{"api":"kolaboro-questions-v1","licence":"CC BY 4.0 (credit: Kolaboro, kolaboro.com)","rules":"Each question comes from one gap in the public record (a fact not published, not confirmed in a register, a handover date that moved or passed, a claim another source contradicts). Rules only; the same record gives the same questions.","page":"https://kolaboro.com/nl/projects/erinaz-suites-kubang-kerian/questions/","id":"MYS-209","slug":"erinaz-suites-kubang-kerian","name":"Erinaz Suites @ Kubang Kerian","developer":"EXSIM Kubang Kerian Sdn. Bhd.","lang":"nl","built":"2026-11-23","questions":[{"g":"money","k":"plan","q":"Wat is het betalingsschema: hoeveel, op welke datum of bouwfase, en wie bevestigt elke fase voordat ik die betaal?","why":"Geen betalingsschema gepubliceerd op de gelezen pagina's.","src":"https://teduh.kpkt.gov.my/api/projek-swasta/30371-1"},{"g":"date","k":"penalty","q":"Staat de opleverdatum september 2030 in het contract, met een boete per maand vertraging?","why":"Een gepubliceerde datum beschermt u alleen als het contract die bevat, met een boete.","src":"https://teduh.kpkt.gov.my/api/projek-swasta/30371-1"},{"g":"unit","k":"plans","q":"Kunt u de plattegronden en de technische omschrijving sturen die bij het contract worden gevoegd?","why":"Geen plattegronden op de gelezen pagina's.","src":"https://teduh.kpkt.gov.my/api/projek-swasta/30371-1"}],"gaps_read":11,"groups":["money","legal","date","unit","claims"]}