flora"],["8% guaranteed rental return for 3 years","unverified","none","https://investindxb.com/wp-content/uploads/2024/05/VINCITORE-AQUA-FLORA-PAYMENT-PLAN-investindxb.pdf"],["Starting price AED 760,000","unverified","none","https://www.cevitas.ae/en/projects/vincitore-aqua-flora"],["546 units","verified","registry","https://www.mitchellscommercialrealty.com/off-plan/vincitore-aqua-flora"],["Developer has delivered projects in Dubai (3 finished)","verified","registry","https://dubairealestateiq.com/developer/vincitore"],["Developer delivers on schedule","contradicted","registry","https://uaepropertychecker.com/projects/vincitore-volare"],["Freehold title","unverified","none","https://imatch.ae/projects/10372"],["DLD project register: project 3154, status Active, completion date on the register 30 Jun 2028, 1.28% built at the DLD inspection of 30 Mar 2026, escrow account bank Mashreq Bank Psc, registered developer Vincitore Luxury Real Estate Development L.L.C (DLD developer 1949) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/vincitore-aqua-flora"]],"rvw":null,"src":["https://a1properties.ae/project-details/vincitore-aqua-flora-dubai-science-park","https://continentalclub.ae/project/aqua-flora-dubai-science-park/","https://dubairealestateiq.com/developer/vincitore","https://dxbpropy.ai/developer-rankings/vincitore","https://imatch.ae/projects/10372","https://investindxb.com/wp-content/uploads/2024/05/VINCITORE-AQUA-FLORA-PAYMENT-PLAN-investindxb.pdf","https://mulki.ae/off-plan/dubai-science-park/vincitore-aqua-flora","https://uaepropertychecker.com/projects/vincitore-volare","https://vincitoreaquaflora.com/","https://www.cevitas.ae/en/projects/vincitore-aqua-flora","https://www.goldpillars.ae/project/vincitore-aqua-flora","https://www.goldpillars.ae/project/vincitore-aqua-flora-floor-plan-brochure-download","https://www.lankea.com/en/projects/vincitore-aqua-flora","https://www.mitchellscommercialrealty.com/off-plan/vincitore-aqua-flora","https://dubairealestateiq.com/project/vincitore-aqua-flora"],"st":"under construction"}},"vinhomes-global-gate":{"set":{"rvw":null}},"vinhomes-green-paradise":{"set":{"rvw":null}},"violet-4-damac-hills-2":{"set":{"cl":[["\"Project Handover\" printed on the page: \"Q3, 2027\"","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/violet-4/"],["4-bedroom townhouses in DAMAC Hills 2; the community amenities on the page include a wave pool","unverified","none","https://www.damacproperties.com/en/communities/damac-hills-2/projects/violet-4/"],["DLD project register: project 3288, status Active, completion date on the register 30 Aug 2027, 14.17% built at the DLD inspection of 13 May 2026, escrow account bank Dubai Islamic Bank, registered developer Front Line Investment Management L.L.C (DLD developer 1021) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/damac-hills-2-violet-4"]],"ev":{"permit":"Registered as DLD project 3288, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Dubai Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 13 May 2026: 14.17% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Front Line Investment Management L.L.C (DLD developer 1021)","handover_promised":"2027-Q3","unit_types":["4-bedroom townhouse"]},"pn":"DLD project registration 3288","rvw":null,"src":["https://www.damacproperties.com/en/communities/damac-hills-2/projects/violet-4/","https://dubairealestateiq.com/project/damac-hills-2-violet-4"]}},"vip-space-odyssey-rawai":{"set":{"rvw":null}},"vip-tropika-bangtao-vip-property-development":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256904-44, approval ทส 1009.5/21178)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2028; developer page read on 13 Nov 2026: \"ach Nearby Lifestyle Areas Boat Avenue, Porto de Phuket, Beach Clubs, Restaurants & Cafés Completion Year Expected 2028* Location Advantage Prime Bang Tao Loca\"","https://www.vipthailand.com/projects/vip-tropika/"],"co":null,"sq":{"handover":"press","permit":"registry","developer":"registry"},"miss":null}}},"viridia-west-cayman-islands":{"set":{"rvw":null}},"vision-iconic-mercedes-benz-places-binghatti-city":{"set":{"cl":[["The page describes Vision Iconic as the largest tower at Mercedes-Benz Places | Binghatti City in Meydan","unverified","none","https://www.binghatti.com/en/projects/vision-iconic"],["1,426 residences and 27 retail shops; ground floor, mezzanine, 5 podium levels, 67 residential floors, 4 mechanical floors and a roof","unverified","none","https://www.binghatti.com/en/projects/vision-iconic"],["1 to 5-bedroom residences","unverified","none","https://www.binghatti.com/en/projects/vision-iconic"],["No completion date is printed on the page","unverified","none","https://www.binghatti.com/en/projects/vision-iconic"],["DLD project register: project 2545, status Active, completion date on the register 31 Dec 2026, 65.25% built at the DLD inspection of 28 Apr 2026, escrow account bank Sharjah Islamic Bank, registered developer Binghatti Developers Fze (DLD developer 1051) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/mercedes-benz-places-binghatti"]],"ev":{"permit":"Registered as DLD project 2545, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Sharjah Islamic Bank (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 28 Apr 2026: 65.25% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Binghatti Developers Fze (DLD developer 1051)","handover_promised":"2026-Q4","unit_types":["1-bedroom apartment","2-bedroom apartment","3-bedroom apartment","4-bedroom apartment","5-bedroom apartment"]},"pn":"DLD project registration 2545","rvw":null,"src":["https://www.binghatti.com/en/projects/vision-iconic","https://dubairealestateiq.com/project/mercedes-benz-places-binghatti"]}},"visionnaire-residences-tower-limassol":{"set":{"rvw":null}},"vista-balito-mogan-grupo-meridional":{"set":{"rvw":null}},"vista-ponta-negra-mirantes":{"set":{"rvw":null}},"vistal-by-victoria-swarovski-leo-developments":{"set":{"rvw":null}},"vistara-residences-imagine-developments":{"set":{"rvw":null}},"vitrin-antalya-antalya":{"set":{"rvw":null}},"viva-calodyne-realist-development":{"set":{"rvw":null}},"viva-mare-french-riviera":{"set":{"rvw":null}},"viwwo-business-life-tower-paraguay":{"set":{"rvw":null}},"vizazi-zanzibar":{"set":{"rvw":null}},"vlora-marina-balfin":{"set":{"rvw":null}},"vodopad":{"set":{"rvw":null}},"volta-skai-tallinn":{"set":{"rvw":null}},"vr-krtsanisi-resort-residence-vr-holding":{"set":{"rvw":null}},"w-residences-manchester-st-michaels-relentless-salboy":{"set":{"rvw":null}},"w16-by-olson-kundig":{"set":{"rvw":null}},"waldorf-astoria-residences-miami-pmg":{"set":{"cl":[["Florida DBPR Division of Condominiums developer summary lists approved project PR77094 \"300 BISCAYNE RESIDENCES, A CONDO\", developer entity PMG DOWNTOWN DEVELOPERS, LP","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Condominium filed with Florida DBPR (PR77094, PMG Downtown Developers, LP)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["PMG affiliates filed earlier Miami condos (Echo Brickell, Muse, Echo Aventura)","verified","registry","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],["Phased vertical building permit approved Jan 2024, value USD 426M","verified","independent","https://floridayimby.com/2024/01/miamis-building-department-issues-phased-vertical-permit-for-100-story-supertall-waldorf-astoria-hotel-residences.html"],["Concrete through 60 of 100 floors (Feb 2026)","verified","independent","https://floridayimby.com/?p=38304"],["360 residences (fact sheet)","contradicted","independent","https://floridayimby.com/?p=38304"],["Completion 2027 (Wikipedia infobox, PMG portfolio)","contradicted","independent","https://floridayimby.com/?p=38304"],["Delivery 2028","unverified","none","https://floridayimby.com/?p=38304"],["Buyer deposits up to 10% held in escrow (statutory)","unverified","none","https://m.flsenate.gov/Statutes/718.202"],["Average buyer deposit about 40%","unverified","none","https://joshsteinrealtor.com/new-construction/waldorf-astoria-miami/"],["Hilton manages; brand licence can be terminated","unverified","none","https://static.millionluxury.com/spinfile/Spin/Data/Estate/File/Waldorf Astoria Residences Miami - Fact Sheet EN.pdf"],["Units listed from USD 3.39M","unverified","none","https://joshsteinrealtor.com/new-construction/waldorf-astoria-miami/"]],"rvw":{"d":"2026-11-13","ok":false,"pr":"registry","reg":["found","Florida DBPR condominium filings (developer summary)","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"ho":["not checked","date on record 2028 not re-checked on the review date",null],"co":["found","developer entity named in the DBPR filing","https://www2.myfloridalicense.com/sto/file_download/extracts/developersummary.csv"],"sq":{"handover":"press","permit":"registry","price":"portal","developer":"registry"},"miss":["handover status not resolved"]},"rw":{"register":"Florida DBPR condominium filings","item":"condominium developer filing","status":"listed as approved project","detail":"PR77094","code":"PR77094","checked":"2026-11-13"}}},"waldorf-astoria-residences-tokyo-nihonbashi":{"set":{"rvw":null}},"wandsworth-mills-st-george":{"set":{"rvw":null}},"waterstone-st-leonards-sekisui-house":{"set":{"rvw":{"d":"2026-11-13","ok":false,"pr":null,"reg":["not checked","official register for Sydney not looked up on the review date","https://kolaboro.com/registers/"],"ho":["not checked","date on record 2027-Q4 not re-checked on the review date",null],"co":null,"sq":{"handover":"developer","developer":"developer"},"miss":["primary source not readable on the review date (page rendered by script, blocked or a listing)","official register not looked up: official register for Sydney not looked up on the review date","handover status not resolved"]}}},"wave-horizon-porto-de-galinhas":{"set":{"rvw":null}},"wave-house-san-blas-lora-loca":{"set":{"rvw":null}},"waves-santa-eulalia-ncalma-homes":{"set":{"rvw":null}},"wellness-longevity-tower-costa-del-este":{"set":{"rvw":null}},"wen-living-san-jos-del-cabo-los-cabos":{"set":{"rvw":null}},"west-gate-st-johns-waterside-renaker":{"set":{"rvw":null}},"west-side-punta-cana":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Dominican Republic","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","price":"press","developer":"developer"},"miss":null}}},"west-village-karrinyup":{"set":{"rvw":null}},"westin-residences-penang-macrovest":{"set":{"rvw":null}},"westminster-tower-london-square":{"set":{"rvw":null}},"wickside-london":{"set":{"rvw":null}},"widen-by-sansiri-sathorn":{"set":{"cl":[["Developer construction-progress page (photos taken November 2026): overall progress 26%, expected completion February 2028; it states the EIA has been approved and a construction permit issued","verified","developer","https://www.sansiri.com/projectprogress/en/652"],["EIA approved","verified","registry","https://eia.onep.go.th/eia/detail?id=14204"],["Project company Siri TK Seven Co., Ltd. registered and active","verified","registry","https://eia.onep.go.th/eia/owner-detail?owner_id=10556"],["Construction permit issued and construction under way","contradicted","registry","https://eia.onep.go.th/eia/detail?id=14204"],["Expected completion February 2028","unverified","none","https://www.sansiri.com/projectprogress/en/"],["215 units in a 34-storey tower","verified","independent","https://homeday.co.th/articles/news/sansiri-20250818"],["Joint venture with Tokyu Development (Thailand)","verified","independent","https://en.moneyandbanking.co.th/2025/198411/"],["Prices from THB 8.59M (promotion; launch price THB 8.9M)","unverified","none","https://www.sansiri.com/condominium/widen-by-sansiri/th/"],["Earlier Sansiri joint-venture condos completed and registered","verified","registry","https://eia.onep.go.th/services/web/open-api/eia-list"],["Foreign quota units available","unverified","none","https://www.fazwaz.com/property-sales/3-bedroom-condo-for-sale-at-widen-by-sansiri-in-thung-mahamek-bangkok-u6151702"],["Deposits protected by escrow","unverified","none","https://www.sansiri.com/condominium/widen-by-sansiri/th/"]],"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256709-48, approval กท 1104/794)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2028-Q1; checked against: Developer construction-progress page (photos taken November 2026): overall progress 26%, expected completion February 2028; it states the EIA has been approved and a construction permit issued","https://www.sansiri.com/projectprogress/en/652"],"co":null,"sq":{"handover":"registry","permit":"registry","price":"developer","developer":"registry"},"miss":null},"src":["https://eia.onep.go.th/eia/detail?id=14204","https://eia.onep.go.th/eia/owner-detail?owner_id=10556","https://eia.onep.go.th/services/web/open-api/eia-list","https://en.moneyandbanking.co.th/2025/198411/","https://homeday.co.th/articles/news/sansiri-20250818","https://tanacityhome.tooktee.com/en/project/15399/?l=en","https://www.fazwaz.com/property-sales/3-bedroom-condo-for-sale-at-widen-by-sansiri-in-thung-mahamek-bangkok-u6151702","https://www.richmonts.com/our-properties/thailand/new-developments/widen-by-sansiri","https://www.sansiri.com/condominium/widen-by-sansiri/th/","https://www.sansiri.com/projectprogress/en/","https://www.thaipr.net/estate/3646317","https://www.sansiri.com/projectprogress/en/652"],"url":"https://www.sansiri.com/projectprogress/en/652"}},"windmill-bay-algarve-residence-algarve":{"set":{"rvw":null}},"windsor-house-ellington-dubai-south":{"set":{"cl":[["Registered on the DLD project register as project no. 4035 on 16 Dec 2025","verified","registry","https://dubairealestateiq.com/project/windsor-house"],["Escrow account held at Sharjah Islamic Bank","verified","registry","https://dubairealestateiq.com/project/windsor-house"],["Construction stage: 3.08% built at DLD inspection on 17 Jun 2026","verified","registry","https://dubairealestateiq.com/project/windsor-house"],["Developer entity Ellington Sb Development L.L.C registered with DLD (developer no. 2420)","verified","registry","https://dubairealestateiq.com/project/windsor-house"],["Project has 424 units on the register","verified","registry","https://dubairealestateiq.com/project/windsor-house"],["Developer group track record on DLD: 21 finished projects (54 total, 33 active)","verified","registry","https://dubairealestateiq.com/developer/ellington"],["Completion July 2029","verified","registry","https://dubairealestateiq.com/project/windsor-house"],["Launch price from AED 1.2M","unverified","none","https://www.propertyfinder.ae/en/new-projects/ellington/windsor-house"],["Sales started 1 Dec 2025","verified","registry","https://dubairealestateiq.com/project/windsor-house"],["Freehold ownership","unverified","none","https://www.propertyfinder.ae/en/new-projects/ellington/windsor-house"],["DLD project register: project 4035, status Active, completion date on the register 31 Jul 2029, 3.08% built at the DLD inspection of 17 Jun 2026, escrow account bank Sharjah Islamic Bank, registered developer Ellington Sb Development L.L.C (DLD developer 2420) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/windsor-house"]],"du":null,"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/windsor-house"],"ho":["future","DLD register completion 31 Jul 2029; 3.08% built at the inspection of 17 Jun 2026","https://dubairealestateiq.com/project/windsor-house"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/windsor-house"],"sq":{"handover":"registry","permit":"registry","price":"portal","developer":"registry"},"miss":null},"st":"under construction","url":"https://ellingtonproperties.ae/en/property-for-sale/windsor-house-dubai-south"}},"wing-samui-condo-phase-2":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256508-93, approval ทส 1009.5/1807)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["none","The developer page read on 13 Nov 2026 prints no date; the date on record (2027) comes from the sources listed on the page.","https://wingsamuicondo.com/"],"co":null,"sq":{"permit":"registry","developer":"registry"},"miss":null}}},"woma-wynwood":{"set":{"rvw":null}},"woodeum-paris-rive-gauche":{"set":{"rvw":null}},"wyndham-residences-al-marjan":{"set":{"cl":[["Project approved for off-plan sale","contradicted","registry","https://mun.rak.ae/wp-content/uploads/updated-Announcement-w.pdf"],["Project appears on RAK RERA off-plan project list","contradicted","registry","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list"],["Escrow account in place","unverified","none","https://www.propertyae.ae/projects/wyndham-residences-al-marjan-island/"],["Delivery December 2028 (Property Finder) vs Q1 2029 (developer)","contradicted","none","https://divineone.ae/our-projects/wyndham-residences/"],["Construction started 4 Mar 2026","unverified","none","https://www.propertyfinder.ae/en/new-projects/divine-one-group/wyndham-residences"],["163 units (136 studios, 27 1BR)","unverified","none","https://www.propertyae.ae/projects/wyndham-residences-al-marjan-island/"],["No confirmed unit count or floor plans at EOI stage","unverified","none","https://www.lucretia-international.com/en/projects/obg-wyndham-residences-al-marjan-island"],["Wyndham brand used under licence","unverified","none","https://www.propertyae.ae/projects/wyndham-residences-al-marjan-island/"],["Developer has 20+ years of delivery experience","unverified","none","https://divineone.ae/"],["Studios from AED 1,165,000","unverified","none","https://www.rakcapitals.ae/projects/wyndham-residences-al-marjan-island"],["Listed on the RAK RERA \"List and Status of Projects\" 2026 as \"Divine Island (old name is Wyndham Residences)\", status \"In progress\" (Ras Al Khaimah Municipality PDF, read 13 Nov 2026)","verified","registry","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]],"rvw":null,"src":["https://divineone.ae/","https://divineone.ae/our-projects/wyndham-residences/","https://mun.rak.ae/wp-content/uploads/updated-Announcement-w.pdf","https://sanad.mun.rak.ae/docs/en/rera-updated-developers-list","https://www.lucretia-international.com/en/projects/obg-wyndham-residences-al-marjan-island","https://www.prop971.com/project/PRJ-DIV-XAC5Z","https://www.propertyae.ae/projects/wyndham-residences-al-marjan-island/","https://www.propertyfinder.ae/en/new-projects/divine-one-group/wyndham-residences","https://www.rakcapitals.ae/projects/wyndham-residences-al-marjan-island","https://mun.rak.ae/wp-content/uploads/%D9%82%D8%A7%D8%A6%D9%85%D8%A9-%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D9%84%D8%B3%D9%86%D8%A9-2026.pdf"]}},"wynwood-horizon-dubai":{"set":{"cl":[["Sold as off-plan (stage as published by an independent source)","verified","independent","https://www.propertyfinder.ae/en/new-projects/imtiaz-developments/wynwood-horizon"],["DLD project register: project 4133, status Active, completion date on the register 30 Oct 2028, 9.59% built at the DLD inspection of 16 Sep 2026, escrow account bank Ajman Bank /, registered developer Imtiaz Gi Real Estate Development L.L.C (DLD developer 2323) (register read 13 Oct 2026 as mirrored on dubairealestateiq.com; page read 13 Nov 2026)","verified","registry","https://dubairealestateiq.com/project/wynwood-horizon-by-imtiaz"],["The developer page read on 13 Nov 2026 prints: \"construction progress 15 overall ESTIMATED COMPLETION DATE Q2 2028\"","unverified","none","https://imtiaz.ae/property/wynwood-horizon-by-imtiaz"]],"ev":{"permit":"Registered as DLD project 4133, status Active, on the DLD project register (register read 13 Oct 2026, mirrored on dubairealestateiq.com; read 13 Nov 2026)","escrow":"DLD register: escrow account bank Ajman Bank / (register read 13 Oct 2026, mirrored on dubairealestateiq.com)","progress":"DLD inspection of 16 Sep 2026: 9.59% built (DLD project register, mirrored on dubairealestateiq.com)"},"fx":{"developer_company":"Imtiaz Gi Real Estate Development L.L.C (DLD developer 2323)","handover_promised":"2028-Q4"},"pn":"DLD project registration 4133","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","DLD project register (dubairealestateiq.com mirror)","https://dubairealestateiq.com/project/wynwood-horizon-by-imtiaz"],"ho":["future","DLD register completion 30 Oct 2028; 9.59% built at the inspection of 16 Sep 2026; developer page: \"construction progress 15 overall ESTIMATED COMPLETION DATE Q2 2028\"","https://dubairealestateiq.com/project/wynwood-horizon-by-imtiaz"],"co":["found","DLD developer register (mirror)","https://dubairealestateiq.com/project/wynwood-horizon-by-imtiaz"],"sq":{"handover":"registry","permit":"registry","developer":"registry"},"miss":null},"src":["https://imtiaz.ae/property/wynwood-horizon-by-imtiaz","https://www.propertyfinder.ae/en/new-projects/imtiaz-developments/wynwood-horizon","https://dubairealestateiq.com/project/wynwood-horizon-by-imtiaz"],"st":"under construction"}},"x-the-building-san-francisco-panama":{"set":{"rvw":null}},"x1-trafford-waters-x1-developments":{"set":{"rvw":null}},"xamaras-tribe-villas":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer"},"miss":null}}},"xamaras-wellness-retreat":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Indonesia","https://kolaboro.com/registers/"],"ho":["none","no date published",null],"co":null,"sq":{"handover":"developer","permit":"developer","price":"developer","developer":"developer"},"miss":null}}},"xelf-by-sansiri":{"set":{"cl":[["Developer construction-progress page (photos taken November 2026): overall progress 13%, expected completion August 2028; it states the EIA has been approved and a construction permit issued","verified","developer","https://www.sansiri.com/projectprogress/en/695"],["EIA approved","unverified","none","https://www.sansiri.com/projectprogress/en/const-detail.php?pcpi=190"],["Construction permit issued","unverified","none","https://www.sansiri.com/projectprogress/en/const-detail.php?pcpi=190"],["Sansiri PCL registered and active (0107538000665)","verified","registry","https://eia.onep.go.th/eia/owner-detail?owner_id=4869"],["Piling 89% complete (Oct 2026)","unverified","none","https://www.sansiri.com/projectprogress/en/const-detail.php?pcpi=190"],["Completion August 2028 (brochure said July 2028)","contradicted","none","https://baanscope.com/assets/sansiri-xelf-by-sansiri/brochure.pdf"],["946 residential units, 37 storeys","unverified","none","https://www.sansiri.com/condominium/xelf-by-sansiri/en/"],["Land and building not mortgaged","unverified","none","https://baanscope.com/assets/sansiri-xelf-by-sansiri/brochure.pdf"],["Price from THB 3.59M","unverified","none","https://www.sansiri.com/condominium/xelf-by-sansiri/th/"],["JV with Mitsui Fudosan","unverified","none","https://lazudi.com/th-en/bangkok/project/xelf-by-sansiri-15821"],["Construction started August 2025","unverified","none","https://baanscope.com/assets/sansiri-xelf-by-sansiri/brochure.pdf"]],"rvw":{"d":"2026-11-13","ok":false,"pr":"developer","reg":["not found",null,"https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record 2028-Q3; checked against: Developer construction-progress page (photos taken November 2026): overall progress 13%, expected completion August 2028; it states the EIA has been approved and a construction permit issued","https://www.sansiri.com/projectprogress/en/695"],"co":null,"sq":{"handover":"developer","permit":"registry","price":"developer","developer":"registry"},"miss":null},"src":["https://baanscope.com/assets/sansiri-xelf-by-sansiri/brochure.pdf","https://baanscope.com/projects/sansiri-xelf-by-sansiri","https://eia.onep.go.th/eia/owner-detail?owner_id=4869","https://lazudi.com/th-en/bangkok/project/xelf-by-sansiri-15821","https://novasia.estate/en/projects/xelf-by-sansiri/","https://www.sansiri.com/condominium/xelf-by-sansiri/en/","https://www.sansiri.com/condominium/xelf-by-sansiri/th/","https://www.sansiri.com/projectprogress/en/","https://www.sansiri.com/projectprogress/en/const-detail.php?pcpi=190","https://www.sansiri.com/projectprogress/th/","https://www.sansiri.com/projectprogress/en/695"],"url":"https://www.sansiri.com/projectprogress/en/695"}},"xo-parq-palma-xojay":{"set":{"rvw":null}},"xook-temozon-norte-grupo-orve":{"set":{"rvw":null}},"xt-10-ekkamai":{"set":{"cl":[["ONEP EIA register lists report 256712-49 for \"โครงการ XT 10 EKKAMAI (เอ็กซ์ที เทน เอกมัย)\" with approval ทส 1009.5/15030 dated 8 Aug 2025","verified","registry","https://eia.onep.go.th/services/web/open-api/eia-list?page=5"],["Developer construction-progress page (photos taken November 2026): overall progress 10%, expected completion February 2029; it states the EIA has been approved and a construction permit issued","verified","developer","https://www.sansiri.com/projectprogress/en/707"],["\"Expected completion date: February 2029\"; overall construction progress 10%, updated 10 November 2026","unverified","none","https://www.sansiri.com/projectprogress/en/"],["29 storeys and 933 units, between Ekkamai Soi 10 and 12","unverified","none","https://www.sansiri.com/condominium/xt-10ekkamai/en/"],["Map link on the developer page points to 13.7337829, 100.5843811","unverified","none","https://www.sansiri.com/condominium/xt-10ekkamai/en/"]],"ev":{"permit":"Thailand ONEP EIA open register: report 256712-49, approval ทส 1009.5/15030 dated 8 Aug 2025 (read 13 Nov 2026)","progress":"Sansiri construction-progress page: 10% (photos November 2026, read 13 Nov 2026)","plans":"Developer page has floor plans and unit layouts (opened 13 Nov 2026)","returns_ok":"No guaranteed-return wording on the developer page (opened 13 Nov 2026)"},"pn":"EIA report 256712-49, ONEP approval ทส 1009.5/15030 (8 Aug 2025)","rvw":{"d":"2026-11-13","ok":true,"pr":"registry+developer","reg":["found","Thailand ONEP EIA register (report 256712-49, approval ทส 1009.5/15030)","https://eia.onep.go.th/services/web/open-api/eia-list"],"ho":["future","date on record February 2029; checked against: Developer construction-progress page (photos taken November 2026): overall progress 10%, expected completion February 2029; it states the EIA has been approved and a construction permit issued","https://www.sansiri.com/projectprogress/en/707"],"co":null,"sq":{"handover":"developer","permit":"registry","developer":"developer"},"miss":null},"rw":{"register":"Thailand ONEP EIA register","item":"environmental approval","status":"approved","detail":"approval ทส 1009.5/15030 dated 08/08/2568 (Thai calendar)","code":"256712-49","checked":"2026-11-13"},"src":["https://www.sansiri.com/condominium/xt-10ekkamai/en/","https://www.sansiri.com/projectprogress/en/","https://eia.onep.go.th/services/web/open-api/eia-list?page=5","https://www.sansiri.com/projectprogress/en/707"]}},"yalikavak-loft-akfen-gyo":{"set":{"rvw":null}},"yekta-golden-valley-yekta-homes":{"set":{"rvw":null}},"yolo-kiribathgoda-prime-lands":{"set":{"rvw":null}},"yucca-france":{"set":{"rvw":null}},"za-hra-k-prague":{"set":{"rvw":null}},"zamajal-tulum":{"set":{"rvw":null}},"zaya-kuta-hills-mojo-developments":{"set":{"rvw":null}},"zen-gardens-bar-novokub":{"set":{"rvw":null}},"zenergy-bali":{"set":{"rvw":null}},"zestia-algarve":{"set":{"rvw":{"d":"2026-11-13","ok":true,"pr":"developer","reg":["no public per-project search","see kolaboro.com/registers/ for Portugal","https://kolaboro.com/registers/"],"ho":["none","no date published","https://www.vilamouraworld.com/real-estate/zestia/"],"co":null,"sq":{"handover":"developer"},"miss":null}}},"zetland-square":{"set":{"rvw":null}},"zuba-trinidad-zuba-25-and-zuba-26-paraguay":{"set":{"rvw":null}}}}
