{"api":"kolaboro-questions-v1","licence":"CC BY 4.0 (credit: Kolaboro, kolaboro.com)","rules":"Each question comes from one gap in the public record (a fact not published, not confirmed in a register, a handover date that moved or passed, a claim another source contradicts). Rules only; the same record gives the same questions.","page":"https://kolaboro.com/nl/projects/residensi-lili-1-residensi-lili-2-residensi-lili-3-residensi-lili-4/questions/","id":"MYS-303","slug":"residensi-lili-1-residensi-lili-2-residensi-lili-3-residensi-lili-4","name":"Residensi Lili 1, Residensi Lili 2, Residensi Lili 3 & Residensi Lili 4","developer":"Setia Indah Sdn. Bhd.","lang":"nl","built":"2026-11-25","questions":[{"g":"money","k":"plan","q":"Wat is het betalingsschema: hoeveel, op welke datum of bouwfase, en wie bevestigt elke fase voordat ik die betaal?","why":"Geen betalingsschema gepubliceerd op de gelezen pagina's.","src":"https://teduh.kpkt.gov.my/api/projek-swasta/8118-79"},{"g":"date","k":"penalty","q":"Staat de opleverdatum november 2029 in het contract, met een boete per maand vertraging?","why":"Een gepubliceerde datum beschermt u alleen als het contract die bevat, met een boete.","src":"https://teduh.kpkt.gov.my/api/projek-swasta/8118-79"},{"g":"unit","k":"plans","q":"Kunt u de plattegronden en de technische omschrijving sturen die bij het contract worden gevoegd?","why":"Geen plattegronden op de gelezen pagina's.","src":"https://teduh.kpkt.gov.my/api/projek-swasta/8118-79"}],"gaps_read":11,"groups":["money","legal","date","unit","claims"]}