{"api":"kolaboro-questions-v1","licence":"CC BY 4.0 (credit: Kolaboro, kolaboro.com)","rules":"Each question comes from one gap in the public record (a fact not published, not confirmed in a register, a handover date that moved or passed, a claim another source contradicts). Rules only; the same record gives the same questions.","page":"https://kolaboro.com/nl/projects/dwi-rimbun-kasia/questions/","id":"MYS-546","slug":"dwi-rimbun-kasia","name":"Dwi@rimbun Kasia","developer":"Meadowfield Sdn. Bhd.","lang":"nl","built":"2026-11-25","questions":[{"g":"money","k":"plan","q":"Wat is het betalingsschema: hoeveel, op welke datum of bouwfase, en wie bevestigt elke fase voordat ik die betaal?","why":"Geen betalingsschema gepubliceerd op de gelezen pagina's.","src":"https://teduh.kpkt.gov.my/api/projek-swasta/12059-2"},{"g":"date","k":"past","q":"De vastgelegde opleverdatum is 48 maanden voorbij. Wat is de stand nu, wat is de nieuwe datum op papier, en welke vergoeding geeft het contract?","why":"Vastgelegde opleverdatum 48 maanden voorbij, geen oplevering gemeld.","src":"/promises/"},{"g":"unit","k":"plans","q":"Kunt u de plattegronden en de technische omschrijving sturen die bij het contract worden gevoegd?","why":"Geen plattegronden op de gelezen pagina's.","src":"https://teduh.kpkt.gov.my/api/projek-swasta/12059-2"}],"gaps_read":11,"groups":["money","legal","date","unit","claims"]}