{"api":"kolaboro-history-v1","id":"WAR-014","slug":"dzielnica-mieszkaniowa-metro-zachod","page":"https://kolaboro.com/projects/dzielnica-mieszkaniowa-metro-zachod/","versions_n":1,"diff":"RFC 6902 operations (op, path, value); \"old\" holds the value replaced or removed; list items of claims, sources and facts compare as whole items","record_hash":"SHA-256 of the record as JSON with sorted keys, no spaces, UTF-8","snapshots":"https://kolaboro.com/data/snapshots/","note":"Each version is the record as published on that day (from the dated snapshot copies, or the live file for the newest day). \"changes\" lists what changed since the version before.","licence":"CC BY 4.0 (credit: Kolaboro, kolaboro.com)","versions":[{"version":1,"date":"2026-11-17","record_sha256":"0d896ecc0e1a1063935294bed97104062ceefbc78f137410a2660472e75c9a3e","snapshot_sha256":"4f2af79bff82a2f4f9213e6934f01106ff0572f2dc2b120a84f698723b8b800f","changes":null,"record":{"ad":"2026-11-17","ar":"ul. Lazurowa 21, Bemowo, Warszawa","cl":[["Address published: ul. Lazurowa 21, Bemowo, Warszawa","unverified","none","https://www.domd.pl/pl-pl/warszawa/lista-inwestycji/dzielnica-metro-zachod"],["Handover dates printed on the page (\"Terminy odbiorów\") include: \"Etap 13.1 - budynek A to 3 kw. 2026\", \"Etap 8.1 - budynki A i C to 4 kw. 2026\", \"Etap 8.2 - budynki B i D to 3 kw. 2027\"; the page says a station of the second metro line (Chrzanów) is being built in the centre of the district","unverified","none","https://www.domd.pl/pl-pl/warszawa/lista-inwestycji/dzielnica-metro-zachod"],["Map on the developer page points to 52.22535, 20.89280","unverified","none","https://www.domd.pl/pl-pl/warszawa/lista-inwestycji/dzielnica-metro-zachod"],["Pin: 52.225349, 20.8928 (coordinates of the investment on the map of the developer page); coordinates as published on the source page","unverified","none","https://www.domd.pl/pl-pl/warszawa/lista-inwestycji/dzielnica-metro-zachod"]],"co":"Poland","dl":["Address published: ul. Lazurowa 21, Bemowo, Warszawa","Handover dates printed on the page (\"Terminy odbiorów\") include: \"Etap 13.1 - budynek A to 3 kw. 2026\", \"Etap 8.1 - budynki A i C to 4 kw. 2026\", \"Etap 8.2 - budynki B i D to 3 kw. 2027\"; the page says a station of the second metro line (Chrzanów) is being built in the centre of the district","Map on the developer page points to 52.22535, 20.89280","Pin: 52.225349, 20.8928 (coordinates of the investment on the map of the developer page); coordinates as published on the source page"],"du":null,"dv":"Dom Development S.A.","dvs":"dom-development-s-a","ev":{},"fl":[],"fx":{"developer_company":"Dom Development S.A.","handover_promised":"2027-Q3","lat":52.225349,"lng":20.8928},"id":"WAR-014","mk":"Warsaw","n":"Dzielnica Mieszkaniowa Metro Zachód","pn":null,"rvw":null,"rw":null,"s":"dzielnica-mieszkaniowa-metro-zachod","sealed":"2026-11-17","sha":null,"src":["https://www.domd.pl/pl-pl/warszawa/lista-inwestycji/dzielnica-metro-zachod"],"st":"under construction","sts":null,"url":"https://www.domd.pl/pl-pl/warszawa/lista-inwestycji/dzielnica-metro-zachod"}}]}