{"api":"kolaboro-history-v1","id":"SHJ-016","slug":"the-gate-3-4-at-aljada-arada","page":"https://kolaboro.com/projects/the-gate-3-4-at-aljada-arada/","versions_n":1,"diff":"RFC 6902 operations (op, path, value); \"old\" holds the value replaced or removed; list items of claims, sources and facts compare as whole items","record_hash":"SHA-256 of the record as JSON with sorted keys, no spaces, UTF-8","snapshots":"https://kolaboro.com/data/snapshots/","note":"Each version is the record as published on that day (from the dated snapshot copies, or the live file for the newest day). \"changes\" lists what changed since the version before.","licence":"CC BY 4.0 (credit: Kolaboro, kolaboro.com)","versions":[{"version":1,"date":"2026-11-25","record_sha256":"373935b58a30248843fc1b004e0e02ecdfb8d18f2c3e47db5146ac6efbbc8c24","snapshot_sha256":"71a0aca6897f6efea8d433b2c7d0a24746deee3b9ab96bc7863eb326c7b144b3","changes":null,"record":{"ad":"2026-11-25","ar":"Aljada (East Boulevard), Sharjah","cl":[["Arada release of 12 Mar 2026: The Gate 3-4, a two-building complex at the main entry of East Boulevard opposite SABIS International School Aljada; construction contract for The Gate blocks 3 to 6 awarded to Mohammed Abdulmohsin Al Kharafi and Sons","unverified","developer","https://www.arada.com/en/latest_news/arada-awards-contracts-valued-at-more-than-aed2-billion-to-build-14-apartment-blocks-in-sharjah-megaproject-aljada/"],["Arada release of 12 Mar 2026: contracts run over 26 months, with all blocks scheduled to be delivered in the second quarter of 2028; the release says construction is now under way on more than 2,200 new homes","unverified","developer","https://www.arada.com/en/latest_news/arada-awards-contracts-valued-at-more-than-aed2-billion-to-build-14-apartment-blocks-in-sharjah-megaproject-aljada/"]],"co":"UAE","dl":["Arada release of 12 Mar 2026: The Gate 3-4, a two-building complex at the main entry of East Boulevard opposite SABIS International School Aljada; construction contract for The Gate blocks 3 to 6 awarded to Mohammed Abdulmohsin Al Kharafi and Sons","Arada release of 12 Mar 2026: contracts run over 26 months, with all blocks scheduled to be delivered in the second quarter of 2028; the release says construction is now under way on more than 2,200 new homes"],"du":null,"dv":"Arada","dvs":"arada","ev":{},"fl":[],"fx":{"construction_start":"March 2026","handover_promised":"Q2 2028"},"id":"SHJ-016","mk":"Sharjah","n":"The Gate 3-4 at Aljada","pn":null,"rvw":null,"rw":null,"s":"the-gate-3-4-at-aljada-arada","sealed":"2026-11-25","sha":null,"src":["https://www.arada.com/en/latest_news/arada-awards-contracts-valued-at-more-than-aed2-billion-to-build-14-apartment-blocks-in-sharjah-megaproject-aljada/"],"st":"under construction","sts":null,"url":"https://www.arada.com/en/latest_news/arada-awards-contracts-valued-at-more-than-aed2-billion-to-build-14-apartment-blocks-in-sharjah-megaproject-aljada/"}}]}